1 Wind Energy Use in Germany - Status Windenergienutzung in Deutschland - Stand C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch The first six months of 214 were characterized by discussions about the new German Renewable Energy Sources Act (EEG 214), which meanwhile has been passed by parliament and came into force on 1. August 214 (see also page 51). It is therefore not surprising that developers have rushed to finish as many projects as possible before the new feed-in tariffs came into force. Installation figures (numbers of wind turbines) since February were clearly above the average of the years 25 to 213, in June for example 185 wind turbines were installed, which is 1 more than the average. There has also been some development in the offshore area (for details see the article on page 45). During the second half of the year more offshore wind turbines and grid connections are expected to be completed. When considering only new installations onshore (incl. repowering) these were 73 per cent higher in the first half of 214 than in the same period last year, with a total capacity of approx. 1,732. According to the information supplied by wind turbine manufacturers 1, 778 wind turbines with a capacity of 2,275 were erected in Germany Das erste Halbjahr 214 zeigte sich geprägt durch die Diskussionen um das neue EEG, welches nun beschlossen und ab 1. August 214 gültig ist (sh. Seite 51). Dementsprechend ist es auch nicht verwunderlich, dass noch möglichst viele Projekte vor dem Inkrafttreten der neuen Einspeisevergütung errichtet wurden. So lagen die Errichtungszahlen (Anzahl) seit Februar deutlich über dem Durchschnitt der Jahre 25 bis 213, z.b. wurden im Juni 185 Anlagen errichtet, 1 mehr als im Durchschnitt. Im Bereich hat sich auch einiges getan, aber nur 18 wurden ans Netz angeschlossen (Details siehe Artikel auf Seite 45). Im zweiten Halbjahr ist die Errichtung sowie der Netzanschluss weiterer -WEA zu erwarten. Was die reinen Onshore-Neuaufstellungen (inkl. ) betrifft, so lagen diese im ersten Halbjahr 214 um 73 Prozent höher als im Vorjahreszeitraum und betrugen rund Nach Angaben der Hersteller 1 von Windenergieanlagen (WEA) wurden im Betrachtungszeitraum 778 Anlagen mit in Deutschland neu errichtet. Der Anteil des an den Onshore-Neuaufstellungen liegt bei rund 12 %, In einigen Bundesländern liegt dieser 1 The data are based exclusively on manufacturer information. The survey was carried out in June/July 214. The WTGS reported were installed but do not have to be already connected to the grid. Die Daten basieren ausschließlich auf Herstellerangaben. Die Erhebung wurde im Juni/Juli 214 durchgeführt. Die gemeldeten WEA sind errichtet, müssen aber noch nicht ans Netz angeschlossen sein. DEWI MAGAZIN NO. 45, AUGUST

2 Removed (WTGS from 213) Not grid connected 543 WTGS in operation/ WEA in Betrieb in 214 (3.6.14) Removed 71 WTGS installed/ Errichtete WEA in 214 ( ) Onshore Onshore Fig. 1: Abb. 1: Status of wind energy use in Germany Stand der Wind ener gie nut zung in Deut schland not yet grid connected / WEA noch nicht am Netz angeschlossen installations with grid connection / -Installationen mit Netzanschluss Capacity per Year, erte Leistung/Jahr, Installed Installie Onshore (Installation) / Onshore (Errichtungen) Accumulated installed capacity / Kumulierte installierte Leistung d Installed Capacity, e install. Leistung, Accumulated Kumulierte Fig. 2: Abb. 2: Development of the yearly and accumulated in stalled power. Entwicklung der jährlichen und kumulierten in stallier ten Leistung Status WTGS installed in 214 In 214 errichtete WEA WTGS pulled down in 214 In 214 abgebaute WEA in 214 Federal State Bundesland Number of WTGS Anzahl der WEA Installed Capacity Installierte Leistung Average Installed Power per WTGS installierte WEA- Durchschnittsleistung Number of WTGS Anzahl der WEA Pulled Down Capacity Abgebaute Leistung kw Schleswig-Holstein ,9 2.8, , ,95 Niedersachsen , ,1 17 9, ,63 Brandenburg , ,2 2 11, ,6 Mecklenburg-Vorpommern , ,5 5 2,55 3 6,95 Rheinland-Pfalz , ,9 11 9,4 7 21,35 Bayern 51 14, ,9 1,6, Sachsen-Anhalt , 2.595,7 1,6 1 2, Nordrhein-Westfalen 45 19, ,7 8 2,46 3 9,1 Hessen 33 88, ,2 14 7,9 6 16,5 Thüringen 34 73, ,3 1,2 1 3,5 Saarland 8 21, ,,, Bremen 2 5,7 2.85,,, Baden-Württemberg 1 3,5 3.5,,, Hamburg 1 2, 2., 1,3 1 2, Sachsen,, 1,5, Berlin,,,, Nordsee ,7 4.37,1,, Ostsee,,,, Total / Gesamt , , , ,68 Tab. 1: Regional distribution of WTGS newly erected, pulled down and repowered in 214 Tab. 1: Regionale Verteilung der im Jahr 214 in Deutschland neu errichteten, abgebauten und repowerten WEA Number of WTGS Anzahl der WEA Installed Capacity Installierte Leistung 38 DEWI MAGAZIN NO. 45, AUGUST 214

3 Niedersachsen Brandenburg Schleswig-Holstein Sachsen-Anhalt Nordrhein-Westfalen Mecklenburg-Vorpommern 2.53 Rheinland-Pfalz Bayern Thüringen 1.76 Hessen Sachsen Baden-Württemberg Saarland Bremen Hamburg Berlin Nordsee Ostsee OFFSHORE (without nearshore) Inst. capacity until Inst. Leistung bis New installation in 214 Neuinstallation in 214 Cumulative data (as of ) Kumulierte Daten (Stand ) Fig. 3: Abb. 3: Regional distribution of wind energy utilisation in Germany. Regionale Verteilung der Wind ener gie nut zung in Deutschland. 75,, d Capacity, M ute Leistung, d & removed e & abgebau Installed Installierte 5, 25,, -25, -5, -75, New installed capacity () / Neu installierte Leistung () Capacity () removed / Abgebaute Leistung, Net capacity increment through repowering / Netto Leistungszuwachs durch Hamburg Niedersachsen Brandenburg Hessen Rheinland-Pfalz Schleswig-Holstein Nordrhein-Westfalen Thüringen 22,7% 22,% 18,2% 13,% 12,9% 8,3% 4,2% 1,% Mecklenburg- 4,1% Sachsen-Anhalt 1,6% Share of repowering in the new installed capacity Anteil des s an der neu installierten Leistung Fig. 4: Abb. 4: Net capacity increment in the federal states caused by repowering in 214 Netto Leistungszuwachs in den einzelnen Bundesländern aufgrund des in 214 Fig. 5: Abb. 5: Share of the installed capacity from repowering in the total new capacity in 214 Anteil der installierten Leistung aus an der neu installierten Leistung in nstalled Capacity per Year, Installierte Leistung/Jahr, In Taking down within a repowering project Abbauten im Rahmen eines s Errections within a repowering project Errichtungen im Rahmen eines s Fig. 6: Abb. 6: -3 Development of installations in within repowering projects Entwicklung der Errichtungen in im Rahmen von -Projekten DEWI MAGAZIN NO. 45, AUGUST

