Design of Wind Turbines and Storage: A Question of System Optimisation

Größe: px
Ab Seite anzeigen:

Download "Design of Wind Turbines and Storage: A Question of System Optimisation"

Transkript

1 Design of Wind Turbines and Storage: A Question of System Optimisation Auslegung von Windturbinen und Speicher: Eine Frage der Systemoptimierung J. P. Molly; DEWI GmbH, Wilhelmshaven English - Deutsch Introduction Today the specific power installation of wind turbines is designed purely under economic aspects, i.e. a wind farm operator will install the wind turbine type which promises maximum profit. Depending on its design, a wind turbine produces stronger or weaker variations in power output which in connection with a high penetration of the volatile energy sources sun and wind in the electricity supply grid, desired because of the turnaround in energy policy, calls for suitable energy storage and necessary transmission capacities. Storage systems can be used to level out fluctuations in the output of renewable energy sources so that their use within the electricity supply system becomes more predictable under different conditions. One of the problems, however, is that the wind farm operator is not concerned about the output fluctuations of the wind farm, whereas storage system and grid operators have to design their systems to accommodate the fluctuations occurring. Obviously, an optimised system of wind turbine, storage and transport grid is more cost-effective from an overall economic point of view than an uncoordinated, independent design of the three components. If, for example, because of poor wind conditions, wind power achieves only an annual average output of 25% of the rated capacity, only 25% of the electric grid s capacity would be used on average, but the grid Einleitung Windturbinen werden heute in ihrer spezifischen Leistungsinstallation nach betriebswirtschaftlichen Gesichtspunkten ausgelegt, das heißt, der Windparkbetreiber wird diejenige Windturbine installieren, die ihm den größten Gewinn verspricht. Abhängig von der Auslegung der Windturbine produziert diese stärkere oder schwächere Leistungsschwankungen, die in Verbindung mit dem durch die Energiewende angestrebten hohen Anteil der volatilen Energieträger Sonne und Wind die Frage nach geeigneten Energiespeichern und den notwendigen Übertragungskapazitäten für den Stromtransport aufwerfen. Mit den Speichern sollen die Angebotsschwankungen dieser regenerativen Energiequellen so ausgeglichen werden, dass sie im elektrischen Energieversorgungssystem unter verschie densten Randbedingungen vorhersagbar verwendet wer den können. Eine der Schwierigkeiten liegt allerdings darin, dass den Windparkbetreiber die Abgabeschwankungen seines Windparks nicht interessieren und der Speicher- und Netzbetreiber wiederum sein System nach den auftretenden Energieschwankungen auslegen muss. Es liegt jedoch auf der Hand, dass ein in der Auslegung optimiertes System aus Wind turbine, Speicher und Transportnetz volkswirtschaftlich gesehen preisgünstiger wird als eine nicht aufeinander abgestimmte, unabhängige Auslegung der drei Komponenten. DEWI MAGAZIN NO. 40, FEBRUARY

2 3,5 3,0 v = mittlere Windgeschwindigkeit in 100m Nabenhöhe average wind velocity at 100m hub height (Rayleigh distribution) v = 5 m/s Fig. 1: Abb. 1: Relative energy production costs as a function of the specific power installation of the wind turbine and with the site-specific wind speed as parameter. Relative Energieerzeugungskosten in Abhängigkeit der spezifischen installierten Leistung der Windturbine und mit der Standortwindgeschwindigkeit als Parameter. Spezifische Energieerzeugungskosten Specific Energy Generation Cost 2,5 2,0 1,5 1,0 0,5 0, Spezifische installierte Leistung / Specific Power Installation, W/m² v = 6 m/s v = 7 m/s V = 8 m/s v = 10 m/s v = 12 m/s Nordsee / North Sea Wiefels Neuentwicklungen / New Developments Heutige Windturbinen / Today's Wind Turbines would still have to be designed for the rated power output achieved during less than 10% of the time, in other words, it would have to be able to transport four times as much power. If under the same wind conditions the capacity factor of wind energy were 50%, the degree of capacity utilisation of the grid would be much higher, i.e. on average the same transmission line would be able to transport twice the amount of energy with the same rated wind power output. However, the wind turbine with the high capacity factor produces less energy in relation to the rotor disk area under the same wind conditions, i.e. it can only be operated economically when a higher remuneration is paid. A similar connection exists between wind turbine design and required storage capacity. It is therefore necessary and reasonable from an overall economic point of view to design the system consisting of wind turbine, storage and transmission in such a way that on the whole it will cause the lowest possible cost of energy. While the energy supply monopolies were still in place, i.e. when production, transport and distribution of energy were in one hand, the utilities were responsible for the economically optimised design of the energy supply system consisting of the three components mentioned above. Because energy prices were under public supervision, this type of business driven system design more or less complied with the overall economic criteria. Today the question is who is going to be the system supervisor, who will take responsibility for an optimised economic interaction of the parties involved in energy supply. In the past, power stations were built where the consumers were. This meant short transmission routes to the customer or in other words, a cost-optimised supply system. The idea to build a power station in Schleswig-Holstein (Northern Germany) when electric energy was needed in an industrial area in Southern Germany would never have occurred to a power company. By contrast, renewable energy plants are built where the energy source is available, i.e. normally where the wind farm or solar plant operator finds the most favourable conditions, which is not necessarily in the vicinity of consumers. The present article deals with the cost-optimised design of wind turbines and the possible cost-optimised design of a system consisting of wind turbine and storage system. In this connection it is necessary to correct part of the statement made in the article Rated Power of Wind Turbines: What is Best? Erreicht die Windenergie beispielsweise eine windbedingte Durchschnittsleistung von 25% der Nennleistung, ist das Netz im Durchschnitt nur zu 25% ausgelastet, müsste aber für die weniger als 10% der Zeit auftretende Nennleistung ausgelegt werden, also die vierfache Leistung transportieren können. Wäre der Kapazitätsfaktor der Windenergie unter denselben Windbedingungen 50%, so ist die Auslastung des Netzes wesentlich höher, d.h., mit derselben Leitung kann im Durchschnitt bei derselben Windnennleistung die doppelte Energiemenge transportiert werden. Allerdings produziert die Windturbine mit dem hohen Kapazitätsfaktor bei den gleichen Windbedingungen weniger Energie bezogen auf ihre Rotorkreisfläche, wäre also nur bei Zahlung einer höheren Vergütung wirtschaftlich zu betreiben. Ein ähnlicher Zusammenhang besteht zwischen Windturbinenauslegung und erforderlicher Speichergröße. Es ist also notwendig und volkswirtschaftlich sinnvoll, das System aus Windturbine, Speicher und Übertragung so auszulegen, dass es insgesamt zu den niedrigsten Energiekosten führt. Im Zeitalter der Energieversorgungsmonopole, also zu Zeiten als Erzeugung, Transport und Verteilung der Energie in einer Hand lagen, übernahmen die Energieversorger die betriebswirtschaftlich optimierte Auslegung dieses aus den genannten drei Komponenten gestalteten Energieversorgungssystems. Durch öffentliche Kontrolle der Energiepreisgestaltung genügte diese Art der betriebswirtschaftlichen Systemauslegung mehr oder weniger den volkswirtschaftlichen Kriterien. Heute stellt sich die Frage, wer der Systemverantwortliche ist, wer für das optimierte volkswirtschaftliche Zusammenwirken der verschiedenen an der Energieversorgung Beteiligten verantwortlich ist. Früher wurden die Kraftwerke dort gebaut, wo der Verbraucher war. Das bedeutete kurze Übertragungswege bis zum Kunden oder mit anderen Worten, ein kostenoptimiertes Versorgungssystem. Kein Energieversorger wäre auf die Idee gekommen, in Schleswig-Holstein ein Kraftwerk zu bauen, wenn er in einer Industrieregion in Süddeutschland elek trische Energie benötigte. Anlagen zur regenerativen Strom er zeugung werden aber dort gebaut, wo die Energiequelle zu haben ist, d.h. in der Regel dort, wo für den Windoder Solarparkbetreiber die günstigsten Standorte sind, nicht aber unbedingt dort, wo der Verbraucher ist. In der folgenden Abhandlung wird die kostenoptimierte Auslegung der Windturbine und die mögliche kostenoptimierte 24 DEWI MAGAZIN NO. 40, FEBRUARY 2012

