Stadtwerke Münster Energie und Mobilität Operation of electric buses with small batteries in Münster Eckhard Schläfke Folien-Nr. 1 11. September 2015
Stadtwerke Münster = energy and mobility Folien-Nr. 2 Eckhard Schläfke
Münster Electric Bus Project Project SEB E-ÖPNV ( 1 bus) 500 kw Charging, 4-6 Minutes 85,6 kwh Li-Ionen battery (3 x 621,6V / 46 AH) VDL Citea-Electric length: 12,00 mtr (full capacity, 80 passengers, 43 seats) height: 3,02 (no problems with bridges or garages) Project ZeEUS (Integration of a bus line, 4 buses ) ( new: 4 x 62,6 Li-Titanat battery) Ziehl-Abbegg Achse Folien-Nr. 3 Name Name
Opportunity Charging versus Overnight Charging avoide high prices take advantage of low prices Folien-Nr. 4 Eckhard Schläfke
Power Prices (stock prices) Folien-Nr. 5 Name Name
Ultra Fast Charging Station Depot Münster Power Transformer Bus Shelter + = Add a connector on the bus shelter and install a plug-in connector on the bus roof = Charging Type Münster : A smart and cheap way to charge a bus we are on You Tube Elektrobus Münster Folien-Nr. 6 Name Name
Solar power system and storage battery at the depot Folien-Nr. 7 Eckhard Schläfke
Nachladung/Opportunity Charging Charging along the busline, high costs, sophisticated city planning, less flexibility Charging only at the terminus stations, by using existing bus shelters less participation in decision-making, high flexibilty inductive or pantograph Conductive, automatically plug-in High charging rates are unavoidable to reduce turnroundtimes 22.10.2014 Sinhuber, Rogge, Rohlfs, Klawikowski 8
The big question: Turnround times versus Infrastructure cost 3-5 Minutes 8-15 Minutes Driver tasks - Cleaning bus/station -Feedbacks office/garage (complaints, accidents, shifts etc) -E-training/E-instructions diesel Cost-Effective, but problems in cases of delays > low reliability, dissatisfies customers and drivers electric Optimized for fast charging, possibilities for extra heating (winter) and extra air conditioning (summer) to reduce energy consumption from the battery, conductive charging up to 500 kw within 4-6 Minutes for 30-40 km possible, no charging along the bus line > more flexibility for the daily operation The lesson is clear: expended turnroundtimes lead to cheaper infrastructure costs and cheaper buses due to the smaller battery Folien-Nr. 9 Name Name
Liniennetzplan und Auslastung der Linien bus lines and passenger load Sprakel Gelmer Kinderhaus Nienberge Coerde Sudmühle Zentrum Nord Mariendorf Handorf Gievenbeck Albachten Roxel Mecklenbeck Zoo Aaseestadt Hiltrup- West Loddenheide Krögerweg Hiltrup Mauritz Gremmendorf Waldsiedlung Vergleichende Bewertung: Korridore, Linienabschnitte Line Fahrten und Fahrgäste 14 (Tagesnetz, (12 werktags) km) schlechte, 5-610 - buses, Takt 2 mittlere, oder besser gute Auslastung charger at terminus 20 - Takt station, oder schlechter Angelmodde schlechte, mittlere, gute Auslastung including a stationary storage battery 100 kw/h Wolbeck high capacity/load medium capacity/load low capacity/load Version Münster: Decentral charging stations, using existig bus shelters and a existing power grid, low investment costs due to the decentralisized facilities Hansa- Business-Park Hiltrup- Ost Amelsbüren Folien-Nr. 10 Eckhard Schläfke
Data Logging click hier for live-datalogging Folien-Nr. 11 Name Name
Thank you for your attention, any questions? Contact: Stadtwerke Münster Rösnerstraße 13 48155 Münster e.schlaefke@stadtwerke-muenster.de Betriebsleiter Verkehrsbetrieb Operating manager public transport Stadtwerke Münster Fast Charging Station Münster