4 Fig. 7: Abb. 7: Shares of the potential annual energy yield in the net electrical energy consumption for the Federal States Anteil des potenziellen Jah res ener gie er trags aus WEA am Net to strom verbrauch der Bundes län der in the % energy yield umption, in ergieertrags uch, in % tial annual e energy consu ot. Jahresene stromverbra of the potent t electrical e Share o net Anteil des po am Nettos , 59 9,5 53,3 53,3 27,2 Share in the net electrical energy consumption Anteil am Nettostromverbrauch 15,9 13,5 8,4 5,4 4,4 4,4 3,4 3 2,5 2 1, 8,8, 12,8 Fig. 8: Abb. 8: Shares of different unit sizes in the annually in stalled power Anteile unterschiedlicher Anlagen größen klassen an der jährlich neu installierten Leistung % 1% 2% 3% 4% 5% 6% 7% 8% 9% 1% Share on the Yearly New Installed Capacity, % Anteil an der jährlich neu installierten Leistung in % Group of Rotor Diameters Rotordurchmessergruppen - 16 m 16,1-22 m 22,1-32 m 32,1-48m 48,1-6 m 6,1-9m > 9,1 m > 9,1 m Bei der Betrachtung der Neuerrichtungen je Bundesland fällt auf, dass Schleswig-Holstein mit 451 deutlich vor Niedersachsen (192 ) liegt (Tab. 1). Es folgen Bran denburg (189 ), Mecklenburg-Vorpommern (17 ) und Rheinland-Pfalz (164 ). Kumulativ gesehen führt weiterhin Niedersachsen mit 7.847, gefolgt von Bran denduring the period under consideration. The share of repowering in the new installations onshore is 12 %. In some federal states this share is even higher, and more projects have been announced for the second half of the year or are already under construction. In addition there is the capacity installed by utilizing repowering bonus certificates. A compact overview of the results of the first half of 214 is given in Fig. 1, which shows, among others, the new installations, repowering and offshore figures. Fig. 2 shows the development of wind energy in Germany during the last few years and also includes the cumulative values in addition to the new installations added each year, as well as the offshore capacity of wind turbines installed but not yet connected to the grid. Altogether, as per , a total of 24,531 wind turbines with a capacity of 36,861 have been installed in Germany. Regional Distribution of Wind Energy Use When taking a look at the new installations in the individual federal states, it is interesting to note that Schleswig- Holstein with 451 is clearly ahead of Lower Saxony deutlich höher und weitere Projekte sind für die zweite Jahreshälfte angekündigt bzw. bereits im Bau. Hinzu kommt noch die Nutzung der -Bonus-Zertifikate. Eine kompakte Übersicht über das Ergebnis des ersten Halbjahres 213 gibt die Abb. 1, wo u.a. die Neuinstallationen, das und der Bereich dargestellt sind. Die Abb. 2 zeigt den Ausbau der Windenergie in Deutschland in den letzten Jahren und enthält neben den jährlichen Errichtungen auch die kumulierten Werte sowie die im betrachteten Jahr noch nicht ans Netz angeschlossene leistung. In der Summe sind zum Stichtag insgesamt WEA mit einer Leistung von deutschlandweit errichtet. Regionale Verteilung der Windenergienutzung 4 DEWI MAGAZIN NO. 45, AUGUST 214

5 (192 ) (Tab. 1). These states are followed by Brandenburg (189 ), Mecklenburg-Western Pomerania (17 ) and Rhineland-Palatinate (164 ). When looking at the cumulative figures, the lead position is still kept by Lower Saxony with 7.847, followed by Bran denburg (5.266 ) and Schleswig-Holstein (4.298 ). These and other cumulative figures can be found in Fig. 3, where the accumulated installed capacity as per is shown in blue and the new installations as per are marked orange. The figures given refer to the total installed capacity at the reference date. Wind energy statistics broken down by administrative districts and a map of approximate sites of new installations will be published in the next DEWI Magazin as part of the annual analysis. In the first half of 214, 71 wind turbines with a total of 24 were installed within the scope of repowering projects (see Tab. 1, preliminary figures, status July 214). In these projects, 123 Anlagen (74 ) were pulled down, mostly old turbines in the range of up to 6 kw rated capacity, but wind turbines of the 1.5 class were also replaced. The old turbines were replaced mainly by wind turbines of the 3 class. projects were carried out not only in Lower Saxony and Schleswig-Holstein, but also in Hamburg, Brandenburg, Hesse, Rhinelandburg (5.266 ) und Schleswig-Holstein (4.298 ). Weitere Gesamtzahlen sind in Abb. 3 zu finden, wo zum einen grafisch die Gesamtleistung zum (blau) und zum anderen die Neuerrichtungen zum (orange) dargestellt sind. Die Zahlenan gaben beziehen sich auf die gesamte installierte Leistung zum Stichtag. Die Auswertung nach Landkreisen sowie die Karte mit den ungefähren Standorten werden wieder im nächsten DEWI Magazin im Rahmen der Jahresauswertung erscheinen. Im ersten Halbjahr 214 wurden insgesamt 71 WEA mit 24 im Rahmen eines errichtet (sh. Tab. 1, vorläufige Zahlen Stand Juli 214). Hierfür wurden 123 Anlagen (74 ) abgebaut. Hauptsächlich waren dies Altanlagen im Leistungsbereich bis 6 kw, aber es wurden auch WEA der 1,5-Klasse abgebaut. Ersetzt wurden die alten WEA hauptsächlich durch Anlagen der 3-Klasse. Neben Niedersachsen und Schleswig-Holstein wurden auch in Hamburg, Brandenburg, Hessen, Rheinland-Pfalz, Nordrhein-Westfalen, Thüringen, Mecklenburg-Vorpommern und Sachsen-Anhalt -Projekte umgesetzt (Abb. 4 und 5). Zum einen handelt es sich um die Erneuerung von Windparks und zum anderen um den Austausch von einzelnen WEA. Neben den reinen Neuerrichtungen im Rahmen des DEWI MAGAZIN NO. 45, AUGUST