3 published in DEWI magazine No. 38. In this article, 400 W/m² had wrongly been assumed to be the cost-optimised size of rated capacity installed in a wind turbine, because the majority of wind turbines for normal wind belong to this category. It therefore seemed obvious to assume that the industry considers this size of installed capacity as the cost optimum when designing a wind turbine. Even while working on the previous article, I came across the phenomenon that the specific power installation thought to produce the most cost-effective kilowatt hour could not be the usual 400 W/m² available on the market, but must be considerably lower according to the computation model I had devised. I therefore assumed, wrongly, that my simplified model did not reflect the reality properly, but only showed the changing trend when varying the installed power. In the meantime I had to recognise that the more or less forced standardisation to the value of 400 W/m² described in my article was wrong. Although the resulting trend of the cost development is correct, according to new and more detailed calculations the minimum energy production cost of a wind turbine is reached at a significantly lower specific power installation. In the second part of this report, the cost trend for the kilowatt hour produced in relation to the installed specific power of the wind turbine is coupled with the capacity-related cost trend of a storage system not further specified in order to find the optimum cost of energy production for a system comprising both components. Development of Wind Turbine Cost as a Function of the Installed Specific Rated Power The principle of the method described in the article Rated Power of Wind Turbines: What is Best? remains the same. It is based on keeping a certain rotor diameter constant and then changing the rated power of the generator installed. If the rotor speed is kept constant (constant blade tip speed) the torque will change in proportion to the power output. To be able to transmit the torque, the necessary material masses of the individual components depend directly or indirectly on the torque. In the computational model used the following components have been taken into account: rotor blade, hub, gearbox, generator, nacelle structure, tower, foundation, grid connection. For each of these components a certain price/ mass ( /kg) ratio is used which is considered to be constant irrespective of the size of the components, so that the price of each component results from the mass derived from torque, output, thrust etc. The resulting production costs of the differently designed theoretical wind turbines are set in relation to the annual energy yield at various annual mean wind speeds, as shown in Fig. 1. From the diagram in Fig. 1 the following approximate information can be obtained: For one thing, it is clear that for inland sites with low wind speed the cost minimum for the wind turbine is very distinctive, i.e. the energy production cost will rise very quickly in case of small deviations from the optimum. The stronger the mean site-specific wind speed, the flatter the minimum, i.e. the cost for the production of a kilowatt hour will rise only slightly if the design of the wind turbine does not meet the cost minimum precisely. This means that for weakwind sites it is very important to choose the correct output for the wind turbine (weak-wind turbine), whereas with strongwind sites the need for an exact adaptation of the output to the site-specific wind speed is less important. Auslegung eines Systems aus Windturbine und Speicher behandelt. In diesem Zusammenhang muss auch ein Teil der Aus sage des Artikels Leistungsinstallation bei Windturbinen: Was ist richtig?, veröffentlicht im DEWI Magazin Nr. 38, korrigiert werden. Darin wurde fälschlicherweise von 400 W/m² als kostenoptimierte Leistungsinstallation für Windturbinen ausgegangen, denn das Gros der Windturbinen für normalen Wind lag in dieser Größenordnung. Es lag also nahe, anzunehmen, dass die Industrie diese Leistungsinstallation als das Kostenoptimum bei der Auslegung einer Windturbine ansieht. Schon bei der Ausarbeitung des damaligen Artikels trat allerdings die Merkwürdigkeit auf, dass die zur Erzeugung der kostengünstigsten Kilowattstunde genannte spezifische Leistungsinstallation nicht die üblichen im Markt vorzufindenden ca. 400 W/m² sein könne, sondern nach dem von mir ausgearbeiteten Rechenmodell eigentlich deutlich niedriger hätte liegen müssen. Ich kam daher zu der fälschlichen Annahme, dass mein stark vereinfachtes Rechenmodell die Wirklichkeit nicht richtig wiedergab, sondern nur die Veränderungstendenz bei Variation der installierten Leistung. Heute muss ich einsehen, dass meine im genannten Artikel dargestellte, mehr oder weniger erzwungene Normierung auf den Wert von 400 W/m² falsch war. Zwar sind die sich ergebenden Tendenzen der Kostenentwicklung richtig, aber die Kostenminima liegen nach den neueren und detaillierteren Berechnungen bei deutlich niedrigeren Leistungsinstallationen. Diese von der installierten spezifischen Leistung der Windturbine abhängige Kostentendenz für die erzeugte Kilowattstunde wird im zweiten Teil des Berichts mit einer speicherkapazitätsabhängigen Kostenentwicklung eines nicht weiter spezifizierten Speichers gekoppelt, um das Kostenoptimum der Energieerzeugung für das System aus beiden Komponenten zu finden. WEA-Kostenentwicklung in Abhängigkeit der installierten spezifischen Nennleistung Das Prinzip des im Artikel Leistungsinstallation bei Windtur binen: Was ist richtig? angewandten Verfahrens wurde bei behal ten. Dieses basiert darauf, einen bestimmten Rotordurchmesser konstant zu halten und dann die Nennleistung des in stallierten Generators zu ändern. Wird die Drehzahl konstant gelassen (konstante Blattspitzengeschwindigkeit), dann ändert sich das Drehmoment proportional mit der Leistung. Um das Drehmoment übertragen zu können, muss eine direkt oder indirekt vom Drehmoment abhängige Materialmasse der einzelnen Komponenten vorhanden sein. In dem benutzten Berechnungsmodell sind folgende Komponenten berücksichtigt: Rotorblatt, Nabe, Getriebe, Generator, Gondelstruktur, Turm, Fundament, Netzanschluss. Für jede dieser Komponenten wird ein bestimmter Preis/Masse ( /kg) verwendet, der unabhängig von der Größe der einzelnen Kom po nenten als konstant angesehen wird, so dass sich der Preis der Komponente entsprechend der aus Drehmoment, Leistung, Schub, etc. abgeleiteten Masse ergibt. Die sich daraus ergebenden Herstellungskosten der verschieden ausgelegten theoretischen Wind turbinen werden mit dem jährlichen Energieertrag bei verschiedenen mittleren Jahreswindgeschwindigkeiten in Beziehung gesetzt, so dass sich die Darstellung in Abb. 1 ergibt. Aus dem Diagramm Abb. 1 können mehrere Informationen näherungsweise entnommen werden. Zunächst wird deutlich, dass für Binnenlandstandorte mit geringer Windgeschwindigkeit das Kostenminimum für die WEA sehr ausgeprägt 26 DEWI MAGAZIN NO. 40, FEBRUARY 2012

