Power Plant Characteristics. of Wind Turbines. Kraftwerkseigenschaften von Windenergieanlagen. Einleitung. Introduction
|
|
- Dirk Hausler
- vor 7 Jahren
- Abrufe
Transkript
1 Power Plant Characteristics of Wind Turbines Kraftwerkseigenschaften von Windenergieanlagen R. Klosse, F. Santjer; DEWI GmbH, Wilhelmshaven R. Klosse English - Deutsch Introduction Power plant characteristics are additional requirements and services to be fulfilled by a wind turbine (WT), but also by other generating plants, such as PV systems, enginebased cogeneration systems etc., in order to obtain permission for connection to the public grid in Germany. These requirements are based on the BDEW (German Association of Energy and Water Industries) guideline [1], the Trans mission Code 2007 [2] and the system services regulation (SDLWindV)[3]. In order to verify that these requirements are met by the generating plants, measurement and assessment procedures have been established in IEC [4] and FGW TR3 [5]. This article gives an overview of the requirements and of the methods of verification. In the next issues of DEWI Magazin the individual requirements, test procedures and analysis methods will be described in more detail. Power Plant Characteristics For a safe operation of the electricity supply grids with a high proportion of decentralised energy generating plants it is necessary that the energy generating plants contribute Einleitung Kraftwerkseigenschaften sind zusätzliche Anforderungen und auch Dienstleistungen, die eine Windenergieanlage (WEA) aber auch andere Erzeugungseinheiten (EZE), wie z. B. Photovoltaikanlagen, Blockheizkraftwerk, usw. erfüllen müssen, um die Anschlussgenehmigung an das öffentliche Netz in Deutschland zu erhalten. Die Grundlagen für diese Anforderungen ist die BDEW-Richtlinie [1], der TransmissionCode 2007 [2] und die Systemdienstleistungsverordnung (SDLWindV) [3]. Um zu überprüfen, ob die Anforderungen auch tatsächlich von den Erzeugungseinheiten eingehalten werden, legen die IEC [4] bzw. die FGW TR3 [5] entsprechende Prüfverfahren fest. In diesem Artikel wird eine Übersicht über die Anforderungen sowie die Möglichkeiten der Überprüfung gegeben. In den nächsten DEWI- Magazinen sollen dann die einzelnen Anforderungen, die Prüfmethoden und Analyseverfahren detaillierter beschrieben werden. Kraftwerkseigenschaften Für den sicheren Betrieb der elektrischen Netze bei hohem Anteil dezentraler Energieerzeuger ist es notwendig, dass 68 DEWI MAGAZIN NO. 36, FEBRUARY 2010
2 to grid support and regulation. Apart from wind turbines this also refers to PV systems, engine-based cogeneration systems and other generating plants. In order to provide grid support, generating plants must be capable of controlling their active as well as their reactive power. In case of a grid fault, for example short-term voltage drops, the generating systems should not shut down, but help to support the voltage by supplying reactive power. These requirements are in detail: Limitation of Power Production by the Grid Operator In case of failure or shutdown of subgrids, unintentional overloads in other parts of the grid may occur. In these cases it may be necessary to reduce the active power of wind turbines and other generating plants in order to avoid a further overloading of the grid. A similar requirement already has existed for many years in Schleswig- Holstein where due to bottlenecks in the power lines the active power of the wind farms must be reduced during strong winds. The grid operator sends a setpoint signal to the wind farm to communicate the power reduction. For the verification of the wind turbines and also of the other generating plants according to FGW TR3 and IEC a set-point value is sent to the control system of the wind turbine or the wind farm controller and the power reduction is measured. Here the accuracy of adjustment and the time response are determined, see Fig. 2. The accuracy of adjustment is determined by varying the set-point levels in the form of a step function. In this comparison the unit tested will be given a transient recovery time of 1 minute. For determining the response time a set-point step-change is applied which demands a quick power reduction from 100% to 30% and 15% of nominal output. Power-Reduced Operation in case of Overfrequency of the Grid Overfrequency occurs in electricity supply grids when more power is generated than is consumed at the same time. In normal operation, some power plants are regulated so that power generation and consumption are always balanced. Then the grid has a frequency of 50 Hz. If serious faults occur in the grid, the grid can be split into several parts which are then regulated separately. In such a case partial grids may be formed in which more power is generated than consumed. This happened for example in November 2006, when due to overload in one section of the grid the European grid was split into several subgrids, and in the northern and eastern parts a short-term