6 > 12 m 1,8% 6-79 m 1,7% 8-89 m 14,5% 9-99 m 5,1% m 56,3% Fig. 9: Abb. 9: 3. Average installed power per Unit, kw/unit Durchschnittlicche installierte Leistung pro Anlage, kw/wea < 6 m 2,6% Shares of different rotor diameters in the annually new in stalled WT Anteile unterschiedlicher Rotordurchmesser an den jährlich neu installierten WEA Fig. 1: Development of the average installed power per unit Abb. 1: Entwicklung der durchschnittlich installierten Leistung pro WEA >3.5,9% <2 3,% only/nur Onshore 2.8 <2 3,5% >3.5 17,% ,1% Installation in Wind turbines / WEA ,%, Onshore O h I Installation ll i in ,9% 652 Wind turbines / WEA Off h I t ll ti Installation in 214 > 5 49,2% 126 Wind turbines / WEA Ø 2.66 Ø % 5,8% Ø ,2% ,8% ,7% Fig. 11: Share of individual WTGS size classes (rated capacity) in the newly installed WTGS (from the left: total, onshore, offshore) Abb. 11: Anteil der einzelnen WEA-Größen (Nennleistung) an den neu installierten WEA (von links: Gesamt, Onshore, ) Deutschland 14,1% Bayern <= 6 m 1,1% 1,% 6,5% 59,7% 33,8% Bremen 61-8 m 14,7% 5,% 5,% Hamburg Hessen 1,% 3,%3,% Mecklenburg-Vorpommern 93,9% Nordrhein-Westfalen 81-1 m 23 % 23,% Rheinland-Pfalz 79,% 21,% Niedersachsen m 47,8% 86,3% Baden-Württemberg Brandenburg 51,9% 33,9% 13,7% 19,4% 6,7% 57,8% 35,6% 1,7% S l d Saarland 22,2% 58,3% 98,3% 12 5% 12,5% 87 5% 87,5% Sachsen Sachsen-Anhalt m 13,4% 42,6% Schleswig-Holstein Thüringen <= 1 m m > 151 m 57,4% 38,1% 2,6% % 2,6% 53,8% 8,1% 58,8% 2% 4% 6% 8% Share of the different total heights in the yearly installed WTGS Anteil der einzelnen WEA-Gesamthöhen an den jährlich errichteten Anlagen 1% Fig. 13: Share of the different hub height classes in the WTGS erected in Germany (left) and the overall heights (incl. rotor blade) of all WTGS erected in Germany and in the federal states (right), both for 214 (only onshore) Abb. 13: Anteil der einzelnen Nabenhöhenklassen an den in Deutschland errichteten WEA (links) und der Gesamthöhen (einschl. Rotorblatt) aller errichteten WEA in Deutschland sowie in den Bundesländern (rechts), Angaben jeweils für das Jahr 214 (nur onshore) 42 DEWI MAGAZIN NO. 45, AUGUST 214

7 Palatinate, North Rhine-Westphalia, Thuringia, Mecklenburg-Western Pomerania and Saxony-Anhalt (Fig. 4 and 5). These projects partly concerned complete wind farms, partly single wind turbines. Apart from the new capacity installed within the scope of repowering it is also interesting to know how much net growth in capacity has been achieved by these projects. This information is given in Fig. 4, where the capacity removed (red) was deducted from the new installations (dark blue). The largest growth in capacity (light blue) in the first half of 214 was registered in Lower Saxony, followed by Brandenburg. has gained in importance and in the first half of this year it has already assumed a significant share in the new installations in several federal states (Fig. 5). Finally it should be mentioned that because of the repowering regulations under the EEG (the German Renewable Energy Sources Act) in force since 212 until July 214, old wind turbines practically were replaced in a relation 1:1 as far as the number of plants is concerned, which means that each old wind turbine can be replaced by a new one. For the repowering statistics this could mean in some cases that replacing wind turbines at one site could actually result in two different repowering projects, as shown by the following example: If in a wind farm the ten existing wind turbines can only be replaced by six bigger modern turbines (because of spacing and other regulations), the repowering bonus for the remaining four wind turbines can be transferred to another wind farm at a site previously not used - provided that these are located in the same or a neighboring administrative district. Under the EEG this means two repowering projects, at the previously used site as well as at the site of the new wind farm. This makes the already difficult collection of data and assessment of repowering even more complicated. An up-to-date overview of the status of offshore wind energy is given in the article on page 45, which is why details of projects planned and under construction are not discussed here. s ist vor allem interessant, welchen Netto-Leistungszuwachs dieses gebracht hat. Eine solche Betrachtung ist in Abb. 4 zu finden, wo von den Neuaufstellungen (dunkelblau) der Abbau (rot) abgezogen wurde. Der größte Leistungszuwachs (hellblau) war im ersten Halbjahr 214 in Niedersachsen gefolgt von Brandenburg. hat an Bedeutung gewonnen und macht im ersten Halbjahr in mehreren Bundesländern (Abb. 5) bereits einen gewissen Anteil an den Neuaufstellungen aus. Es ist schließlich darauf hinzuweisen, dass durch die seit 212 bis Juli 214 geltende Regelung des im EEG in Bezug auf die Anlagenanzahl praktisch generell ein 1:1-Ersatz alter WEA erfolgt, sodass jede einzelne alte WEA durch eine neue Anlage ersetzt werden kann. Für die -Statistik kann dies im Einzelfall zu der Situation führen, dass aus dem Austausch der WEA an einem Standort letztlich zwei -Projekte entstehen, wie das folgende Beispiel zeigt: Können an dem bestehenden Standort statt bisher zehn Anlagen nur noch sechs moderne WEA betrieben werden, so lässt sich der -Bonus für vier weitere WEA auf einen Windpark an einem bisher noch nicht genutzten Standort übertragen vorausgesetzt, dieser liegt im selben oder im angrenzenden Landkreis. Im Sinne des EEG ergeben sich damit zwei -Projekte, sowohl am bisher bereits genutzten Standort als auch am Standort des neuen Windparks. Die ohnehin schon schwierige Erfassung und Bilanzierung des wird damit nochmals zusätzlich erschwert. anemometer first class advanced World wide the only class.5 Anemometer accredited according IEC (25-12), ISO , Measnet Potential Annual Energy Yield It sometimes takes quite a while until real production data are available, and in order to get an idea about of the share of wind energy in the energy actually generated, the potential annual energy yield is estimated, assuming a 1% wind year. This is based on the average load factors calculated for wind turbines of different power classes for each federal state, using the current wind index IWET V11 [2] (average of the load factors of the years 23 to 212). The calculation furthermore is based on the assumption that all wind turbines reported by the end of the year contribute a full annual energy yield, i.e. downtimes due to maintenance, repair, grid overload etc. are not taken into account. The potential share of wind energy in the net energy consumption is shown in Fig. 7 where the shares of the calculated potential annual energy yield are represented. high quality anemometer class.5 Class A,B and S accredited acc. IEC for site assessment and power performance of WTG. Optimised dynamic behaviour minimum over speeding high accuracy excellent linearity r >,99999 high survival speed low power excellent price performance ratio patented design adolf ThIeS GMBh & Co. KG Hauptstraße 76 D-3783 Göttingen (Germany) Telefon Fax info@thiesclima.com The World of W eat her d a T a DEWI MAGAZIN NO. 45, AUGUST