4 50% Fig. 3: Abb. 3: Relative variation of costs for the energy generated by the wind turbine, for storage and for the sum of both components. Relative Veränderung der Kosten für die von der WEA erzeugte Energie, für den Speicher und für die Summe beider Komponenten Relative Speicher- und Energieerzeugungskosten, % Relative Storage and Energy Yield Costs, % 40% 30% 20% 10% 0% -20% -30% -40% 50% Kostentendenz von Windenergie + Speicher Cost Tendency for Windenergy + Storage Tendenz Windenergie-Erzeugungskosten Wind Energy Cost Tendency Normiert auf / Normalised to: Windturbine / Wind Turbine: 350 W/m², 150 m Rotordurchmesser / Rotor Diameter Offshoreleistung / Offshore Power: MW Energieertrag / Energy Yield: 51,68 TWh/a Speichermenge / Storage Capacity: 16,88 TWh Energieabgabe / Energy Supply: konst. Durchschnittsleistung / const. Power Output Spezifische installierte Leistung / Specific Installed Capacity, W/m² Tendenz Speicherkosten Storage Cost Tendency % Neuentwicklungen / New Developments Heutige Windturbinen / Today's Wind Turbines new wind turbines for weak-wind sites with a power installation between 220 and 250 W/m² for wind speeds between 6 and 7 m/s fit into the scheme of diagram Fig. 1. Effects of the Lower Specific Rated Power Installation in Wind Turbines As a consequence of this development it can be noted that the new design of wind turbines with relatively low specific power installation results in higher capacity factors and therefore due to lower fluctuations in the energy output requires less storage capacity and leads to a better utilization of the transmission grids. Now we have to find out if this reduction of the specific rated power in connection with a storage system is already sufficient or if a further reduction is necessary to minimise the cost of the energy supply system Wind. In the following the impact of the wind turbine s capacity factor on the storage capacity will be investigated, because with the modification of the specific power the required storage capacity will also rise or fall and so increase or reduce the costs for production and operation of the storage facility. For a basic estimation of the cost behaviour of wind turbines and storage system together it is sufficient to make a rough estimate of the storage cost in proportion to its capacity, in other words, a required storage capacity is to be defined which changes in proportion to the capacity factor of the wind turbine. Greatly simplified, we can assume that over the year, wind turbine and storage output together always equal the average power output of the wind turbine (zero storage loss). In that case the curves would be as depicted in Fig. 2. A wind turbine with 350 W/m² installed offshore would feature a power duration curve as in Fig. 2, with an average power output of W/m² (capacity factor = 0.59), another wind turbine with 200 W/m² would reach an average output of 140 W/m² (capacity factor = 0.70). If the wind turbine were to be operated constantly at average power output, then all output in excess of the average output would have to be stored (red area), and if the wind turbine output should fall below the average output, this missing power would have to be drawn from the storage (blue area). With lost-free storage, both areas are of the same size. The smaller areas for the wind turbine with a lower specific power installation of 200 W/m² ermittelten deutlich höheren 360 W/m² aus dem oben erwähnten Artikel im DEWI Magazin. Allerdings war ich in der Zwischenzeit für den vergleichbaren Fall selbst auf einen erheblich niedrigeren Wert von etwa 280 W/m² gelangt (Abb. 1, Wiefels = 7,4 m/s). Seit dieser Zeit im Frühjahr 2011 wurden dann überraschend Windturbinen angekündigt, die genau in das Diagramm Abb. 1 hineinpassen. Beispielsweise die neuen Offshore-Windturbinen mehrerer Hersteller in der Größenordnung 150 m Rotordurchmesser und 6 MW bzw. 164 m und 7 MW. Sie alle liegen zwischen 330 W/m² und 340 W/m², während die heute offshore aufgestellten Windturbinen der 5 bis 6,5 MW-Klasse mit einer spezifischen Leistung von 430 bis 560 W/m² deutlich höher liegen. Aber auch die neuen Schwachwind-Windturbinen liegen mit 220 bis 250 W/m² für Windgeschwindigkeiten zwischen 6 und 7 m/s nicht anders als das Diagramm Abb. 1 erwarten lässt. Auswirkungen der niedrigen spezifischen Nennleistung der Windturbinen Als Ergebnis dieser Entwicklung lässt sich festhalten, dass die neue Auslegung der Windturbinen mit relativ niedriger spezifischer Leistung höhere Kapazitätsfaktoren bewirkt und deshalb wegen der geringeren Energieabgabefluktuation zu kleinerer Speicherkapazität und auch zu besserer Auslastung der Übertragungsnetze führt. Es gilt jetzt abzuleiten, ob diese Absenkung der spezifischen Nennleistung im Zusammenwirken mit einem Speicher schon ausreicht oder ob eine weitere Absenkung zur Kostenminimierung des Energieversorgungssystems Wind notwendig ist. Hier soll nun die Auswirkung des Kapazitätsfaktors der Windturbine auf die Speicherkapazität untersucht werden, denn mit der Veränderung der spezifischen Leistung wird die erforderliche Speicherkapazität steigen oder sinken und damit sich der Kostenaufwand für die Herstellung und den Betrieb des Speichers verteuern oder verbilligen. Für eine prinzipielle Abschätzung des Kostenverhaltens von Wind turbine und Speicher zusammen genügt es, die Speicherkosten näherungsweise proportional zu seiner Kapazität anzunehmen. Es gilt also einen Speicherkapazitätsbedarf zu definieren, der sich mit dem Kapazitätsfaktor der Windturbine verändert. Stark vereinfacht könnte angenommen werden, dass Windturbine und Speicher über das Jahr gesehen 28 DEWI MAGAZIN NO. 40, FEBRUARY 2012

5 show that such a wind turbine requires less storage capacity, i.e. the storage cost should be lower. When combining the cost trend for the energy produced by the wind turbine from Fig. 1 with the cost trend for the storage system, the costs for one kilowatt hour of wind power including storage costs would result in the cost trend shown in Fig. 3, depending on the specific power installation of the wind turbine. When the costs for wind energy production and storage are standardised to a bench mark value of 350 W/m², the cost minimum of the wind turbine/storage system would be reached at approx. 225 W/m² under the assumptions made, i.e. tending once more towards a lower power installation per square metre rotor area of the wind turbine. In case of lossfree storage, with a power installation of 350 W/m² approx. 32.7% of the energy produced by the wind turbine would have to be stored in order to supply the constant average output of the wind turbine for one year; in case of 225 W/m² this would be only 27.7%. Conclusion This theoretical model shows that today's development of wind turbines towards a lower rated power installation is a step in the right direction. According to this model, wind turbines installed offshore with a specific rated power of 430 to 560 W/m² would produce energy approx. 3 to 10% more expensively than wind turbines with 310 to 380 W/m² (Fig. 1). If an optimally designed wind turbine is combined with a storage technology, which, assuming loss-free storage, ensures a constant supply of the average output of the wind turbine over the period of one year, it would be possible, with a specific power installation of the wind turbine of 225 W/m², to produce the resulting kilowatt hour at approx. 9% less cost than with a wind turbine of 350 W/m². This of course means that a financial incentive would need to be offered to the wind farm operator to encourage him to install the wind turbine with the lower rated power of 225 W/m², because from a business point of view this turbine would produce the kilowatt hour approx. 7.5% more expensively than a wind turbine with 350 W/m². Despite the additional remuneration the energy produced by the wind turbine/storage system would still be 9% less expensive, i.e. the consumer would have to pay less. The model presented here does not take into account cost savings through a better utilisation of the transmission grids, nor any storage losses. zusammen immer die Durchschnittsleistung der Windturbine abgeben (Speicherverluste gleich null). Dann würde sich eine Darstellung wie in Abb. 2 ergeben. Eine Windturbine mit 350 W/m² würde an einem Offshore-Standort eine Leis tungsdauerlinie wie in Abb. 2 aufweisen, mit einer auf das Jahr bezogenen Durchschnittsleistung von 206,5 W/m² (Kapa zi tätsfaktor = 0,59), eine andere mit 200 W/m² käme auf 140 W/m² Durchschnittsleistung (Kapazitätsfaktor = 0,70). Soll die Windturbine konstant mit der Durchschnittsleistung betrieben werden, dann müssten alle Leistungen, die größer als die Durchschnittsleistung sind, gespeichert werden (rote Fläche) und bei Leistungen der Windturbine geringer als die Durchschnittsleistung diese aus dem Speicher bezogen werden (blaue Fläche). Bei verlustfreier Speicherung sind beide Flächen gleich groß. Wie die betreffenden kleineren Flächen für die Windturbine mit der geringeren spezifischen Leistung von 200 W/m² zeigen, benötigt diese Windturbine eine geringere Speichergröße, d. h. die Speicherkosten müssten geringer sein. Wird die Kostenentwicklung der von der Windturbine erzeugten Energie aus Abb. 1 mit der Kostenentwicklung des Speichers kombiniert, so ergibt sich für die Kosten der Kilowattstunde aus Wind einschließlich der Speicherkosten die in Abb. 3 dargestellte Kostentendenz in Abhängigkeit der installierten spezifischen Leistung der Windturbine. Werden die Kosten der Windenergiezeugung und die Kosten des Speichers auf den Bezugspunkt 350 W/m² normiert, so liegt bei den getroffenen Annahmen das Kostenminimum des Systems aus Windturbine und Speicher bei ca. 225 W/m², also nochmals hin zu niedrigeren installierten Leistungen pro Quadratmeter Rotorfläche der Windturbine. Bei verlustfreier Speicherung würde bei 350 W/m² etwa 32,7 % der von der Windturbine erzeugten Energie durch den Speicher gehen müssen, um über ein Jahr die konstante Durchschnittsleistung der Windturbine abgeben zu können, bei 225 W/m² wären es nur etwa 27,7 %. Fazit Das theoretische Beispiel zeigt, dass die heute einsetzende Ent wicklung der Windturbinen hin zu niedrigeren installierten Nennleistungen in die richtige Richtung geht. Windturbinen mit spezifischer Nennleistung von 430 bis 560 W/m² wür den die Energie im Offshore-Einsatz nach dem gezeigten Beispiel etwa 3 bis 10% teurer erzeugen als solche mit 310 bis 380 W/m² (Abb. 1 und 3). Wird die optimale Windturbine mit einem Speicher gekoppelt, der bei verlustfreier Speicherung dazu führt, dass über den Zeitraum eines Jahres die Durchschnittsleistung der Windturbine konstant abgegeben werden kann, dann könnte die resultierende Kilowattstunde bei einer spezifischen Leistungsinstallation der Windturbine von 225 W/m² fast 9% preis werter erzeugt werden als mit einer Windturbine von 350 W/m². Dies bedeutet allerdings, dass dem Windparkbetreiber ein finanzieller Anreiz gegeben werden muss, damit er die mit 225 W/m² niedriger installierte Windturbine aufstellt, denn sie würde ja aus seiner betriebswirtschaftlichen Sicht die Kilowattstunde etwa 7,5% teurer erzeugen als jene mit 350 W/m². Trotz dieser Zusatzvergütung wäre dann dennoch die Energieerzeugung des Systems Windturbine/Speicher 9% billiger, d. h. der Stromkunde würde weniger belastet. In diese hier gezeigte Überlegung wurden die Kosteneinsparungen durch die bessere Nutzung der Übertragungsnetze nicht einbezogen, ebenso wie die Speicherverluste unberücksichtigt blieben. DEWI MAGAZIN NO. 40, FEBRUARY