overfrequency occurred as a result of excessive power generation, which was then reduced to nominal frequency. Since for the verification of wind turbine behaviour it is not possible to increase the actual frequency in the grid, the following methods can be used: In the simplest case, the simulated grid frequency can be calculated from the sum of the grid frequency Das Haus der Technik hat sich zu einem der führenden Tagungs- und Seminaranbieter im Bereich der Windenergienutzung entwickelt. Das Themendecken den gesamten Lebenszyklus einer Windenergieanlage von der Entwicklung und technischen Planung bis zu Betrieb und Wartung ab. Windenergie inside! Internationale Experten geben als Seminarleiter und Referenten im Haus der Technik ihr Wissen an die Teil nehmer weiter. Nutzen Sie unseren Vorsprung für Ihren Geschäftserfolg in einem der wichtigen Wachstumsmärkte weltweit. Zwei Teilnehmer einer Firma zahlen bei gleichzeitiger Anmeldung nur einmal. Sie sparen 50% Mehr infos unter: Telefon: DEWI MAGAZIN NO. 36, FEBRUARY Ab 2010 auch englischsprachiges Angebot:
3 Fig. 2: Abb. 2: Verification of the response time. Überprüfung der Einstellzeit. Fig. 1: Abb. 1: Verification of the adjustment accuracy of the active power. P_Setcurve is compared with the active power measured, P_Measured. Überprüfung der Einstellgenauigkeit der Wirkleistung. Die Sollwertkurve P_Setcurve wird mit der gemessenen Wirkleistung P_Measured verglichen. measured and an added overfrequency in the control system of the wind turbine. These values are checked during the test, see Fig. 3. A similar method is to reduce the parameter nominal frequency in the control system, so that the real grid frequency measured then can be interpreted as overfrequency. A slightly different possibility is to connect a grid simulator to the input terminals of the frequency meter of the wind turbine. The grid simulator generates voltages with over-frequency which are recognised by the wind turbine s control system and then are evaluated. Reconnection after Grid Failure Since after a grid failure the grid has to be built up again slowly, generating plants are not allowed to reconnect to the grid with full power output. The power increase is therefore limited to 10% of the nominal output per minute. die Energieerzeuger sich an der Netzstützung und Regelung beteiligen. Hierbei sind neben Windenergieanlagen auch Photovoltaikanlagen, Blockheizkraftwerke und andere Energieerzeuger angesprochen. Hierzu ist es erforderlich, dass die Erzeugungsanlagen sowohl die Wirkleistung, als auch die Blindleistung regeln können. Im Fehlerfall des Netzes, also z. B. bei kurzzeitigen Spannungseinbrüchen, sollen die Erzeugungsanlagen nicht abschalten, sondern sollen durch die Lieferung von Blindleistung die Spannung wieder anheben. Im Einzelnen stellen sich die Anforderungen wie folgt dar: Leistungsbegrenzter Betrieb durch den Netzbetreiber Bei Ausfall oder Abschaltung von Teilnetzen kann es in Ausnahmefällen zu ungewollten Überlastungen in anderen Teilen des Netzes kommen. In diesen Fällen kann es notwendig sein, die Wirkleistung von Windenergieanlagen und von anderen Erzeugungsanlagen zu reduzieren, um eine weitere Überlast des Netzes zu vermeiden. Eine vergleichbare Anforderung gibt es schon seit etlichen Jahren in Schleswig- 70 DEWI MAGAZIN NO. 36, FEBRUARY 2010
4 Fig. 3: Abb. 3: Measurement of active power reduction P_Measured as a function of overfrequency. Messung der Wirkleistungsreduzierung P_Mesured als Funktion der Überfrequenz. Fig. 4: Abb. 4: Reactive power capacity as a function of Q(P). Here two settings were tested: maximal inductive and maximal capacitive reactive power of a wind turbine. The individual 1-minute measuring values are reduced to the power classes marked with large dots. Blindleistungsvermögen als Funktion der Wirkleistung Q(P). Hier sind zwei Einstellungen getestet: maximale induktive und maximale kapazitive Blindleistung einer Windenergieanlage. Die einzelnen 1 Minuten Messwerte werden auf die mit dicken Punkten dargestellten Leistungsklassen reduziert. For the test of the generating plant, a grid failure is simulated by switching off the medium-voltage circuit-breaker and then, after reconnecting the generating plant, the increase of active power is measured and also the gradient of the rise. Another parameter measured is the time required by the wind turbine or generating plant until power generation is resumed after reconnecting voltage. For this purpose 3 different voltage drops are simulated with power failure periods of 10 seconds, 1 minute and 10 minutes. Reactive Power Control Apart from the active power which describes the actual power transmission from the generator to the user, in a stable grid also the reactive power must be balanced. The reactive power is a system power. Reactive power does not contribute to the transmission of electricity. There are two different types of reactive power: on the one hand inductive reactive power, which occurs