8 Market Trends in Turbine Size From year to year more wind turbines with rotor diameters of more than 9 m are installed in Germany (Fig. 8), and in the first half of 214 the share of this class has reached approx. 78 %. It is therefore not surprising that the average installed power onshore has gone up to 2,656 kw (Fig. 1). The reason is, among others, the increasing installation of wind turbines in the range of over 3, which onshore has reached 27.6 % (Fig. 11). The average installed capacity of offshore wind turbines was 4,37 kw. Apart from the installed capacity and the rotor diameter another important feature of wind turbines is the hub height. In the first six months of 214 approx. 61 % of the new installations had a hub height of over 1 m (Fig. 12 left). Another parameter is the total height of the wind turbine which consists of hub height plus rotor radius, and which in some regions is subject to restrictions. Fig. 12 (right) shows the shares of total heights of wind turbines per federal state erected during the first six months of 214, divided into 3 height classes based on the requirements for obstruction lighting. Market Shares of Manufacturers The installation figures reported by manufacturers for the first six months of a year are not representative of the actual business concluded over the year. This has been proved by an analysis of the half-yearly and yearly figures of the past twenty years which shows that only approx. 1/3 of the yearly installations are realized during the first half of a year. Therefore the manufacturers market shares are not included in these half-yearly statistics. Eine aktuelle Übersicht zum Stand des Offhore-Windergieausbaus gibt der Artikel auf Seite 45, so dass hier nicht im Detail auf die einzelnen Projekte und Planungen eingegangen wird. Der potenzielle Jahresenergieertrag Mitunter dauert es einige Zeit, bis reale Produktionsdaten vorliegen, und um einen Anhaltspunkt zu bekommen, was die Windenergie zu leisten vermag, erfolgt hier eine Abschätzung des potenziellen Jahresenergieertrags bei einem 1%-Windjahr. Diese beruht auf den mittleren Ausnutzungsgraden, die unter Verwendung des aktuellen Produktionsindex IWET V11 [2] für WEA verschiedener Leistungsklassen je Bundesland ermittelt wurden (Mittelwert der Ausnutzungsgrade der Jahre 23 bis 212). Weiterhin wird in dieser Abschätzung angenommen, dass alle zum Jahresende gemeldeten WEA einen vollen Jahresenergieertrag beisteuern, d.h. Stillstandszeiten aufgrund von Wartung, Reparatur, Netzüberlastung etc. werden nicht berücksichtigt. Wie hoch der Anteil der Windenergie am Nettostromverbrauch [3] sein könnte, zeigt die Abb. 7, wo die Anteile des rechnerisch ermittelten potenziellen Jahresenergieertrages aufgetragen sind. Markttendenzen bei der Anlagengröße Von Jahr zu Jahr werden immer mehr Anlagen mit einem Rotordurchmesser von 9 m und größer in Deutschland er richtet (Abb. 8), im ersten Halbjahr 214 lag der Anteil bei rund 78 %. So ist dann auch nicht verwunderlich, dass die durchschnittlich installierte Onshore-Leistung auf kw angestiegen ist (Abb. 1). Ursächlich hierfür ist u. a. die vermehrte Aufstellung von Anlagen im Bereich von über 3 welcher Onshore bei 27,6 % lag (Abb. 11). Die durchschnittliche installierte Leistung der - WEA lag bei 4.37 kw. Neben der installierten Leistung und dem Rotordurchmesser ist die Nabenhöhe ein weiteres wichtiges Kriterium. Im ersten Halbjahr 214 hatten rund 61 % der errichteten Anlagen eine Nabenhöhe von über 1 m (Abb. 12 links). Wird zur Nabenhöhe noch der Rotorradius hinzugerechnet, so ergibt sich die Gesamthöhe der WEA, welche in einigen Regionen Beschränkungen unterliegt. Die Abb. 12 (rechts) zeigt den Anteil der Gesamthöhen je Bundesland für die im ersten Halbjahr 214 errichteten Anlagen, unterteilt in 3 Höhenklassen auf Basis der Be stim mungen zur Kennzeichnung von Luftfahrthin der nissen. Marktanteile der Anbieter References / Literatur: [1] Ender, Carsten: Windenergienutzung in Deutschland - Stand DEWI-Magazin (212) Nr. 43, S [2] Ingenieurwerkstatt Energietechnik (Rade) (Hrsg.): Monatsinfo: Betriebsvergleich umweltbewusster Energienutzer [3] Nettostromverbrauch 213 lt. BDEW, Bundesländer wurden hochgerechnet Die Aufstellungszahlen der einzelnen Hersteller während des ersten Halbjahres sind nicht repräsentativ für die tatsächliche Geschäftsentwicklung eines Jahres. Dieses hat eine Analyse der Halb- und Endjahreszahlen der vergangenen zwanzig Jahre ergeben, aus der hervorgeht, dass im Durchschnitt nur ca. 1/3 der Jahresaufstellungen ins erste Halbjahr fallen. Daher verzichten wir an dieser Stelle auf eine Darstellung der Herstelleranteile. 44 DEWI MAGAZIN NO. 45, AUGUST 214

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 30.06.2009 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Page 1 Stand 30.06.2009

Mehr

Status der Windenergienutzung in Deutschland - Stand B. Neddermann, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand B. Neddermann, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 30.06.2010 B. Neddermann, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand

Mehr

Status der Windenergienutzung in Deutschland Stand

Status der Windenergienutzung in Deutschland Stand Status der Windenergienutzung in Deutschland Stand 31.12.2006 J. P. Molly, DEWI GmbH DEWI GmbH - Deutsches Windenergie-Institut 1 Status der Windenergienutzung in Deutschland Stand 31.12.2006 1. Gesamte

Mehr

Deutschland - Stand B. Neddermann, DEWI GmbH

Deutschland - Stand B. Neddermann, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2009 B. Neddermann, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand

Mehr

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2008 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Page 1 Stand 31.12.2008

Mehr

Deutschland - Stand B. Neddermann, DEWI GmbH

Deutschland - Stand B. Neddermann, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.29 B. Neddermann, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand 31.12.29

Mehr

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2007 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Page 1 Stand 31.12.2007

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 3.6.211 Windenergienutzung in Deutschland - Stand 3.6.211 - C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch 211 is a year of fundamental changes in energy policy.

Mehr

Deutschland - Stand 30.06.2011. J. P. Molly, DEWI GmbH

Deutschland - Stand 30.06.2011. J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 30.06.2011 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand 30.06.2011

Mehr

Windenergienutzung in der Bundesrepublik Deutschland - Stand

Windenergienutzung in der Bundesrepublik Deutschland - Stand Windenergienutzung in der Bundesrepublik Deutschland - Stand 3.6.22 - Wind Energy Use in Germany - Status 3.6.22 C. Ender; DEWI 1. Stand der Windenergienutzung in der Bundesrepublik Deutschland In der

Mehr

Status der Windenergienutzung in Deutschland - Stand 31.12.2011. J. P. Molly, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand 31.12.2011. J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2011 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand 31.12.2011

Mehr

Windenergienutzung in der Bundesrepublik Deutschland - Stand

Windenergienutzung in der Bundesrepublik Deutschland - Stand Windenergienutzung in der Bundesrepublik Deutschland - Stand 31.12.22 - Wind Energy Use in Germany - Status 31.12.22 C. Ender, DEWI 1. Stand der Windenergienutzung in der Bundesrepublik Deutschland In

Mehr

Windenergienutzung in der Bundesrepublik Deutschland - Stand Wind Energy Use in Germany - Status

Windenergienutzung in der Bundesrepublik Deutschland - Stand Wind Energy Use in Germany - Status Windenergienutzung in der Bundesrepublik Deutschland - Stand 3.6. Wind Energy Use in Germany - Status 3.6. Rehfeldt, Knud; DEWI Summary By June 3th,, the assessment of wind energy use in Germany led to

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 3.6.213 Windenergienutzung in Deutschland - Stand 3.6.213 C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch The figures for the first six months of 213 indicate that

Mehr

Windenergie mehr Leistung neu installiert als erwartet

Windenergie mehr Leistung neu installiert als erwartet Presseinformation Bundesverband WindEnergie e.v. Power Systems Kontakt Telefon E-Mail Nick Reimer Thorsten Herdan +49 30 28 48-21 21 +49 69 66 03-13 51 n.reimer@wind-energie.de thorsten.herdan@vdma.org

Mehr

Wind Energy Use in Germany - Status 31.12.2014

Wind Energy Use in Germany - Status 31.12.2014 Wind Energy Use in Germany - Status 31.12.2014 Windenergienutzung in Deutschland - Stand 31.12.2014 C. Ender; DEWI, Wilhelmshaven ENGLISH - DEUTSCH The year 2014 has been a year of records for the development