Produzierendes Gewerbe Industrial production

Produzierendes Gewerbe Industrial production Arbeitswelten / Working Environments Produzierendes Gewerbe Industrial production Grüne Technologie für den Blauen Planeten Saubere Energie aus Solar und Fenstern Green Technology for the Blue Planet Clean

Mehr

Frequently asked Questions for Kaercher Citrix (apps.kaercher.com)

Frequently asked Questions for Kaercher Citrix (apps.kaercher.com) Frequently asked Questions for Kaercher Citrix (apps.kaercher.com) Inhalt Content Citrix-Anmeldung Login to Citrix Was bedeutet PIN und Token (bei Anmeldungen aus dem Internet)? What does PIN and Token

Mehr

Lehrstuhl für Allgemeine BWL Strategisches und Internationales Management Prof. Dr. Mike Geppert Carl-Zeiß-Str. 3 07743 Jena

Lehrstuhl für Allgemeine BWL Strategisches und Internationales Management Prof. Dr. Mike Geppert Carl-Zeiß-Str. 3 07743 Jena Lehrstuhl für Allgemeine BWL Strategisches und Internationales Management Prof. Dr. Mike Geppert Carl-Zeiß-Str. 3 07743 Jena http://www.im.uni-jena.de Contents I. Learning Objectives II. III. IV. Recap

Mehr

Labour law and Consumer protection principles usage in non-state pension system

Labour law and Consumer protection principles usage in non-state pension system Labour law and Consumer protection principles usage in non-state pension system by Prof. Dr. Heinz-Dietrich Steinmeyer General Remarks In private non state pensions systems usually three actors Employer

Mehr

Prediction Market, 28th July 2012 Information and Instructions. Prognosemärkte Lehrstuhl für Betriebswirtschaftslehre insbes.

Prediction Market, 28th July 2012 Information and Instructions. Prognosemärkte Lehrstuhl für Betriebswirtschaftslehre insbes. Prediction Market, 28th July 2012 Information and Instructions S. 1 Welcome, and thanks for your participation Sensational prices are waiting for you 1000 Euro in amazon vouchers: The winner has the chance

Mehr

USBASIC SAFETY IN NUMBERS

USBASIC SAFETY IN NUMBERS USBASIC SAFETY IN NUMBERS #1.Current Normalisation Ropes Courses and Ropes Course Elements can conform to one or more of the following European Norms: -EN 362 Carabiner Norm -EN 795B Connector Norm -EN

Mehr

Possible Solutions for Development of Multilevel Pension System in the Republic of Azerbaijan

Possible Solutions for Development of Multilevel Pension System in the Republic of Azerbaijan Possible Solutions for Development of Multilevel Pension System in the Republic of Azerbaijan by Prof. Dr. Heinz-Dietrich Steinmeyer Introduction Multi-level pension systems Different approaches Different

Mehr

Ingenics Project Portal

Ingenics Project Portal Version: 00; Status: E Seite: 1/6 This document is drawn to show the functions of the project portal developed by Ingenics AG. To use the portal enter the following URL in your Browser: https://projectportal.ingenics.de

Mehr

p^db=`oj===pìééçêíáåñçêã~íáçå=

p^db=`oj===pìééçêíáåñçêã~íáçå= p^db=`oj===pìééçêíáåñçêã~íáçå= Error: "Could not connect to the SQL Server Instance" or "Failed to open a connection to the database." When you attempt to launch ACT! by Sage or ACT by Sage Premium for

Mehr

Titelbild1 ANSYS. Customer Portal LogIn

Titelbild1 ANSYS. Customer Portal LogIn Titelbild1 ANSYS Customer Portal LogIn 1 Neuanmeldung Neuanmeldung: Bitte Not yet a member anklicken Adressen-Check Adressdaten eintragen Customer No. ist hier bereits erforderlich HERE - Button Hier nochmal

Mehr

ReadMe zur Installation der BRICKware for Windows, Version 6.1.2. ReadMe on Installing BRICKware for Windows, Version 6.1.2

ReadMe zur Installation der BRICKware for Windows, Version 6.1.2. ReadMe on Installing BRICKware for Windows, Version 6.1.2 ReadMe zur Installation der BRICKware for Windows, Version 6.1.2 Seiten 2-4 ReadMe on Installing BRICKware for Windows, Version 6.1.2 Pages 5/6 BRICKware for Windows ReadMe 1 1 BRICKware for Windows, Version

Mehr

Exercise (Part XI) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1

Exercise (Part XI) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1 Exercise (Part XI) Notes: The exercise is based on Microsoft Dynamics CRM Online. For all screenshots: Copyright Microsoft Corporation. The sign ## is you personal number to be used in all exercises. All

Mehr

eurex rundschreiben 094/10

eurex rundschreiben 094/10 eurex rundschreiben 094/10 Datum: Frankfurt, 21. Mai 2010 Empfänger: Alle Handelsteilnehmer der Eurex Deutschland und Eurex Zürich sowie Vendoren Autorisiert von: Jürg Spillmann Weitere Informationen zur

Mehr

Chemical heat storage using Na-leach

Chemical heat storage using Na-leach Hilfe2 Materials Science & Technology Chemical heat storage using Na-leach Robert Weber Empa, Material Science and Technology Building Technologies Laboratory CH 8600 Dübendorf Folie 1 Hilfe2 Diese Folie

Mehr

Patentrelevante Aspekte der GPLv2/LGPLv2

Patentrelevante Aspekte der GPLv2/LGPLv2 Patentrelevante Aspekte der GPLv2/LGPLv2 von RA Dr. Till Jaeger OSADL Seminar on Software Patents and Open Source Licensing, Berlin, 6./7. November 2008 Agenda 1. Regelungen der GPLv2 zu Patenten 2. Implizite

Mehr

Einsatz einer Dokumentenverwaltungslösung zur Optimierung der unternehmensübergreifenden Kommunikation

Einsatz einer Dokumentenverwaltungslösung zur Optimierung der unternehmensübergreifenden Kommunikation Einsatz einer Dokumentenverwaltungslösung zur Optimierung der unternehmensübergreifenden Kommunikation Eine Betrachtung im Kontext der Ausgliederung von Chrysler Daniel Rheinbay Abstract Betriebliche Informationssysteme

Mehr

Grid Integration of Photovoltaics Technical solutions status quo and prospect

Grid Integration of Photovoltaics Technical solutions status quo and prospect Martin Baart, Business Development Manager Microgrids & Renewable Integration, ABB AG, June 20, 2013 Grid Integration of Photovoltaics Technical solutions status quo and prospect PV Integration Current

Mehr

GIPS 2010 Gesamtüberblick. Dr. Stefan J. Illmer Credit Suisse. Seminar der SBVg "GIPS Aperitif" 15. April 2010 Referat von Stefan Illmer

GIPS 2010 Gesamtüberblick. Dr. Stefan J. Illmer Credit Suisse. Seminar der SBVg GIPS Aperitif 15. April 2010 Referat von Stefan Illmer GIPS 2010 Gesamtüberblick Dr. Stefan J. Illmer Credit Suisse Agenda Ein bisschen Historie - GIPS 2010 Fundamentals of Compliance Compliance Statement Seite 3 15.04.2010 Agenda Ein bisschen Historie - GIPS

Mehr

Extended Ordered Paired Comparison Models An Application to the Data from Bundesliga Season 2013/14

Extended Ordered Paired Comparison Models An Application to the Data from Bundesliga Season 2013/14 Etended Ordered Paired Comparison Models An Application to the Data from Bundesliga Season 2013/14 Gerhard Tutz & Gunther Schauberger Ludwig-Maimilians-Universität München Akademiestraße 1, 80799 München

Mehr

CHAMPIONS Communication and Dissemination

CHAMPIONS Communication and Dissemination CHAMPIONS Communication and Dissemination Europa Programm Center Im Freistaat Thüringen In Trägerschaft des TIAW e. V. 1 CENTRAL EUROPE PROGRAMME CENTRAL EUROPE PROGRAMME -ist als größtes Aufbauprogramm

Mehr

EEX Kundeninformation 2007-09-05

EEX Kundeninformation 2007-09-05 EEX Eurex Release 10.0: Dokumentation Windows Server 2003 auf Workstations; Windows Server 2003 Service Pack 2: Information bezüglich Support Sehr geehrte Handelsteilnehmer, Im Rahmen von Eurex Release

Mehr

KURZANLEITUNG. Firmware-Upgrade: Wie geht das eigentlich?