in electrical machines, transformers and in power lines with high loads. In guide- Holstein, wo aufgrund von Leitungsengpässen bei Starkwind die Wirkleistung der Windparks verringert werden muss. Der Netzbetreiber teilt dem Windpark die Leistungsreduzierung über ein elektrisches Sollwertsignal mit. Für die Überprüfung der Windenergieanlagen und auch der anderen Erzeugungseinheiten wird gemäß der FGW TR3 und der IEC ein Sollwertsignal auf die Steuerung oder auf den Parkregler gegeben und die Leistungsreduzierung gemessen. Hierbei werden die Einstellgenauigkeit und die Einstellzeit (Sprungantwort) ermittelt, sh. Abb. 1 und 2. Die Einstellgenauigkeit wird bestimmt durch Variation der Sollwertpegel in Form einer Treppenfunktion. Bei diesem Vergleich wird dem Prüfling eine Einschwingzeit von 1-Minute eingeräumt. Für die Ermittlung der Einstellzeit wird ein Sollwertsprung angelegt, der eine schnelle Leistungsreduktion von 100% auf 30% bzw. 15% der Nennleistung verlangt. Leistungsbegrenzter Betrieb bei Netzfrequenzüberhöhung Überfrequenz in elektrischen Netzen entsteht, wenn mehr DEWI MAGAZIN NO. 36, FEBRUARY
5 Neben der Wirkleistung, die den momentanen Energietransport zwischen Erzeuger und Nutzer beschreibt, muss für ein stabiles Netz auch die Blindleistung ausgeglichen sein. Die Blindleistung ist eine Systemleistung. Blindleistung trägt nicht zum Transport von elektrischer Leistung bei. Man unterscheidet zum Einen zwischen induktiver Blind leistung, die in elektrischen Maschinen, Transformalines and standards this is often referred to as reactive power import or reactive power consumption. On the other hand there is the capacitive reactive power, which only occurs in cable networks. Quite often this capacitive reactive power has to be supplied by compensation equipment or generators, in order to compensate the inductive reactive power. This is also referred to as reactive power generation or reactive power production. Inductive and capacitive reactive power always have to be balanced. If reactive power generators and consumers are far away from each other, there is an additional flow of current which also causes loss of active power. Apart from this, reactive power also has a significant influence on the voltage level. According to the requirements, wind turbines and all other generating plants must be capable of controlling inductive as well as capacitive reactive power. Controlling is possible via a fixed or variable set point or as a function of the active power produced or of the voltage prevailing. For the verification of the wind turbine behaviour first it is determined how much inductive and capacitive reactive power can be provided by the generating plant. An example is given in Fig. 4. It is also tested how closely the reactive power follows a set point and in which time. The response times are determined by evaluation of step responses to set-point changes, see Fig. 5. The accuracy of adjustment is determined by comparison with different set-points, see Fig. 6. The possibility to produce reactive power by additional components, such as STATCOMS outside the wind turbine, is also to be considered. In wind farms only the behaviour of the plant as a whole (the generating plant) is of interest. Behaviour in Case of Grid Faults About 8 years ago, a requirement was made by a German transmission grid operator that in case of a short voltage drop a wind turbine should not be disconnected from the grid, but ride through the fault. This was in contrast to the former philosophy that in case of grid faults all wind turbines were to shut down immediately. Because of the high renewable energy penetration, especially during strong wind conditions in the north of Germany, it is possible that an otherwise harmless voltage drop may lead to a chain reaction. All wind turbines in the vicinity of a short circuit in the high or extra-high voltage system which are not riding through the fault, would be disconnected from the grid immediately after detecting the voltage drop and so contribute to the destabilisation of the grid. Shortly after the introduction of this requirement, DEWI carried out the first tests with a generator system [6]. Since then, the methods have changed. Today, voltage drops are normally simulated by a short-term activation of a voltage divider at medium voltage level. The requirements to be met by the generating plants for fault ride-through were also extended. In the grid codes now applicable [3], [1], [2] the wind turbines are required to produce high capacitive reactive power immediately after the voltage drop. Leistung erzeugt wird als zur gleichen Zeit von den Verbrauchern abgenommen wird. Im Normalzustand werden einige Kraftwerke so geregelt, dass die Leistungserzeugung und der Leistungsverbrauch immer im Gleichgewicht sind. Dann hat das Netz eine Frequenz von 50 Hz. Treten gravierende Fehler im Netz auf, kann sich das Netz in Teilnetze aufteilen, die dann wiederum für sich geregelt werden