Mehr

Windenergienutzung in der Bundesrepublik Deutschland - Stand Wind Energy Use in Germany - Status

Windenergienutzung in der Bundesrepublik Deutschland - Stand Wind Energy Use in Germany - Status DEWI Magazin Nr. 23, August 23 Windenergienutzung in der Bundesrepublik Deutschland - Stand 3.6.23 - Wind Energy Use in Germany - Status 3.6.23 C. Ender, DEWI. Stand der Windenergienutzung in der Bundesrepublik

Mehr

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind energy use in Germany at

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind energy use in Germany at Windenergienutzung in der Bundesrepublik Deutschland Stand 31.12.1992 Wind energy use in Germany at 31.12.1992 Keuper, Armin Abstract By the end of 1992 the assessment of wind energy in Germany has led

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 31.12.213 Windenergienutzung in Deutschland - Stand 31.12.213 C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch In some countries, 213 has still been a good year

Mehr

STATUS DES WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES WINDENERGIEAUSBAUS IN DEUTSCHLAND AM 3. JUNI 212 Im ersten Halbjahr 212 wurden in Deutschland 414 Windenergieanlagen mit einer installierten Gesamtleistung von rund 1. MW zugebaut. Damit erreichte mit Status 3. Juni 212 die bundesweit

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 3.6.29 Windenergienutzung in Deutschland - Stand 3.6.29 - C. Ender; DEWI Wilhelmshaven English - Deutsch Status of Wind Energy Use in Germany With 82 MW newly installed

Mehr

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status Windenergienutzung in der Bundesrepublik Deutschland Stand 30.06.1994 Wind Energy Use in Germany - Status 30.06.1994 Keuper, Armin; DEWI Summary By June 30th 1994, the assessment of wind energy in Germany

Mehr

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status DEWI Magazin Nr. 7, August 5 Windenergienutzung in Deutschland - Stand 3.6.5 - Wind Energy Use in Germany - Status 3.6.5 C. Ender; DEWI Wilhelmshaven 1. Stand der Windenergienutzung in Deutschland In Deutschland

Mehr

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status Windenergienutzung in der Bundesrepublik Deutschland Stand 31.12.1993 Wind Energy Use in Germany - Status 31.12.1993 Keuper, Armin Summary By December 31st 1993, the assessment of wind energy in Germany

Mehr

zur Windenergienutzung und

zur Windenergienutzung und Allgemeine Hinweise zur Windenergienutzung und zum Repowering Bernd Neddermann, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Fachtagung der

Mehr

Magic Figures. We note that in the example magic square the numbers 1 9 are used. All three rows (columns) have equal sum, called the magic number.

Magic Figures. We note that in the example magic square the numbers 1 9 are used. All three rows (columns) have equal sum, called the magic number. Magic Figures Introduction: This lesson builds on ideas from Magic Squares. Students are introduced to a wider collection of Magic Figures and consider constraints on the Magic Number associated with such

Mehr

FAX ANSWER. Energy Conference. First CO2 Free Wind +49 (0) / DEWEK 2004 The International Technical Conference. Conference.

FAX ANSWER. Energy Conference. First CO2 Free Wind +49 (0) / DEWEK 2004 The International Technical Conference. Conference. DEWEK 4 The International Technical Conference Conference 13 sessions in days More than 5 participants in Conference language: English English-German simultaneous translation in the main conference room

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 3.6.7 Windenergienutzung in Deutschland - Stand 3.6.7 - C. Ender; DEWI Wilhelmshaven ENGLISH - DEUTSCH 1. Status of Wind Energy Use in Germany As of 3.6.7 1, 19.4 wind

Mehr

Wind Energy Use in Germany - Status 31.12.2012

Wind Energy Use in Germany - Status 31.12.2012 Wind Energy Use in Germany - Status 31.12.212 Windenergienutzung in Deutschland - Stand 31.12.212 C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch 212 has been a good year for the development of wind

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 31.12.2009 Windenergienutzung in Deutschland - Stand 31.12.2009 - C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch Status of Wind Energy Use in Germany With 1,917

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND Jahr STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de Leistungszubau

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 31.12.27 Windenergienutzung in Deutschland - Stand 31.12.27 - C. Ender; DEWI Wilhelmshaven ENGLISH - DEUTSCH 1. Status of Wind Energy Use in Germany As of 31.12.27 1,

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - Status 31.12.21 Windenergienutzung in Deutschland - Stand 31.12.21 - C. Ender; DEWI GmbH, Wilhelmshaven English - Deutsch Summary With 1,551 MW newly installed capacity in

Mehr

STATUS DES WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES WINDENERGIEAUSBAUS IN DEUTSCHLAND 2012 Im Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de AM 31. DEZEMBER 2012 Im 2012 wurden in Deutschland 998 Windenergieanlagen mit einer

Mehr

Households with children are in the minority Households where the head of the household is 60 or older make up a third

Households with children are in the minority Households where the head of the household is 60 or older make up a third Households with children are in the minority Households where the head of the household is 60 or older make up a third Types of household in Germany Age structure of households in Germany - Number in millions

Mehr

prorm Budget Planning promx GmbH Nordring Nuremberg

prorm Budget Planning promx GmbH Nordring Nuremberg prorm Budget Planning Budget Planning Business promx GmbH Nordring 100 909 Nuremberg E-Mail: support@promx.net Content WHAT IS THE prorm BUDGET PLANNING? prorm Budget Planning Overview THE ADVANTAGES OF

Mehr

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status Windenergienutzung in der Bundesrepublik Deutschland Stand 31.12.1997 Wind Energy Use in Germany - Status 31.12.1997 Rehfeldt, Knud; DEWI Summary By December 31st, 1997, the assessment of wind energy use

Mehr

STATUS DES WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES WINDENERGIEAUSBAUS IN DEUTSCHLAND 2012 Im Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de AM 31. DEZEMBER 2012 Im Gesamtjahr 2012 wurden in Deutschland 1.008 Windenergieanlagen

Mehr

Windenergienutzung in der Bundesrepublik Deutschland Stand 30.06.1995 Wind Energy Use in Germany - Status 30.06.1995

Windenergienutzung in der Bundesrepublik Deutschland Stand 30.06.1995 Wind Energy Use in Germany - Status 30.06.1995 Windenergienutzung in der Bundesrepublik Deutschland Stand 30.06.1995 Wind Energy Use in Germany - Status 30.06.1995 Rehfeldt, Knud; DEWI Summary By June 30th 1995, the assessment of wind energy in Germany

Mehr

( World / Welt ) Year / Jahr

( World / Welt ) Year / Jahr 250.000 Accumulated Capacity / Kumulierte Leistung ( World / Welt ) Accumulated Capacity / Kumulierte Leistung MW 200.000 150.000 100.000 50.000 0 1990 1991 World without Europe Europe without Germany

Mehr

STATUS DES WINDENERGIEAUSBAUS

STATUS DES WINDENERGIEAUSBAUS 1. Halbjahr Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de Jährlich zu- / abgebaute Leistung [MW] Kumulierte Leistung [MW]

Mehr

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status DEWI Magazin Nr. 28, Februar 26 Windenergienutzung in Deutschland - Stand 31.12.25 - Wind Energy Use in Germany - Status 31.12.25 C. Ender; DEWI Wilhelmshaven 1. Stand der Windenergienutzung in Deutschland