KURZANLEITUNG. Firmware-Upgrade: Wie geht das eigentlich? KURZANLEITUNG Firmware-Upgrade: Wie geht das eigentlich? Die Firmware ist eine Software, die auf der IP-Kamera installiert ist und alle Funktionen des Gerätes steuert. Nach dem Firmware-Update stehen Ihnen

Mehr

1.9 Dynamic loading: τ ty : torsion yield stress (torsion) τ sy : shear yield stress (shear) In the last lectures only static loadings are considered

1.9 Dynamic loading: τ ty : torsion yield stress (torsion) τ sy : shear yield stress (shear) In the last lectures only static loadings are considered 1.9 Dynaic loading: In the last lectures only static loadings are considered A static loading is: or the load does not change the load change per tie N Unit is 10 /sec 2 Load case Ι: static load (case

Mehr

OEE Overall Equipment Effectiveness. an important KPI for Operational Intelligence. Presented by. Thomas J. Lang

OEE Overall Equipment Effectiveness. an important KPI for Operational Intelligence. Presented by. Thomas J. Lang OEE Overall Equipment Effectiveness an important KPI for Operational Intelligence Presented by Thomas J. Lang Agenda OEE and the usage within BCS Special application of OEE at Frankfurt site Benefit 2

Mehr

Support Technologies based on Bi-Modal Network Analysis. H. Ulrich Hoppe. Virtuelles Arbeiten und Lernen in projektartigen Netzwerken

Support Technologies based on Bi-Modal Network Analysis. H. Ulrich Hoppe. Virtuelles Arbeiten und Lernen in projektartigen Netzwerken Support Technologies based on Bi-Modal Network Analysis H. Agenda 1. Network analysis short introduction 2. Supporting the development of virtual organizations 3. Supporting the development of compentences

Mehr

Accounting course program for master students. Institute of Accounting and Auditing http://www.wiwi.hu-berlin.de/rewe

Accounting course program for master students. Institute of Accounting and Auditing http://www.wiwi.hu-berlin.de/rewe Accounting course program for master students Institute of Accounting and Auditing http://www.wiwi.hu-berlin.de/rewe 2 Accounting requires institutional knowledge... 3...but it pays: Lehman Bros. Inc.,

Mehr

Technical Thermodynamics

Technical Thermodynamics Technical Thermodynamics Chapter 1: Introduction, some nomenclature, table of contents Prof. Dr.-Ing. habil. Egon Hassel University of Rostock, Germany Faculty of Mechanical Engineering and Ship Building

Mehr

An Introduction to Monetary Theory. Rudolf Peto

An Introduction to Monetary Theory. Rudolf Peto An Introduction to Monetary Theory Rudolf Peto 0 Copyright 2013 by Prof. Rudolf Peto, Bielefeld (Germany), www.peto-online.net 1 2 Preface This book is mainly a translation of the theoretical part of my

Mehr

Role Play I: Ms Minor Role Card. Ms Minor, accountant at BIGBOSS Inc.

Role Play I: Ms Minor Role Card. Ms Minor, accountant at BIGBOSS Inc. Role Play I: Ms Minor Role Card Conversation between Ms Boss, CEO of BIGBOSS Inc. and Ms Minor, accountant at BIGBOSS Inc. Ms Boss: Guten Morgen, Frau Minor! Guten Morgen, Herr Boss! Frau Minor, bald steht

Mehr

Robotino View Kommunikation mit OPC. Communication with OPC DE/EN 04/08

Robotino View Kommunikation mit OPC. Communication with OPC DE/EN 04/08 Robotino View Kommunikation mit OPC Robotino View Communication with OPC 1 DE/EN 04/08 Stand/Status: 04/2008 Autor/Author: Markus Bellenberg Festo Didactic GmbH & Co. KG, 73770 Denkendorf, Germany, 2008

Mehr

Messer und Lochscheiben Knives and Plates

Messer und Lochscheiben Knives and Plates Messer und Lochscheiben Knives and Plates Quality is the difference Seit 1920 Since 1920 Quality is the difference Lumbeck & Wolter Qualität, kontinuierlicher Service und stetige Weiterentwicklung zeichnen

Mehr

SiC Processing nimmt Produktionslinien in China in Betrieb

SiC Processing nimmt Produktionslinien in China in Betrieb SiC Processing nimmt Produktionslinien in China in Betrieb Inbetriebnahme von Produktionslinie 4 am Standort Zhenjiang Darlehen von BoC in Höhe von RMB 130 Mio. ausbezahlt Inbetriebnahme von Produktionslinie

Mehr

City Development Plan for Vienna 2005 www.wien.at / stadtentwicklung / step

City Development Plan for Vienna 2005 www.wien.at / stadtentwicklung / step Lebensqualität City Development Plan for Vienna 2005 wwwwienat / stadtentwicklung / step Results of COMET Project which will be part of the new City Development Plan Vienna 2005 Suggestions in the draft-version

Mehr

ISO 15504 Reference Model

ISO 15504 Reference Model Prozess Dimension von SPICE/ISO 15504 Process flow Remarks Role Documents, data, tools input, output Start Define purpose and scope Define process overview Define process details Define roles no Define

Mehr

Load balancing Router with / mit DMZ

Load balancing Router with / mit DMZ ALL7000 Load balancing Router with / mit DMZ Deutsch Seite 3 English Page 10 ALL7000 Quick Installation Guide / Express Setup ALL7000 Quick Installation Guide / Express Setup - 2 - Hardware Beschreibung

Mehr

TomTom WEBFLEET Tachograph

TomTom WEBFLEET Tachograph TomTom WEBFLEET Tachograph Installation TG, 17.06.2013 Terms & Conditions Customers can sign-up for WEBFLEET Tachograph Management using the additional services form. Remote download Price: NAT: 9,90.-/EU:

Mehr

Instruktionen Mozilla Thunderbird Seite 1

Instruktionen Mozilla Thunderbird Seite 1 Instruktionen Mozilla Thunderbird Seite 1 Instruktionen Mozilla Thunderbird Dieses Handbuch wird für Benutzer geschrieben, die bereits ein E-Mail-Konto zusammenbauen lassen im Mozilla Thunderbird und wird

Mehr

Disclaimer & Legal Notice. Haftungsausschluss & Impressum

Disclaimer & Legal Notice. Haftungsausschluss & Impressum Disclaimer & Legal Notice Haftungsausschluss & Impressum 1. Disclaimer Limitation of liability for internal content The content of our website has been compiled with meticulous care and to the best of

Mehr

Ways and methods to secure customer satisfaction at the example of a building subcontractor

Ways and methods to secure customer satisfaction at the example of a building subcontractor Abstract The thesis on hand deals with customer satisfaction at the example of a building subcontractor. Due to the problems in the building branch, it is nowadays necessary to act customer oriented. Customer

Mehr

Veräußerung von Emissionsberechtigungen in Deutschland

Veräußerung von Emissionsberechtigungen in Deutschland Veräußerung von Emissionsberechtigungen in Deutschland Monatsbericht September 2008 Berichtsmonat September 2008 Die KfW hat im Zeitraum vom 1. September 2008 bis zum 30. September 2008 3,95 Mio. EU-Emissionsberechtigungen