müssen. Hierbei kann es vorkommen, dass Teilnetze entstehen, in denen mehr Leistung erzeugt als verbraucht wird. Das ist z. B. im November 2006 passiert, als sich durch Überlastung eines Netzabschnittes das Netz in Europa in mehrere Teilnetze aufgeteilt hat, wobei im nördlichen und östlichen Teil kurzzeitig eine Überfrequenz durch zu hohe Leistungsproduktion entstand, die dann abgeregelt wurde. Da für die Überprüfung des Verhaltens der Windenergieanlagen nicht die tatsächliche Frequenz im Netz erhöht werden kann, gibt es folgende Vorgehensweisen: Die simulierte Netzfrequenz kann im einfachsten Fall als Summe aus der gemessenen Netzfrequenz und einer aufaddierten Überfrequenz in der Betriebsführung der Windenergieanlage gebildet werden. Der Prüfer kontrolliert diese Eingaben, siehe Abb. 3. Als ähnliche Variante kann der Parameter Nennfrequenz in der Steuerung abgesenkt werden, so dass die dann gemessene reale Netzfrequenz als Überfrequenz interpretiert wird. Eine etwas andere Möglichkeit ist, an den Eingangsklemmen der Frequenzmessung der Windenergieanlage einen Netzsimulator anzuschließen. Der Netzsimulator generiert überfrequente Spannungen, die von der Betriebsführung der Windenergieanlage erkannt und ausgewertet werden. Wiederzuschalten nach Spannungslosigkeit Da nach einem Netzausfall das Netz erst langsam wieder aufgebaut werden muss, dürfen Erzeugungsanlagen nicht unmittelbar nach Netzwiederkehr ihre volle Leistung einspeisen. Aus diesem Grund ist der Leistungsanstieg auf 10% der Nennleistung pro Minute begrenzt. Für die Überprüfung der Erzeugungseinheit wird ein Netzausfall durch Ausschalten des Mittelspannungsschalters simuliert und dann nach erneutem Einschalten der Erzeugungseinheit der Wirkleistungsanstieg gemessen und der Gradient des Anstiegs ermittelt. Weiterhin wird die Zeit ermittelt, die die Windenergieanlage oder die Erzeugungseinheit benötigt, bis sie wieder nach Spannungswiederkehr mit der Leistungsproduktion beginnt. Hierzu werden 3 unterschiedliche Spannungsausfälle simuliert mit 10 Sekunden, 1 Minute und 10 Minuten Spannungsausfallzeiten. Blindleistungsregelung 72 DEWI MAGAZIN NO. 36, FEBRUARY 2010
6 Werbung Kunde 1/1 s/w oder 4c PROMOTED BY THE MAGAZINE: THE BIGGEST WIND TURBINE MANUFACTURERS WILL BE EXHIBITING:
7 Fig. 5: Abb. 5: Testing the reactive power adjustment time. Überprüfung der Blindleistungseinstellzeit. The values of voltage change (deadband) as from which the turbine is meant to react, and of the reactive power as a function of the depth of the voltage dip (K factor) are determined when commissioning the wind turbine. During prototype testing the setting options and a limited number of different voltage dips are tested. The results of the measurements are also used as a basis for the validation of simulation models. By means of simulations a broad spectrum of possible grid faults then is verified for the whole wind farm. Outlook The introduction of the systems services guideline [3] has shown that a lot of technical details have to be taken into account when implementing the requirements and testing the behaviour of wind turbines. These details will be dealt with extensively in the next issues of DEWI Magazin. toren und in stark belasteten Leitungen entsteht. In den Regelwerken wird hier häufig von Blindleistungsbezug oder Blindleistungsverbrauch gesprochen. Zum Anderen spricht man von kapazitiver Blindleistung, die nur in schwach belasteten Leitungen (Kabelnetzen) entsteht. Häufig muss diese kapazitive Blindleistung durch Kompensationseinrichtungen oder Generatoren bereitgestellt werden, um die induktive Blindleistung zu kompensieren. Daher spricht man hier auch von Blindleistungserzeuger oder Blindleistungsproduktion. Induktive und kapazitive Blindleistung müssen immer im Gleichgewicht sein. Wenn Blindleistungserzeuger und Blindleistungsverbraucher weit voneinander entfernt sind, entsteht hierdurch ein zusätzlicher Stromfluss, der auch Wirkleistungsverluste hervorruft. Blindleistung hat daneben wesentlichen Einfluss auf die Spannungshöhe. Entsprechend den Anforderungen müssen Windenergieanlagen und alle anderen Erzeugungseinheiten in der Lage sein, sowohl induktive Blindleistung als auch kapazitive Blindleistung zu fahren. Hierbei kann die Vorgabe an die Windenergieanlage über einen festen oder variablen Sollwert erfolgen oder abhängig von der erzeugten Wirkleistung oder der herrschenden Spannung sein. Für die Überprüfung des Verhaltens der Windenergieanlage wird zunächst ermittelt, wie viel induktive und kapazitive Blindleistung die Erzeugungsanlage tatsächlich bereitstellen kann. Hierzu ist in Abb. 4 ein Beispiel gegeben. Weiterhin wird überprüft, wie genau die Blindleistung einem vorgegebenen Sollwert folgt und wie schnell sie diesem Sollwert folgt. Einschwingzeiten werden durch Bewertungen von Sprungantworten auf Sollwertänderungen ermittelt, siehe Abb. 5. Einstellgenauigkeiten werden aus Vergleich zu unterschiedlichen Sollwertvorgaben erkannt, siehe Abb. 6. Weiterhin zu berücksichtigen ist die Möglichkeit, Blindleistung über zusätzliche Komponenten, wie z. B. Statcoms außerhalb der Windenergieanlage zu erzeugen. Bei Windparks ist nur das Verhalten der Gesamtanlage, (der Erzeugungsanlage, EZA) von Interesse. 74 DEWI MAGAZIN NO. 36, FEBRUARY 2010
