Bestell.Nr.: 1331703 Kurzbeschreibung Inhaltsverzeichnis des Moduls 1. 2. Work process of projects 3. Exercise: Work process of projects 4. Tasks of the project planning 5. Exercise: Tasks of the project planning 6. and controlling as a control loop 7. 8. Exercise: 9. Exercise: 10. Project controlling 11. Exercise: Project controlling 12. Value of the planning resources 13. What does phase division mean? 14. Exercise: Phase division 15. Advantages of the phase division 16. Exercise: Advantages of the phase division 17. Contents and number of the phases 18. Exercise: Contents and number of the phases 19. The phases of the project organisation 20. The phases of the project organisation 21. Phase division 22. Example of a phase division in plant engineering 23. Phase divisions in comparison 24. Phase overlapping 25. Exercise: Phase overlapping 26. Exercise: Division of project phases 27. Work process in the phase 28. Exercise: Work process in the phase Site 1/5
29. Structures in projects 30. Exercise: Structures in projects 31. Exercise: Project structures 32. Task of the project structure plan 33. Exercise: Task of the project structure plan 34. Structure and requirements 35. Exercise: Structure and requirements 36. Project structure plans 37. Object-oriented project structure plan 38. Function-oriented project structure plan 39. Process-oriented project structure plan 40. Mixed-oriented project structure plan 41. Organising the project structure plan 42. Exercise: Numbering the project structure plan 43. Types of representation 44. Exercise: Types of representation 45. The project structure (structural analysis) 46. The project structure plan (engineering phase) 47. Work Package 48. Exercise: Work package 49. Exercise: Work packages 50. Work package description 51. Exercise: Work package description 52. Steps for work package description 53. Exercise: Steps for work package description 54. Form for the work package description 55. Work package descriptions (task specification) 56. Exercise 1: Work package tasks, requirements, problems 57. Exercise 2: Work package tasks, requirements, problems 58. Exercise 3: Work package tasks, requirements, problems 59. Scheduling steps in summary 60. Exercise: Overview of the time scheduling steps 61. Time scheduling steps in detail 62. Exercise: Time scheduling steps in detail Seite 2/5
63. Procedure I 64. Exercise: Procedure I 65. Precedence relationships 66. Time lags 67. Exercise: Project Management 68. Time calculation 69. Exercise 1: Time calculation 70. Exercise 2: Time calculation 71. Float times 72. Exercise: Float times 73. Critical and subcritical paths 74. Exercise: Critical and subcritical paths 75. The time scheduling (Bar chart /network diagram) 76. Techniques and representation of the time scheduling 77. Network diagram 78. Exercise: Network diagram 79. Exercise: Network diagram 80. Overview of network plan types 81. Exercise: Network diagram types 82. Activity node network 83. Exercise: Activity node network 84. The network diagram 85. The time scheduling (overview diagram) 86. Other types of network diagrams 87. Exercise: Other network diagram types 88. Simple bar chart 89. Exercise: Simple bar chart 90. The outline bar chart 91. The networked bar chart 92. Exercise: Networked bar chart 93. Networked bar chart 94. Deadline schedule 95. Overview of deadlines 96. Milestones Seite 3/5
97. Exercise: Milestones 98. Phase regulation and main milestone 99. Procedure II 100. Exercise: Procedure II 101. Shortening the activity duration 102. Exercise: Shortening of the activity duration 103. Optimisation of the work process 104. Exercise: Optimisation of the work process 105. Exercise 1: Time schedule and optimisation 106. Exercise 2: Time schedule and optimisation 107. Exercise 3: Time schedule and optimisation 108. Exercise 4: Time schedule and optimisation 109. Tasks and resource types 110. Exercise: Tasks and resource types 111. Exercise: Tasks and resource types 112. Resource planning steps 113. Exercise: Resource planning 114. Cost planning 115. Exercise: Cost planning 116. Cost planning in the course of the project 117. Exercise: Cost planning in the course of the project 118. Steps of the detailed cost planning 119. From the project structure plan to the cost structure 120. Exercise: From the project structure plan to the cost structure 121. Quantity estimates 122. Exercise: Quantity estimates 123. Calculation and budget 124. Exercise: Calculation and budgeting 125. The cost planning (preliminary cost estimate) 126. Exercise: Cost planning 127. The budget 128. Final Test (1) 129. Final Test (2) Seite 4/5
130. Final Test (3) 131. Final Test (4) 132. Allgemeine Informationen Sprache: Englisch Lerndauer: 3 Lernstunden zum Selbststudium Zugriffsdauer: 4 Wochen Systemvoraussetzungen: Um unsere Lernmodule nutzen zu können, muss Ihr Computer folgende Voraussetzungen erfüllen: Hardware: Software: PC ab 90 MHz mindestens 32 MB RAM Arbeitsspeicher Microsoft Internet Explorer ab Version 4.01 oder Netscape Communicator ab Version 4.6 Plug-Ins: Real Player 8 Macromedia Flash Player 5 Für manche Online-Module werden weitere Plug Ins benötigt. Bei Bedarf werden diese nach Vorankündigung automatisch auf Ihrem Rechner eingerichtet. Für manche Lerneinheiten empfehlen wir eine Soundkarte mit Boxen oder Headsets. Hersteller: Bayerischen Wirtschaft (bfz) ggmbh Inhalt: bfz ggmbh Seite 5/5