Mehr

EEX Kundeninformation 2002-08-30

EEX Kundeninformation 2002-08-30 EEX Kundeninformation 2002-08-30 Terminmarkt - Eurex Release 6.0; Versand der Simulations-Kits Kit-Versand: Am Freitag, 30. August 2002, versendet Eurex nach Handelsschluss die Simulations -Kits für Eurex

Mehr

IBM Security Lab Services für QRadar

IBM Security Lab Services für QRadar IBM Security Lab Services für QRadar Serviceangebote für ein QRadar SIEM Deployment in 10 bzw. 15 Tagen 28.01.2015 12015 IBM Corporation Agenda 1 Inhalt der angebotenen Leistungen Allgemeines Erbrachte

Mehr

Pump Storage Requirements and Comparison with other Technologies

Pump Storage Requirements and Comparison with other Technologies Pump Storage Requirements and Comparison with other Technologies Albert Ruprecht Institute of Fluid Mechanics and Hydraulic Machinery University of Stuttgart 1 Content Introduction Demand on pump storage

Mehr

Klausur Verteilte Systeme

Klausur Verteilte Systeme Klausur Verteilte Systeme SS 2005 by Prof. Walter Kriha Klausur Verteilte Systeme: SS 2005 by Prof. Walter Kriha Note Bitte ausfüllen (Fill in please): Vorname: Nachname: Matrikelnummer: Studiengang: Table

Mehr

Exercise (Part II) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1

Exercise (Part II) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1 Exercise (Part II) Notes: The exercise is based on Microsoft Dynamics CRM Online. For all screenshots: Copyright Microsoft Corporation. The sign ## is you personal number to be used in all exercises. All

Mehr

1. General information... 2 2. Login... 2 3. Home... 3 4. Current applications... 3

1. General information... 2 2. Login... 2 3. Home... 3 4. Current applications... 3 User Manual for Marketing Authorisation and Lifecycle Management of Medicines Inhalt: User Manual for Marketing Authorisation and Lifecycle Management of Medicines... 1 1. General information... 2 2. Login...

Mehr

EEX Customer Information 2009-11-03

EEX Customer Information 2009-11-03 EEX Customer Information 2009-11-03 Introduction of a new procedure for the daily determination of settlement prices Dear Sir or Madam, EEX introduces a new algorithm for the daily determination of settlement

Mehr

HiOPC Hirschmann Netzmanagement. Anforderungsformular für eine Lizenz. Order form for a license

HiOPC Hirschmann Netzmanagement. Anforderungsformular für eine Lizenz. Order form for a license HiOPC Hirschmann Netzmanagement Anforderungsformular für eine Lizenz Order form for a license Anforderungsformular für eine Lizenz Vielen Dank für Ihr Interesse an HiOPC, dem SNMP/OPC Gateway von Hirschmann

Mehr

1.1 Media Gateway - SIP-Sicherheit verbessert

1.1 Media Gateway - SIP-Sicherheit verbessert Deutsch Read Me System Software 7.10.6 PATCH 2 Diese Version unserer Systemsoftware ist für die Gateways der Rxxx2- und der RTxxx2-Serie verfügbar. Beachten Sie, dass ggf. nicht alle hier beschriebenen

Mehr

Socio-economic importance of water in the Alps

Socio-economic importance of water in the Alps Socio-economic importance of water in the Alps Thomas Egger Director of the Swiss center for mountain regions (SAB) Observer at the Alpine Convention for Euromontana Seilerstrasse 4, 3001 Bern Waterbalance

Mehr

Hochschule Esslingen. Modulbeschreibung TBB Internationale Technische Betriebswirtschaft. Inhaltsverzeichnis. Kanalstr. 33 73728 Esslingen

Hochschule Esslingen. Modulbeschreibung TBB Internationale Technische Betriebswirtschaft. Inhaltsverzeichnis. Kanalstr. 33 73728 Esslingen Kanalstr. 33 73728 Esslingen Inhaltsverzeichnis Seite 1 von 6 TBB602 MD International Business 2 Int.Marketing/-Finance & Case Studies Int.Business 3 International Conmmercial Law 5 Erläuterungen 6 Modul

Mehr

Wie bekommt man zusätzliche TOEFL-Zertifikate? Wie kann man weitere Empfänger von TOEFL- Zertifikaten angeben?

Wie bekommt man zusätzliche TOEFL-Zertifikate? Wie kann man weitere Empfänger von TOEFL- Zertifikaten angeben? Wie bekommt man zusätzliche TOEFL-Zertifikate? Wie kann man weitere Empfänger von TOEFL- Zertifikaten angeben? How do I get additional TOEFL certificates? How can I add further recipients for TOEFL certificates?

Mehr

Is forecast accuracy a good KPI for forecasting in retail? ISF 2010 Roland Martin, SAF AG Simulation, Analysis and Forecasting San Diego, June 2010

Is forecast accuracy a good KPI for forecasting in retail? ISF 2010 Roland Martin, SAF AG Simulation, Analysis and Forecasting San Diego, June 2010 Is forecast accuracy a good KPI for forecasting in retail? ISF 2010 Roland Martin, SAF AG Simulation, Analysis and Forecasting San Diego, June 2010 Situation in Retail and Consequences for Forecasters

Mehr

Using TerraSAR-X data for mapping of damages in forests caused by the pine sawfly (Dprion pini) Dr. Klaus MARTIN klaus.martin@slu-web.

Using TerraSAR-X data for mapping of damages in forests caused by the pine sawfly (Dprion pini) Dr. Klaus MARTIN klaus.martin@slu-web. Using TerraSAR-X data for mapping of damages in forests caused by the pine sawfly (Dprion pini) Dr. Klaus MARTIN klaus.martin@slu-web.de Damages caused by Diprion pini Endangered Pine Regions in Germany

Mehr

Bayerisches Landesamt für Statistik und Datenverarbeitung Rechenzentrum Süd. z/os Requirements 95. z/os Guide in Lahnstein 13.

Bayerisches Landesamt für Statistik und Datenverarbeitung Rechenzentrum Süd. z/os Requirements 95. z/os Guide in Lahnstein 13. z/os Requirements 95. z/os Guide in Lahnstein 13. März 2009 0 1) LOGROTATE in z/os USS 2) KERBEROS (KRB5) in DFS/SMB 3) GSE Requirements System 1 Requirement Details Description Benefit Time Limit Impact

Mehr

PCIe, DDR4, VNAND Effizienz beginnt im Server

PCIe, DDR4, VNAND Effizienz beginnt im Server PCIe, DDR4, VNAND Effizienz beginnt im Server Future Thinking 2015 /, Director Marcom + SBD EMEA Legal Disclaimer This presentation is intended to provide information concerning computer and memory industries.

Mehr

The poetry of school.

The poetry of school. International Week 2015 The poetry of school. The pedagogy of transfers and transitions at the Lower Austrian University College of Teacher Education(PH NÖ) Andreas Bieringer In M. Bernard s class, school

Mehr

Challenges in Systems Engineering and a Pragmatic Solution Approach

Challenges in Systems Engineering and a Pragmatic Solution Approach Pure Passion. Systems Engineering and a Pragmatic Solution Approach HELVETING Dr. Thomas Stöckli Director Business Unit Systems Engineering Dr. Daniel Hösli Member of the Executive Board 1 Agenda Different

Mehr

Abteilung Internationales CampusCenter

Abteilung Internationales CampusCenter Abteilung Internationales CampusCenter Instructions for the STiNE Online Enrollment Application for Exchange Students 1. Please go to www.uni-hamburg.de/online-bewerbung and click on Bewerberaccount anlegen

Mehr

A Practical Approach for Reliable Pre-Project Effort Estimation

A Practical Approach for Reliable Pre-Project Effort Estimation A Practical Approach for Reliable Pre-Project Effort Estimation Carl Friedrich Kreß 1, Oliver Hummel 2, Mahmudul Huq 1 1 Cost Xpert AG, Augsburg, Germany {Carl.Friedrich.Kress,Mahmudul.Huq}@CostXpert.de

Mehr

MindestanforderungenanDokumentationvon Lieferanten

MindestanforderungenanDokumentationvon Lieferanten andokumentationvon Lieferanten X.0010 3.02de_en/2014-11-07 Erstellt:J.Wesseloh/EN-M6 Standardvorgabe TK SY Standort Bremen Standard requirements TK SY Location Bremen 07.11.14 DieInformationenindieserUnterlagewurdenmitgrößterSorgfalterarbeitet.DennochkönnenFehlernichtimmervollständig