8 Fig. 6: Abb. 6: Testing the accuracy of adjustment of the reactive power. Die Q_Setcurve is compared with the reactive power measured Q_Measured. Überprüfung der Einstellgenauigkeit der Blindleistung. Die Sollwertkurve Q_Setcurve wird mit der gemessenen Blindleistung Q_Measured verglichen. Verhalten bei Spannungseinbrüchen im Netz Vor ca. 8 Jahren hat der erste deutsche Übertragungsnetzbetreiber gefordert, dass bei einem kurzen Spannungseinbruch eine Windenergieanlage nicht unmittelbar vom Netz getrennt werden soll, sondern diesen Netzfehler durchfahren soll. Dies stand im Gegensatz zu der bis dahin geltenden Philosophie, dass sich bei Netzstörungen alle Windenergieanlagen sofort vom Netzt zu trennen haben. Aufgrund des nennenswerten Anteils von regenerativer Energieproduktion, insbesondere bei starkem Wind im Norden Deutschlands, könnte es sein, dass eine Kettenreaktion aufgrund eines ansonsten harmlosen Spannungseinbruches entstehen könnte. Alle Windenergieanlagen nahe eines Kurzschlusses im Hoch- oder Höchstspannungsnetzes, die den Netzfehler nicht durchfahren, würden bei Erkennen des Spannungseinbruchs sofort vom Netz getrennt werden und damit die Stabilität des Netzes zusätzlich gefährden. Kurz nach Einführung der Forderung hat das DEWI dazu erste Tests an einem Generatorsystem durchgeführt [6]. Die Methoden haben sich seit dieser Zeit verändert. Heutzutage werden Spannungseinbrüche üblicherweise durch kurzzeitiges Aktivieren eines Spannungsteilers auf der Mittelspannungsebene simuliert. Aber auch die Anforderung an die Erzeugungsanlagen für das Durchfahren eines Spannungseinbruchs wurden erweitert. In den nun gültigen Gridcodes [3], [1], [2] wird unverzüglich nach Spannungsrückgang die Produktion von hohem kapazitiven Blindstrom gefordert. Ab welcher Spannungsänderung (Totband) die Windenergieanlage überhaupt reagieren soll, und mit welcher Blindleistung in Abhängigkeit der Spannungstiefe genau (K-Faktor), ist von der Windenergieanlage bei der Inbetriebnahme einzustellen. Während einer Prototypenvermessung werden die Einstellmöglichkeiten und eine begrenzte Anzahl von Spannungseinbruchtiefen geprüft. Ergebnisse der Messungen werden unter anderem auch als Grundlage für die Vali die rung von Simulationsmodellen verwendet. In Simulationen soll dann eine große Bandbreite von möglichen Netzfehlern am gesamten Windpark überprüft werden. Aussicht Die Einführung der SDL-Verordnung [3] hat gezeigt, dass bei der Umsetzung der Anforderungen aber auch bei der Überprüfung des Verhaltens von Windenergieanlagen und anderen Erzeugungsanlagen viele technische Details zu beachten sind. Diese Details wollen wir in weiteren Artikeln in den nächsten DEWI-Magazinen ausführlicher behandeln. Literatur / References: [1] Technische Richtlinie Erzeugungsanlagen am Mittelspannungsnetz Richtlinie für Anschluss und Parallelbetrieb von Erzeugungsanlagen am Mittelspannungsnetz Ausgabe Juni 2008, vom BDEW Bundesverband der Energie- und Wasserwirtschaft e.v. [2] TransmissionCode 2007, Netz- und Systemregeln der deutschen Übertragungsnetzbetreiber Version 1.1, vom Verband der Netzbetreiber - VDN e.v. beim VDEW, August 2007 [3] Verordnung zu Systemdienstleistungen durch Windenergieanlagen (SDLWindV) 3.Juli 2009 [4] IEC : Wind turbine generator systems Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines. Edition 2.0, [5] Technische Richtlinie für Erzeugungseinheiten, Teil 3: Bestimmung der Elektrischen Eigenschaften von Erzeugungseinheiten am Mittel-, Hoch- und Höchstspannungsnetz; Rev.20; Stand: ; Herausgeber: Fördergesellschaft Windenergie e.v. [6] F. Santjer, R. Klosse, Die neuen ergänzenden Netzanschlussregeln von E.ON Netz GmbH, DEWI Magazin, Nr. 22, 02/03 DEWI MAGAZIN NO. 36, FEBRUARY
Electrical tests on Bosch unit injectors
Valid for Bosch unit injectors with order numbers 0 414 700 / 0 414 701 / 0 414 702 Parts Kit Magnet*: - F00H.N37.925 - F00H.N37.933 - F00H.N37.934 * For allocation to the 10-place Bosch order number,
MehrCertificate of conformity Generating unit, NS-protection
Applicant: Product: Certificate of conformity Generating unit, NS-protection Schneider Electric Solar Inverters USA, Inc. 250 South Vasco Road Livermore, California 94551 USA Photovoltaic Inverter with
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Anlage zur Akkreditierungsurkunde D-ZE-12005-01-00 nach DIN EN ISO/IEC 17065:2013 Gültigkeitsdauer: 02.08.2017 bis 12.11.2019 Ausstellungsdatum: 02.08.2017 Urkundeninhaber:
MehrGrundbegriffe Leistungs- und Energiemesstechnik
Dieses Dokument beschreibt die Messwerte der Adamczewski-Geräte für Leistungs- und Energiemesstechnik. Es soll dem Kunden bei der Interpretation der Messwerte in der Parametriersoftware AD-Studio, bzw.