Mehr

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status DEWI Magazin Nr. 3, Februar 7 Windenergienutzung in Deutschland - Stand 31.1.6 - Wind Energy Use in Germany - Status 31.1.6 C. Ender; DEWI Wilhelmshaven 1. Stand der Windenergienutzung in Deutschland In

Mehr

1. Stand und Entwicklung der Windenergienutzung in der Bundesrepublik Deutschland

1. Stand und Entwicklung der Windenergienutzung in der Bundesrepublik Deutschland Windenergienutzung in der Bundesrepublik Deutschland - Stand 30.06.1996 - mit einem Ausblick auf die weltweite Entwicklung Wind Energy Use in Germany - Status 30.06.1996 - With a View to the World-Wide

Mehr

Herzlich willkommen zur Pressekonferenz am 29. Januar 2015 Windenergie an Land Jahreszahlen 2014

Herzlich willkommen zur Pressekonferenz am 29. Januar 2015 Windenergie an Land Jahreszahlen 2014 Herzlich willkommen zur Pressekonferenz am 29. Januar 2015 Windenergie an Land Jahreszahlen Als Gesprächspartner stehen Ihnen zur Verfügung: Anna-Kathrin Wallasch, Deutsche WindGuard GmbH Lars Bondo Krogsgaard,

Mehr

Herzlich willkommen zur Pressekonferenz am 29. Januar 2015 Windenergie an Land Jahreszahlen Als Gesprächspartner stehen Ihnen zur Verfügung:

Herzlich willkommen zur Pressekonferenz am 29. Januar 2015 Windenergie an Land Jahreszahlen Als Gesprächspartner stehen Ihnen zur Verfügung: Herzlich willkommen zur Pressekonferenz am 29. Januar 215 Windenergie an Land Jahreszahlen Als Gesprächspartner stehen Ihnen zur Verfügung: Anna-Kathrin Wallasch, Deutsche WindGuard GmbH Lars Bondo Krogsgaard,

Mehr

EINSPEISEMANAGEMENT: GRUNDLAGEN, ANALYSE- UND PROGNOSEMÖGLICHKEITEN

EINSPEISEMANAGEMENT: GRUNDLAGEN, ANALYSE- UND PROGNOSEMÖGLICHKEITEN EWC WEATHER CONSULT EINSPEISEMANAGEMENT: GRUNDLAGEN, ANALYSE- UND PROGNOSEMÖGLICHKEITEN DAVID WÖLFLE 26. WINDENERGIETAGE, 08.11.2017 About Team Manager at EWC Weather Consult GmbH https://www.linkedin.com/in/david-woelfle/

Mehr

Where are we now? The administration building M 3. Voransicht

Where are we now? The administration building M 3. Voransicht Let me show you around 9 von 26 Where are we now? The administration building M 3 12 von 26 Let me show you around Presenting your company 2 I M 5 Prepositions of place and movement There are many prepositions

Mehr

Cycling and (or?) Trams

Cycling and (or?) Trams Cycling and (or?) Trams Can we support both? Experiences from Berne, Switzerland Roland Pfeiffer, Departement for cycling traffic, City of Bern Seite 1 A few words about Bern Seite 2 A few words about

Mehr

Pressekonferenz. Windenergie an Land Marktanalyse Deutschland 1. Halbjahr 2016

Pressekonferenz. Windenergie an Land Marktanalyse Deutschland 1. Halbjahr 2016 Pressekonferenz Windenergie an Land Marktanalyse Deutschland 1. Halbjahr 2016 1. Halbjahr 2016 STATUS DES WINDENERGIEAUSBAUS AN LAND IN DEUTSCHLAND Im Auftrag von: Status des Windenergieausbaus an Land

Mehr

Aktuelle Grundgehaltssätze der Besoldungsordnung A im Bund und in den Ländern

Aktuelle Grundgehaltssätze der Besoldungsordnung A im Bund und in den Ländern 1. Bund 2. Baden-Württemberg 3. Bayern 4. Berlin 5. Brandenburg 6. Bremen 7. Hamburg 8. Hessen 9. Mecklenburg-Vorpommern 10. Niedersachsen 11. Nordrhein-Westfalen 12. Rheinland-Pfalz 13. Saarland 14. Sachsen

Mehr

Cycling. and / or Trams

Cycling. and / or Trams Cycling and / or Trams Experiences from Bern, Switzerland Roland Pfeiffer, Departement for cycling traffic, City of Bern Seite 1 A few words about Bern Seite 2 A few words about Bern Capital of Switzerland

Mehr

Wind Energy Use in Germany - Status

Wind Energy Use in Germany - Status Wind Energy Use in Germany - tatus 31.12.28 Windenergienutzung in Deutschland - tand 31.12.28 - C. Ender; DEWI Wilhelmshaven ENGLIH - DEUTCH 1. tatus of Wind Energy Use in Germany With 1,665 MW newly installed

Mehr

Die Bedeutung neurowissenschaftlicher Erkenntnisse für die Werbung (German Edition)

Die Bedeutung neurowissenschaftlicher Erkenntnisse für die Werbung (German Edition) Die Bedeutung neurowissenschaftlicher Erkenntnisse für die Werbung (German Edition) Lisa Johann Click here if your download doesn"t start automatically Download and Read Free Online Die Bedeutung neurowissenschaftlicher

Mehr

FIVNAT-CH. Annual report 2002

FIVNAT-CH. Annual report 2002 FIVNAT-CH Schweizerische Gesellschaft für Reproduktionsmedizin Annual report 2002 Date of analysis 15.01.2004 Source: FileMaker Pro files FIVNAT_CYC.FP5 and FIVNAT_PAT.FP5 SUMMARY TABLE SUMMARY RESULTS

Mehr

Pressekonferenz Windenergie an Land Marktanalyse Deutschland 2016

Pressekonferenz Windenergie an Land Marktanalyse Deutschland 2016 Pressekonferenz Windenergie an Land Marktanalyse Deutschland 2016 Bild: Vestas Jahr 2016 STATUS DES WINDENERGIEAUSBAUS AN LAND IN DEUTSCHLAND Anna-Kathrin Wallasch Deutsche WindGuard GmbH Im Auftrag von:

Mehr

Pressekonferenz. Windenergie an Land Marktanalyse Deutschland 1. Halbjahr 2016

Pressekonferenz. Windenergie an Land Marktanalyse Deutschland 1. Halbjahr 2016 Pressekonferenz Windenergie an Land Marktanalyse Deutschland 1. Halbjahr 2016 1. Halbjahr 2016 STATUS DES WINDENERGIEAUSBAUS AN LAND IN DEUTSCHLAND Dr.-Ing.- Knud Rehfeldt Geschäftsführer Deutsche WindGuard

Mehr

Dynamic Hybrid Simulation

Dynamic Hybrid Simulation Dynamic Hybrid Simulation Comparison of different approaches in HEV-modeling GT-SUITE Conference 12. September 2012, Frankfurt/Main Institut für Verbrennungsmotoren und Kraftfahrwesen Universität Stuttgart