Mehr

USB Treiber updaten unter Windows 7/Vista

USB Treiber updaten unter Windows 7/Vista USB Treiber updaten unter Windows 7/Vista Hinweis: Für den Downloader ist momentan keine 64 Bit Version erhältlich. Der Downloader ist nur kompatibel mit 32 Bit Versionen von Windows 7/Vista. Für den Einsatz

Mehr

Field Librarianship in den USA

Field Librarianship in den USA Field Librarianship in den USA Bestandsaufnahme und Zukunftsperspektiven Vorschau subject librarians field librarians in den USA embedded librarians das amerikanische Hochschulwesen Zukunftsperspektiven

Mehr

Hymmen IsoPress MFC. Laminate Flooring Melamine Boards. HighTech continuously

Hymmen IsoPress MFC. Laminate Flooring Melamine Boards. HighTech continuously Hymmen IsoPress MFC Laminate Flooring Melamine Boards HighTech continuously Hymmen IsoPress MFC Hymmen ContiFloor - this Double Belt Press produces laminate flooring for the worldwide market leaders, at

Mehr

Application Form ABOUT YOU INFORMATION ABOUT YOUR SCHOOL. - Please affix a photo of yourself here (with your name written on the back) -

Application Form ABOUT YOU INFORMATION ABOUT YOUR SCHOOL. - Please affix a photo of yourself here (with your name written on the back) - Application Form ABOUT YOU First name(s): Surname: Date of birth : Gender : M F Address : Street: Postcode / Town: Telephone number: Email: - Please affix a photo of yourself here (with your name written

Mehr

Inequality Utilitarian and Capabilities Perspectives (and what they may imply for public health)

Inequality Utilitarian and Capabilities Perspectives (and what they may imply for public health) Inequality Utilitarian and Capabilities Perspectives (and what they may imply for public health) 1 Utilitarian Perspectives on Inequality 2 Inequalities matter most in terms of their impact onthelivesthatpeopleseektoliveandthethings,

Mehr

Scrum @FH Biel. Scrum Einführung mit «Electronical Newsletter» FH Biel, 12. Januar 2012. Folie 1 12. Januar 2012. Frank Buchli

Scrum @FH Biel. Scrum Einführung mit «Electronical Newsletter» FH Biel, 12. Januar 2012. Folie 1 12. Januar 2012. Frank Buchli Scrum @FH Biel Scrum Einführung mit «Electronical Newsletter» FH Biel, 12. Januar 2012 Folie 1 12. Januar 2012 Frank Buchli Zu meiner Person Frank Buchli MS in Computer Science, Uni Bern 2003 3 Jahre IT

Mehr

USB-Stick (USB-Stick größer 4G. Es ist eine größere Partition notwendig als die eines 4GB Rohlings, der mit NTFS formatiert wurde)

USB-Stick (USB-Stick größer 4G. Es ist eine größere Partition notwendig als die eines 4GB Rohlings, der mit NTFS formatiert wurde) Colorfly i106 Q1 System-Installations-Tutorial Hinweise vor der Installation / Hit for preparation: 准 备 事 项 : 外 接 键 盘 ( 配 套 的 磁 吸 式 键 盘 USB 键 盘 通 过 OTG 插 发 射 器 的 无 线 键 盘 都 可 ); U 盘 ( 大 于 4G 的 空 白 U 盘,

Mehr

Economics of Climate Adaptation (ECA) Shaping climate resilient development

Economics of Climate Adaptation (ECA) Shaping climate resilient development Economics of Climate Adaptation (ECA) Shaping climate resilient development A framework for decision-making Dr. David N. Bresch, david_bresch@swissre.com, Andreas Spiegel, andreas_spiegel@swissre.com Klimaanpassung

Mehr

Industrieökonomie und Wettbewerb Sommersemester 2006 1.3 (1) Lehrstuhl VWL Arbeit, Personal, Organisation

Industrieökonomie und Wettbewerb Sommersemester 2006 1.3 (1) Lehrstuhl VWL Arbeit, Personal, Organisation 1.3 (1) Übertragung im Lichte der Spieltheorie: 1.3 (2) simultane Entscheidung 2er unabhängiger Anbieter bei gegebener payoff-matrix; Beispiel: 2 Anbieter mit je zwei Alternativen, Produktion von 6 bzw.

Mehr

VPPR Stab Sicherheit, Gesundheit und Umwelt Safety, Security, Health and Environment. Laser which rules apply in Switzerland?

VPPR Stab Sicherheit, Gesundheit und Umwelt Safety, Security, Health and Environment. Laser which rules apply in Switzerland? Laser which rules apply in Switzerland? ETH Zürich KT/07.07.2008 When in danger say STOP! VPPR Laser classes Class 1 Eye safe < 0.39 mw Class 1M Eye safe without optical instruments 400 700 nm < 0.39 mw

Mehr

Einkommensaufbau mit FFI:

Einkommensaufbau mit FFI: For English Explanation, go to page 4. Einkommensaufbau mit FFI: 1) Binäre Cycle: Eine Position ist wie ein Business-Center. Ihr Business-Center hat zwei Teams. Jedes mal, wenn eines der Teams 300 Punkte

Mehr

Employment and Salary Verification in the Internet (PA-PA-US)

Employment and Salary Verification in the Internet (PA-PA-US) Employment and Salary Verification in the Internet (PA-PA-US) HELP.PYUS Release 4.6C Employment and Salary Verification in the Internet (PA-PA-US SAP AG Copyright Copyright 2001 SAP AG. Alle Rechte vorbehalten.

Mehr

fastpim 1 H fast switching H bridge module Features: - 1 Phase Input Rectifier Bridge - 1 Phase fast switching IGBT + FRED full H bridge - NTC

fastpim 1 H fast switching H bridge module Features: - 1 Phase Input Rectifier Bridge - 1 Phase fast switching IGBT + FRED full H bridge - NTC fast switching H bridge module Features: - 1 Phase Input Rectifier Bridge - 1 Phase fast switching IGBT + FRED full H bridge - NTC Copyright by Vincotech 1 Revision: 1 module types / Produkttypen Part-Number

Mehr

«Zukunft Bildung Schweiz»

«Zukunft Bildung Schweiz» «Zukunft Bildung Schweiz» Von der Selektion zur Integration Welche Art von Schule wirkt sich positiv auf eine «gute» zukünftige Gesellschaft aus? Eine Schwedische Perspektive. Bern 16-17.06.2011 Referent:

Mehr

Power-Efficient Server Utilization in Compute Clouds

Power-Efficient Server Utilization in Compute Clouds Power-Efficient Server Utilization in Compute Clouds 1/14 Overview 1. Motivation 2. SPECpower benchmark 3. Load distribution strategies 4. Cloud configuration 5. Results 6. Conclusion 2/14 1. Motivation

Mehr

Cooperation Project Sao Paulo - Bavaria. Licensing of Waste to Energy Plants (WEP/URE)

Cooperation Project Sao Paulo - Bavaria. Licensing of Waste to Energy Plants (WEP/URE) Cooperation Project Sao Paulo - Bavaria Licensing of Waste to Energy Plants (WEP/URE) SMA 15.10.2007 W. Scholz Legal framework Bayerisches Staatsministerium für European Directive on Waste incineration

Mehr

SmartClass Firmware-Update Vorgehensweise

SmartClass Firmware-Update Vorgehensweise Benutzeranweisungen SmartClass Firmware-Update Vorgehensweise 2008.01 (V 1.x.x) Deutsch Please direct all enquiries to your local JDSU sales company. The addresses can be found at: www.jdsu.com/tm-contacts

Mehr

Vorgehensweise zur Auswahl eines ERP-Systems

Vorgehensweise zur Auswahl eines ERP-Systems Vorgehensweise zur Auswahl eines ERP-Systems Inhalt Was ist ein ERP-System? Recherche ERP-Systemanbieter Erstellung Kriterienkatalog For Example: Criteria required for ERP system Durchführung der ersten

Mehr

Containerschiffahrt Prognosen + Entwicklung Heilbronn, 13. Juli 2010. von Thorsten Kröger NYK Line (Deutschland) GmbH, Hamburg

Containerschiffahrt Prognosen + Entwicklung Heilbronn, 13. Juli 2010. von Thorsten Kröger NYK Line (Deutschland) GmbH, Hamburg Heilbronn, 13. Juli 2010 von Thorsten Kröger NYK Line (Deutschland) GmbH, Hamburg Agenda Das Krisenjahr 2009 in der Containerschiffahrt Die Konsolidierung sowie Neuausrichtung (2010) Slow Steaming Capacity

Mehr

Cleanroom Fog Generators Volcano VP 12 + VP 18

Cleanroom Fog Generators Volcano VP 12 + VP 18 Cleanroom Fog Generators Volcano VP 12 + VP 18 Description & Functional Principle (Piezo Technology) Cleanrooms are dynamic systems. People and goods are constantly in motion. Further installations, production

Mehr

FOR ENGLISCH VERSION PLEASE SCROLL FORWARD SOME PAGES. THANK YOU!