MehrCertificate of conformity Generating unit, NS-protection
Certificate of conformity Generating unit, NS-protection Applicant: Product: Schneider Electric Solar Inverters USA, Inc. 250 South Vasco Road Livermore, California 94551 USA Photovoltaic Inverter with
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Anlage zur Akkreditierungsurkunde D-ZE-12005-01-00 nach DIN EN ISO/IEC 17065:2013 Gültigkeitsdauer: 20.08.2018 bis 12.11.2019 Ausstellungsdatum: 20.08.2018 Urkundeninhaber:
MehrRev. Proc Information
Rev. Proc. 2006-32 Information 2006, CPAs 1 Table 1-Total loss of the home Table 2- Near total loss is water to the roofline. Completely gut the home from floor to rafters - wiring, plumbing, electrical
MehrVGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016
Overview The Hamburg Süd VGM Web portal is an application that enables you to submit VGM information directly to Hamburg Süd via our e-portal Web page. You can choose to enter VGM information directly,
MehrLeistungsgradient nach Spannungslosigkeit bei Verbrennungskraftmaschinen (VKM)
nach Spannungslosigkeit bei Verbrennungskraftmaschinen (VKM) Rainer Klosse, WindGuard Certification, Oldenburgerstr. 65, 26316 Varel, r.klosse@windguard.de, www.windguard-certification.de Version vom 21.6.213,
MehrTube Analyzer LogViewer 2.3
Tube Analyzer LogViewer 2.3 User Manual Stand: 25.9.2015 Seite 1 von 11 Name Company Date Designed by WKS 28.02.2013 1 st Checker 2 nd Checker Version history Version Author Changes Date 1.0 Created 19.06.2015
MehrDie Deutsche Akkreditierungsstelle GmbH bestätigt hiermit, dass die Zertifizierungsstelle
Akkreditierungsstelle Deutsche Akkreditierungsstelle GmbH Beliehene gemäß 8 Absatz 1 AkkStelleG i.v.m. 1 Absatz 1 AkkStelleGBV Unterzeichnerin der Multilateralen Abkommen von EA, ILAC und IAF zur gegenseitigen
MehrElectrical testing of Bosch common rail solenoid valve (MV) injectors
Applies to MV injector, generation: -CRI 1.0 / 2.0 / 2.1 / 2.2 -CRIN 1 / 2 / 3, with K oder AK plug Bosch 10-position order number Bosch-Bestellnummer CRI: 0 445 110 xxx Bosch-Bestellnummer CRIN: 0 445
MehrWeather forecast in Accra
Weather forecast in Accra Thursday Friday Saturday Sunday 30 C 31 C 29 C 28 C f = 9 5 c + 32 Temperature in Fahrenheit Temperature in Celsius 2 Converting Celsius to Fahrenheit f = 9 5 c + 32 tempc = 21
MehrONLINE LICENCE GENERATOR
Index Introduction... 2 Change language of the User Interface... 3 Menubar... 4 Sold Software... 5 Explanations of the choices:... 5 Call of a licence:... 7 Last query step... 9 Call multiple licenses:...
MehrElectrical testing of Bosch common rail piezo injectors
Applies to generation CRI 3: Bosch 10-position order number 0 445 115 = CRI 3-16 (CRI 3.0) 1600 bar 0 445 116 = CRI 3-18 (CRI 3.2) 1800 bar 0 445 117 = CRI 3-20 (CRI 3.3) 2000 bar Tools required: Hybrid
MehrThe impact of wind turbines on the behavior of the grid protection in consideration of the negative sequence interference
Presented at 0 3rd EEE PES SGT Europe, Berlin, Germany, October 4-7, 0 The impact of wind turbines on the behavior of the grid protection in consideration of the negative sequence interference Jörg Meyer,
MehrDynamic Hybrid Simulation
Dynamic Hybrid Simulation Comparison of different approaches in HEV-modeling GT-SUITE Conference 12. September 2012, Frankfurt/Main Institut für Verbrennungsmotoren und Kraftfahrwesen Universität Stuttgart
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Anlage zur Akkreditierungsurkunde D-ZE-12055-01-00 nach DIN EN ISO/IEC 17065:2013 Gültigkeitsdauer: 20.08.2018 bis 07.08.2021 Ausstellungsdatum: 20.08.2018 Urkundeninhaber:
MehrSchalten einer kapazitiven Last mit einem Transistor
. Schalten einer kapazitiven Last mit einem Transistor In allgemeinen technischen Anwendungen ist das Schalten einer kapazitiven Last eher von untergeordneter Bedeutung. In Rechnersystemen (Computernetzwerken)
MehrElectrical testing of Bosch common rail Injectors
Electrical testing of Bosch common rail Injectors Contents: 1. Adapter cable for Hybridtester FSA 050 (article number 0 684 010 050 / 1 687 023 571) 2. Electrical testing of Bosch common rail solenoid
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Anlage zur Akkreditierungsurkunde D-ZE-12055-01-00 nach DIN EN ISO/IEC 17065:2013 Gültigkeitsdauer: 08.08.2016 bis 07.08.2021 Ausstellungsdatum: 01.11.2016 Urkundeninhaber:
MehrMock Exam Behavioral Finance
Mock Exam Behavioral Finance For the following 4 questions you have 60 minutes. You may receive up to 60 points, i.e. on average you should spend about 1 minute per point. Please note: You may use a pocket
MehrVGM. VGM information. HAMBURG SÜD VGM WEB PORTAL - USER GUIDE June 2016
Overview The Hamburg Süd VGM-Portal is an application which enables to submit VGM information directly to Hamburg Süd via our e-portal web page. You can choose to insert VGM information directly, or download
MehrHazards and measures against hazards by implementation of safe pneumatic circuits
Application of EN ISO 13849-1 in electro-pneumatic control systems Hazards and measures against hazards by implementation of safe pneumatic circuits These examples of switching circuits are offered free
Mehra) Name and draw three typical input signals used in control technique.