Mehr

Pressekonferenz Windenergie an Land Marktanalyse Deutschland 2016

Pressekonferenz Windenergie an Land Marktanalyse Deutschland 2016 Pressekonferenz Windenergie an Land Marktanalyse Deutschland 2016 Bild: Vestas Jahr 2016 STATUS DES WINDENERGIEAUSBAUS AN LAND IN DEUTSCHLAND Anna Kathrin Wallasch Deutsche WindGuard GmbH Im Auftrag von:

Mehr

Level 2 German, 2015

Level 2 German, 2015 91126 911260 2SUPERVISOR S Level 2 German, 2015 91126 Demonstrate understanding of a variety of written and / or visual German text(s) on familiar matters 2.00 p.m. Friday 4 December 2015 Credits: Five

Mehr

Rev. Proc Information

Rev. Proc Information Rev. Proc. 2006-32 Information 2006, CPAs 1 Table 1-Total loss of the home Table 2- Near total loss is water to the roofline. Completely gut the home from floor to rafters - wiring, plumbing, electrical

Mehr

EVANGELISCHES GESANGBUCH: AUSGABE FUR DIE EVANGELISCH-LUTHERISCHE LANDESKIRCHE SACHSEN. BLAU (GERMAN EDITION) FROM EVANGELISCHE VERLAGSAN

EVANGELISCHES GESANGBUCH: AUSGABE FUR DIE EVANGELISCH-LUTHERISCHE LANDESKIRCHE SACHSEN. BLAU (GERMAN EDITION) FROM EVANGELISCHE VERLAGSAN EVANGELISCHES GESANGBUCH: AUSGABE FUR DIE EVANGELISCH-LUTHERISCHE LANDESKIRCHE SACHSEN. BLAU (GERMAN EDITION) FROM EVANGELISCHE VERLAGSAN DOWNLOAD EBOOK : EVANGELISCHES GESANGBUCH: AUSGABE FUR DIE EVANGELISCH-LUTHERISCHE

Mehr

Project Presentation Detection of Development Trends in the National Forest Inventory Data for WEHAM- Forest Development and Timber Resource Modeling

Project Presentation Detection of Development Trends in the National Forest Inventory Data for WEHAM- Forest Development and Timber Resource Modeling Project Presentation Detection of Development Trends in the National Forest Inventory Data for WEHAM- Forest Development and Timber Resource Modeling Thünen Institute of Forest Ecosystems Page Eberswalde

Mehr

Level 2 German, 2016

Level 2 German, 2016 91126 911260 2SUPERVISOR S Level 2 German, 2016 91126 Demonstrate understanding of a variety of written and / or visual German texts on familiar matters 2.00 p.m. Tuesday 29 November 2016 Credits: Five

Mehr

Copyright by Max Weishaupt GmbH, D Schwendi

Copyright by Max Weishaupt GmbH, D Schwendi Improving Energy Efficiency through Burner Retrofit Overview Typical Boiler Plant Cost Factors Biggest Efficiency Losses in a boiler system Radiation Losses Incomplete Combustion Blowdown Stack Losses

Mehr

Meteorological measurements at the Offshore Platform FINO 2 - new insights -

Meteorological measurements at the Offshore Platform FINO 2 - new insights - FINO 2011 Conference May 11 th 2011, Hamburg, Germany Meteorological measurements at the Offshore Platform FINO 2 - new insights - Dipl.-Geoök. Stefan Müller, Dipl.-Ing Joachim Schwabe Content 1. FINO

Mehr

Wie man heute die Liebe fürs Leben findet

Wie man heute die Liebe fürs Leben findet Wie man heute die Liebe fürs Leben findet Sherrie Schneider Ellen Fein Click here if your download doesn"t start automatically Wie man heute die Liebe fürs Leben findet Sherrie Schneider Ellen Fein Wie

Mehr

Mock Exam Behavioral Finance

Mock Exam Behavioral Finance Mock Exam Behavioral Finance For the following 4 questions you have 60 minutes. You may receive up to 60 points, i.e. on average you should spend about 1 minute per point. Please note: You may use a pocket

Mehr

The Solar Revolution New Ways for Climate Protection with Solar Electricity

The Solar Revolution New Ways for Climate Protection with Solar Electricity www.volker-quaschning.de The Solar Revolution New Ways for Climate Protection with Solar Electricity Hochschule für Technik und Wirtschaft HTW Berlin ECO Summit ECO14 3. June 2014 Berlin Crossroads to

Mehr

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016 Overview The Hamburg Süd VGM Web portal is an application that enables you to submit VGM information directly to Hamburg Süd via our e-portal Web page. You can choose to enter VGM information directly,

Mehr

Die "Badstuben" im Fuggerhaus zu Augsburg

Die Badstuben im Fuggerhaus zu Augsburg Die "Badstuben" im Fuggerhaus zu Augsburg Jürgen Pursche, Eberhard Wendler Bernt von Hagen Click here if your download doesn"t start automatically Die "Badstuben" im Fuggerhaus zu Augsburg Jürgen Pursche,

Mehr

Level 1 German, 2016

Level 1 German, 2016 90886 908860 1SUPERVISOR S Level 1 German, 2016 90886 Demonstrate understanding of a variety of German texts on areas of most immediate relevance 2.00 p.m. Wednesday 23 November 2016 Credits: Five Achievement

Mehr

Summary Details for Performance, Duration and Acoustic Measurements for the. Aircon 10S Wind Turbine. UK MCS Certification Summary

Summary Details for Performance, Duration and Acoustic Measurements for the. Aircon 10S Wind Turbine. UK MCS Certification Summary Summary Details for Performance, Duration and Acoustic Measurements for the Aircon 10S Wind Turbine UK MCS Certification Summary Certificate Number MCS TUV0007 Small Wind Turbine Certification Summary

Mehr

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status

Windenergienutzung in der Bundesrepublik Deutschland Stand Wind Energy Use in Germany - Status Windenergienutzung in der Bundesrepublik Deutschland Stand 31.12.1994 Wind Energy Use in Germany - Status 31.12.1994 Keuper, Armin; DEWI Summary By December 31st 1994, the assessment of wind energy in

Mehr

FACHKUNDE FüR KAUFLEUTE IM GESUNDHEITSWESEN FROM THIEME GEORG VERLAG

FACHKUNDE FüR KAUFLEUTE IM GESUNDHEITSWESEN FROM THIEME GEORG VERLAG FACHKUNDE FüR KAUFLEUTE IM GESUNDHEITSWESEN FROM THIEME GEORG VERLAG DOWNLOAD EBOOK : FACHKUNDE FüR KAUFLEUTE IM GESUNDHEITSWESEN Click link bellow and free register to download ebook: FACHKUNDE FüR KAUFLEUTE

Mehr

Funktion der Mindestreserve im Bezug auf die Schlüsselzinssätze der EZB (German Edition)

Funktion der Mindestreserve im Bezug auf die Schlüsselzinssätze der EZB (German Edition) Funktion der Mindestreserve im Bezug auf die Schlüsselzinssätze der EZB (German Edition) Philipp Heckele Click here if your download doesn"t start automatically Download and Read Free Online Funktion

Mehr

Pilot Project Biogas-powered Micro-gas-turbine

Pilot Project Biogas-powered Micro-gas-turbine 1/18 Pilot Project Biogas-powered Micro-gas-turbine Supported by the Hessischen Ministerium für Wirtschaft, Verkehr und Landesentwicklung Speaker Details 2/18 Jan Müller Works at Institute of Solar Energy

Mehr

Finite Difference Method (FDM)

Finite Difference Method (FDM) Finite Difference Method (FDM) home/lehre/vl-mhs-1-e/folien/vorlesung/2a_fdm/cover_sheet.tex page 1 of 15. p.1/15 Table of contents 1. Problem 2. Governing Equation 3. Finite Difference-Approximation 4.