FOR ENGLISCH VERSION PLEASE SCROLL FORWARD SOME PAGES. THANK YOU! FOR ENGLISCH VERSION PLEASE SCROLL FORWARD SOME PAGES. THANK YOU! HELPLINE GAMMA-SCOUT ODER : WIE BEKOMME ICH MEIN GERÄT ZUM LAUFEN? Sie haben sich für ein Strahlungsmessgerät mit PC-Anschluss entschieden.

Mehr

HARTNAGEL Etikettiermaschinen für Verpackungsbecher und Automation. Etikettierautomat - EMR 8-200 / EMR 8-400

HARTNAGEL Etikettiermaschinen für Verpackungsbecher und Automation. Etikettierautomat - EMR 8-200 / EMR 8-400 Etikettierautomat - EMR 8-200 / EMR 8-400 Die Firma Hartnagel, begann vor über 15 Jahren den ersten Etikettierautomaten zu entwickeln und zu bauen. Geleitet von der Idee, das hinsichtlich der Produktführung

Mehr

Vattenfall Europe Power Management. June 2015

Vattenfall Europe Power Management. June 2015 Vattenfall Europe Power Management June 2015 1 Vattenfall Europe Power Management June 2015 Vattenfall Europe Power Management GmbH Facts & Figures Traded volumes: ~ 370 TWh Strom ~ 26 TWh Gas ~ 2200 kt

Mehr

EEX Kundeninformation 2002-09-11

EEX Kundeninformation 2002-09-11 EEX Kundeninformation 2002-09-11 Terminmarkt Bereitstellung eines Simulations-Hotfixes für Eurex Release 6.0 Aufgrund eines Fehlers in den Release 6.0 Simulations-Kits lässt sich die neue Broadcast-Split-

Mehr

PART 3: MODELLING BUSINESS PROCESSES EVENT-DRIVEN PROCESS CHAINS (EPC)

PART 3: MODELLING BUSINESS PROCESSES EVENT-DRIVEN PROCESS CHAINS (EPC) Information Management II / ERP: Microsoft Dynamics NAV 2009 Page 1 of 5 PART 3: MODELLING BUSINESS PROCESSES EVENT-DRIVEN PROCESS CHAINS (EPC) Event-driven Process Chains are, in simple terms, some kind

Mehr

Fluid-Particle Multiphase Flow Simulations for the Study of Sand Infiltration into Immobile Gravel-Beds

Fluid-Particle Multiphase Flow Simulations for the Study of Sand Infiltration into Immobile Gravel-Beds 3rd JUQUEEN Porting and Tuning Workshop Jülich, 2-4 February 2015 Fluid-Particle Multiphase Flow Simulations for the Study of Sand Infiltration into Immobile Gravel-Beds Tobias Schruff, Roy M. Frings,

Mehr

Künstliche Intelligenz

Künstliche Intelligenz Künstliche Intelligenz Data Mining Approaches for Instrusion Detection Espen Jervidalo WS05/06 KI - WS05/06 - Espen Jervidalo 1 Overview Motivation Ziel IDS (Intrusion Detection System) HIDS NIDS Data

Mehr

Anleitung zur Schnellinstallation TFM-560X YO.13

Anleitung zur Schnellinstallation TFM-560X YO.13 Anleitung zur Schnellinstallation TFM-560X YO.13 Table of Contents Deutsch 1 1. Bevor Sie anfangen 1 2. Installation 2 Troubleshooting 6 Version 06.08.2011 1. Bevor Sie anfangen Packungsinhalt ŸTFM-560X

Mehr

Supplier Status Report (SSR)

Supplier Status Report (SSR) Supplier Status Report (SSR) Introduction for BOS suppliers BOS GmbH & Co. KG International Headquarters Stuttgart Ernst-Heinkel-Str. 2 D-73760 Ostfildern Management Letter 2 Supplier Status Report sheet

Mehr

Aufnahmeuntersuchung für Koi

Aufnahmeuntersuchung für Koi Aufnahmeuntersuchung für Koi Datum des Untersuchs: Date of examination: 1. Angaben zur Praxis / Tierarzt Vet details Name des Tierarztes Name of Vet Name der Praxis Name of practice Adresse Address Beruf

Mehr

Schaltgeräte und Elektronik Industrie und Gebäudeautomation. Switchgears and electronic Industry and building automation

Schaltgeräte und Elektronik Industrie und Gebäudeautomation. Switchgears and electronic Industry and building automation 2009 Schaltgeräte und Elektronik Industrie und Gebäudeautomation Switchgears and electronic Industry and building automation Inhalt Contents Seite Page I Wir über uns About us I A SASILplus SASILplus

Mehr

History and Future at the Dresden Elbe Gauge. Data Mining and Results from the viewpoint of a hydraulic engineer.

History and Future at the Dresden Elbe Gauge. Data Mining and Results from the viewpoint of a hydraulic engineer. Institut für asserbau und Technische Hydromechanik Reinhard Pohl: Dresden Elbe Gauge.History HydroPredict, Praha 2010 History and Future at the Dresden Elbe Gauge. Data Mining and Results from the viewpoint

Mehr

CUSTOMER INFORMATION 2014-08-21

CUSTOMER INFORMATION 2014-08-21 CUSTOMER INFORMATION 2014-08-21 Introduction of Inter-Product-Spreads as part of the T7 Release 2.5 Dear Trading Participants, With this customer information EEX Power Derivatives would like to inform

Mehr

Energieeffizienz im internationalen Vergleich

Energieeffizienz im internationalen Vergleich Energieeffizienz im internationalen Vergleich Miranda A. Schreurs Sachverständigenrat für Umweltfragen (SRU) Forschungszentrum für Umweltpolitik (FFU), Freie Universität Berlin Carbon Dioxide Emissions

Mehr

FAQ - Häufig gestellte Fragen zur PC Software iks AQUASSOFT FAQ Frequently asked questions regarding the software iks AQUASSOFT

FAQ - Häufig gestellte Fragen zur PC Software iks AQUASSOFT FAQ Frequently asked questions regarding the software iks AQUASSOFT FAQ - Häufig gestellte Fragen zur PC Software iks AQUASSOFT FAQ Frequently asked questions regarding the software iks AQUASSOFT Mit welchen Versionen des iks Computers funktioniert AQUASSOFT? An Hand der

Mehr

Addressing the Location in Spontaneous Networks

Addressing the Location in Spontaneous Networks Addressing the Location in Spontaneous Networks Enabling BOTH: Privacy and E-Commerce Design by Moritz Strasser 1 Disappearing computers Trends Mobility and Spontaneous Networks (MANET = Mobile Ad hoc

Mehr

Zugangsvoraussetzungen für Airworthiness Review Staff gem. Part-M.A.707

Zugangsvoraussetzungen für Airworthiness Review Staff gem. Part-M.A.707 1) Zusammenfassung der relevanten Part-M Paragraphen und AMC M.A.707 Airworthiness review staff (a) To be approved to carry out reviews, an approved continuing management organisation shall have appropriate

Mehr

Software development with continuous integration

Software development with continuous integration Software development with continuous integration (FESG/MPIfR) ettl@fs.wettzell.de (FESG) neidhardt@fs.wettzell.de 1 A critical view on scientific software Tendency to become complex and unstructured Highly

Mehr

H. Enke, Sprecher des AK Forschungsdaten der WGL

H. Enke, Sprecher des AK Forschungsdaten der WGL https://escience.aip.de/ak-forschungsdaten H. Enke, Sprecher des AK Forschungsdaten der WGL 20.01.2015 / Forschungsdaten - DataCite Workshop 1 AK Forschungsdaten der WGL 2009 gegründet - Arbeit für die

Mehr