12 minutes Page 1 LAST NAME FIRST NAME MATRIKEL-NO. Problem 1 (2 points each) a) Name and draw three typical input signals used in control technique. b) What is a weight function? c) Define the eigen value
MehrOverview thermostat/ temperature controller
Thermostat TR-238 The Thermostat TR-238 is a electronic two-level controller for controlling of and in climate control units and vehicles. Voltage range (12V): Voltage range (24V): Control range: Hystereses:
MehrDie neuen ergänzenden Netzanschlussregeln von E.ON Netz GmbH New Supplementary Regulations for Grid Connection by E.ON Netz GmbH
Die neuen ergänzenden Netzanschlussregeln von E.ON Netz GmbH New Supplementary Regulations for Grid Connection by E.ON Netz GmbH Fritz Santjer, Rainer Klosse, DEWI Einleitung Seit dem 01. Januar 2003 sind
MehrEINSPEISEMANAGEMENT: GRUNDLAGEN, ANALYSE- UND PROGNOSEMÖGLICHKEITEN
EWC WEATHER CONSULT EINSPEISEMANAGEMENT: GRUNDLAGEN, ANALYSE- UND PROGNOSEMÖGLICHKEITEN DAVID WÖLFLE 26. WINDENERGIETAGE, 08.11.2017 About Team Manager at EWC Weather Consult GmbH https://www.linkedin.com/in/david-woelfle/
MehrInternationale Energiewirtschaftstagung TU Wien 2015
Internationale Energiewirtschaftstagung TU Wien 2015 Techno-economic study of measures to increase the flexibility of decentralized cogeneration plants on a German chemical company Luis Plascencia, Dr.
MehrAkkreditierungsbereich des PL gültig ab: siehe Unterschrift Freigabe
Seite 1 von 5 Innerhalb der mit * gekennzeichneten Akkreditierungsbereiche ist dem Prüflaboratorium, ohne dass es einer vorherigen Information und Zustimmung der DAkkS bedarf, die Anwendung der hier aufgeführten
MehrAccelerating Information Technology Innovation
Accelerating Information Technology Innovation http://aiti.mit.edu Ghana Summer 2011 Lecture 05 Functions Weather forecast in Accra Thursday Friday Saturday Sunday 30 C 31 C 29 C 28 C f = 9 5 c + 32 Temperature
MehrDienstleistungsmanagement Übung 5
Dienstleistungsmanagement Übung 5 Univ.-Prof. Dr.-Ing. Wolfgang Maass Chair in Economics Information and Service Systems (ISS) Saarland University, Saarbrücken, Germany Besprechung Übungsblatt 4 Slide
MehrPrüfbericht Nr. / Test Report No: F (Edition 1)
Emission date: 22.01.2015 Page: 1 of 5 Prüfbericht Nr. / Test Report No: F4-44254-48401-01 (Edition 1) Auftraggeber Applicant Geräteart Type of equipment Typenbezeichnung Type designation Seriennummer
MehrAsynchronous Generators
Asynchronous Generators Source: ABB 1/21 2. Asynchronous Generators 1. Induction generator with squirrel cage rotor 2. Induction generator with woed rotor Source: electricaleasy.com 2/21 2.1. Induction
MehrA Classification of Partial Boolean Clones
A Classification of Partial Boolean Clones DIETLINDE LAU, KARSTEN SCHÖLZEL Universität Rostock, Institut für Mathematik 25th May 2010 c 2010 UNIVERSITÄT ROSTOCK MATHEMATISCH-NATURWISSENSCHAFTLICHE FAKULTÄT,
MehrWord-CRM-Upload-Button. User manual
Word-CRM-Upload-Button User manual Word-CRM-Upload for MS CRM 2011 Content 1. Preface... 3 2. Installation... 4 2.1. Requirements... 4 2.1.1. Clients... 4 2.2. Installation guidelines... 5 2.2.1. Client...
MehrFEM Isoparametric Concept
FEM Isoparametric Concept home/lehre/vl-mhs--e/folien/vorlesung/4_fem_isopara/cover_sheet.tex page of 25. p./25 Table of contents. Interpolation Functions for the Finite Elements 2. Finite Element Types
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Anlage zur Akkreditierungsurkunde D-ZE-12005-01-00 nach DIN EN ISO/IEC 17065:2013 Gültigkeitsdauer: 12.09.2016 bis 12.11.2019 Ausstellungsdatum: 12.09.2016 Urkundeninhaber:
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH Anlage zur Akkreditierungsurkunde D-ZE-17195-01-01 nach DIN EN ISO/IEC 17065:2013 Gültigkeitsdauer: 20.07.2016 bis 19.07.2021 Ausstellungsdatum: 20.07.2016 Urkundeninhaber:
MehrTest Report. Test of resitance to inertia effects of Zirkona Backwall. Sled Test (Frontal Impact) 20 g / 30 ms
Test Report Test of resitance to inertia effects of Zirkona Backwall Sled Test (Frontal Impact) 20 g / 30 ms This report serves solely as a documentation of test results. 93XS0002-00_TdC.doc Page 1 1.