Mehr

QS Laborkompetenztest Frühjahr 2011

QS Laborkompetenztest Frühjahr 2011 Qualitätssicherung. Vom Erzeuger bis zur Ladentheke. QS Laborkompetenztest Frühjahr 2011 Bewertungsschema Laborkompetenztest Frühjahr 2011 Bestanden alle 6 Wirkstoffe identifiziert und mindestens 4 Wirkstoffe

Mehr

A Classification of Partial Boolean Clones

A Classification of Partial Boolean Clones A Classification of Partial Boolean Clones DIETLINDE LAU, KARSTEN SCHÖLZEL Universität Rostock, Institut für Mathematik 25th May 2010 c 2010 UNIVERSITÄT ROSTOCK MATHEMATISCH-NATURWISSENSCHAFTLICHE FAKULTÄT,

Mehr

Aktuelle Grundgehaltssätze der Besoldungsordnung A im Bund und in den Ländern

Aktuelle Grundgehaltssätze der Besoldungsordnung A im Bund und in den Ländern 1. Bund 2. Baden-Württemberg 3. Bayern 4. Berlin 5. Brandenburg 6. Bremen 7. Hamburg 8. Hessen 9. Mecklenburg-Vorpommern 10. Niedersachsen 11. Nordrhein-Westfalen 12. Rheinland-Pfalz 13. Saarland 14. Sachsen

Mehr

Level 1 German, 2012

Level 1 German, 2012 90886 908860 1SUPERVISOR S Level 1 German, 2012 90886 Demonstrate understanding of a variety of German texts on areas of most immediate relevance 9.30 am Tuesday 13 November 2012 Credits: Five Achievement

Mehr

Status of Repowering in 2013

Status of Repowering in 2013 Status of Repowering in 2013 Bilanz des Repowering im Jahr 2013 B. Neddermann; DEWI GmbH, Wilhelmshaven English - Deutsch In 2013, repowering in Germany has once more made a significant contribution to

Mehr

Englisch-Grundwortschatz

Englisch-Grundwortschatz Englisch-Grundwortschatz Die 100 am häufigsten verwendeten Wörter also auch so so in in even sogar on an / bei / in like wie / mögen their with but first only and time find you get more its those because

Mehr

Mitglied der Leibniz-Gemeinschaft

Mitglied der Leibniz-Gemeinschaft Methods of research into dictionary use: online questionnaires Annette Klosa (Institut für Deutsche Sprache, Mannheim) 5. Arbeitstreffen Netzwerk Internetlexikografie, Leiden, 25./26. März 2013 Content

Mehr

1. General information... 2 2. Login... 2 3. Home... 3 4. Current applications... 3

1. General information... 2 2. Login... 2 3. Home... 3 4. Current applications... 3 User Manual for Marketing Authorisation and Lifecycle Management of Medicines Inhalt: User Manual for Marketing Authorisation and Lifecycle Management of Medicines... 1 1. General information... 2 2. Login...

Mehr

Dienstleistungsmanagement Übung 5

Dienstleistungsmanagement Übung 5 Dienstleistungsmanagement Übung 5 Univ.-Prof. Dr.-Ing. Wolfgang Maass Chair in Economics Information and Service Systems (ISS) Saarland University, Saarbrücken, Germany Besprechung Übungsblatt 4 Slide

Mehr

Newest Generation of the BS2 Corrosion/Warning and Measurement System

Newest Generation of the BS2 Corrosion/Warning and Measurement System Newest Generation of the BS2 Corrosion/Warning and Measurement System BS2 System Description: BS2 CorroDec 2G is a cable and energyless system module range for detecting corrosion, humidity and prevailing

Mehr

Selbstbild vs. Fremdbild. Selbst- und Fremdwahrnehmung des Individuums (German Edition)

Selbstbild vs. Fremdbild. Selbst- und Fremdwahrnehmung des Individuums (German Edition) Selbstbild vs. Fremdbild. Selbst- und Fremdwahrnehmung des Individuums (German Edition) Jasmin Nowak Click here if your download doesn"t start automatically Selbstbild vs. Fremdbild. Selbst- und Fremdwahrnehmung

Mehr

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL - USER GUIDE June 2016

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL - USER GUIDE June 2016 Overview The Hamburg Süd VGM-Portal is an application which enables to submit VGM information directly to Hamburg Süd via our e-portal web page. You can choose to insert VGM information directly, or download

Mehr

CNC ZUR STEUERUNG VON WERKZEUGMASCHINEN (GERMAN EDITION) BY TIM ROHR

CNC ZUR STEUERUNG VON WERKZEUGMASCHINEN (GERMAN EDITION) BY TIM ROHR (GERMAN EDITION) BY TIM ROHR READ ONLINE AND DOWNLOAD EBOOK : CNC ZUR STEUERUNG VON WERKZEUGMASCHINEN (GERMAN EDITION) BY TIM ROHR PDF Click button to download this ebook READ ONLINE AND DOWNLOAD CNC ZUR

Mehr

Introduction FEM, 1D-Example

Introduction FEM, 1D-Example Introduction FEM, 1D-Example home/lehre/vl-mhs-1-e/folien/vorlesung/3_fem_intro/cover_sheet.tex page 1 of 25. p.1/25 Table of contents 1D Example - Finite Element Method 1. 1D Setup Geometry 2. Governing

Mehr

Marktvolumen und Industrialisierung Perspektive der Hersteller und Zulieferunternehmen

Marktvolumen und Industrialisierung Perspektive der Hersteller und Zulieferunternehmen Marktvolumen und Industrialisierung Perspektive der Hersteller und Zulieferunternehmen Industrialisierungsperspektiven der Offshore-Windenergie Parlamentarischer Abend, 15. Mai 2017 Bild: Siemens Gamesa

Mehr

There are 10 weeks this summer vacation the weeks beginning: June 23, June 30, July 7, July 14, July 21, Jul 28, Aug 4, Aug 11, Aug 18, Aug 25

There are 10 weeks this summer vacation the weeks beginning: June 23, June 30, July 7, July 14, July 21, Jul 28, Aug 4, Aug 11, Aug 18, Aug 25 Name: AP Deutsch Sommerpaket 2014 The AP German exam is designed to test your language proficiency your ability to use the German language to speak, listen, read and write. All the grammar concepts and

Mehr

Wind Energy Development 2012 in Germany Benefits from Repowering

Wind Energy Development 2012 in Germany Benefits from Repowering Wind Energy Development 2012 in Germany Benefits from Repowering Windenergieausbau 2012 in Deutschland profitiert vom Repowering B. Neddermann; DEWI Wilhelmshaven English - Deutsch Introduction The use

Mehr

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status

Windenergienutzung in Deutschland - Stand Wind Energy Use in Germany - Status DEWI Magazin Nr. 26, Februar 25 Windenergienutzung in Deutschland - Stand 1.12.24 - Wind Energy Use in Germany - Status 1.12.24 C. Ender, DEWI Wilhelmshaven 1. Stand der Windenergienutzung in Deutschland

Mehr