MehrAnlage zur Akkreditierungsurkunde D-ZE nach DIN EN ISO/IEC 17065:2013
Deutsche Akkreditierungsstelle GmbH nach DIN EN ISO/IEC 17065:2013 Ausstellungsdatum: 19.10.2018 Urkundeninhaber: TÜV NORD CERT GmbH Langemarckstraße 20, 45141 Essen Zertifizierungen von Produkten, Prozessen
MehrAnhang Ⅰ zum Konformitätsnachweis Nr. S3M (Annex Ⅰ of the Certificate of Conformity No. S3M )
Integrated NS protection Anlagentyp: (Type of system:) Anlagenhersteller: (System manufacturer:) Messzeitraum: (Measuring period:) Wirkleistung: (Active power:) Blindleistungsbezug Reactive power reference
MehrWhere are we now? The administration building M 3. Voransicht
Let me show you around 9 von 26 Where are we now? The administration building M 3 12 von 26 Let me show you around Presenting your company 2 I M 5 Prepositions of place and movement There are many prepositions
MehrNumber of Maximal Partial Clones
Number of Maximal Partial Clones KARSTEN SCHÖLZEL Universität Rostoc, Institut für Mathemati 26th May 2010 c 2010 UNIVERSITÄT ROSTOCK MATHEMATISCH-NATURWISSENSCHAFTLICHE FAKULTÄT, INSTITUT FÜR MATHEMATIK
MehrFEM Isoparametric Concept
FEM Isoparametric Concept home/lehre/vl-mhs--e/cover_sheet.tex. p./26 Table of contents. Interpolation Functions for the Finite Elements 2. Finite Element Types 3. Geometry 4. Interpolation Approach Function
MehrLevel 2 German, 2013
91126 911260 2SUPERVISOR S Level 2 German, 2013 91126 Demonstrate understanding of a variety of written and / or visual German text(s) on familiar matters 9.30 am Monday 11 November 2013 Credits: Five
MehrBayesian Networks. Syntax Semantics Parametrized Distributions Inference in Bayesian Networks. Exact Inference. Approximate Inference
Syntax Semantics Parametrized Distributions Inference in Exact Inference Approximate Inference enumeration variable elimination stochastic simulation Markov Chain Monte Carlo (MCMC) 1 Includes many slides
MehrNEWSLETTER. FileDirector Version 2.5 Novelties. Filing system designer. Filing system in WinClient
Filing system designer FileDirector Version 2.5 Novelties FileDirector offers an easy way to design the filing system in WinClient. The filing system provides an Explorer-like structure in WinClient. The
MehrNewest Generation of the BS2 Corrosion/Warning and Measurement System
Newest Generation of the BS2 Corrosion/Warning and Measurement System BS2 System Description: BS2 CorroDec 2G is a cable and energyless system module range for detecting corrosion, humidity and prevailing
Mehrv+s Output Quelle: Schotter, Microeconomics, , S. 412f
The marginal cost function for a capacity-constrained firm At output levels that are lower than the firm s installed capacity of K, the marginal cost is merely the variable marginal cost of v. At higher
MehrSnap-in switch for switches PSE, MSM and MCS 30
Product manual Snap-in switch for switches PSE, MSM and MCS 30 CONTENTS 1. PRODUCT DESCRIPTION 2. DATA AND DIMENSIONAL DRAWINGS 2.1. Technical Data 2.2. Dimensions of PSE with a Mounting Diameter 19 mm
Mehrrot red braun brown rot red RS-8 rot red braun brown R S V~
Kleiner Ring 9 /Germany Phone: 0049 4122 / 977 381 Fax: 0049 4122 / 977 382 Sample connections: Feedback module with integrated detection of occupied tracks for the RS-feedback bus (Lenz Digital plus)
MehrMagic Figures. We note that in the example magic square the numbers 1 9 are used. All three rows (columns) have equal sum, called the magic number.
Magic Figures Introduction: This lesson builds on ideas from Magic Squares. Students are introduced to a wider collection of Magic Figures and consider constraints on the Magic Number associated with such
MehrField-Circuit Coupling for Mechatronic Systems: Some Trends and Techniques
Field-Circuit Coupling for Mechatronic Systems: Some Trends and Techniques Stefan Kurz Robert Bosch GmbH, Stuttgart Now with the University of the German Federal Armed Forces, Hamburg stefan.kurz@unibw-hamburg.de
MehrInstallationsanleitung / installation manual - DIMMbox
Inhalt / Content Funktionsbeschreibung... 2 Anschlusskonfigurationen... 3 Konstantspannung... 3 Konstantstrom... 3 Art der Steuerung... 4 Analogeingang... 4 Digital Addressable Lighting Interface (DALI):...
MehrSAMPLE EXAMINATION BOOKLET
S SAMPLE EXAMINATION BOOKLET New Zealand Scholarship German Time allowed: Three hours Total marks: 24 EXAMINATION BOOKLET Question ONE TWO Mark There are three questions. You should answer Question One
MehrZusatz zur Betriebsanleitung Addendum to the Operating Instructions
Drive Technology \ Drive Automation \ System Integration \ Services Zusatz zur Betriebsanleitung Addendum to the Operating Instructions Austausch von MOVIGEAR -S01 durch MOVIGEAR -DSC-B Replacing MOVIGEAR
MehrOperation Guide AFB 60. Zeiss - Str. 1 D-78083 Dauchingen
Operation Guide AFB 60 Zeiss - Str. 1 D-78083 Dauchingen PCB automation systems AFB 30/60/90 Die flexiblen Puffer der Baureihe AFB werden zwischen zwei Produktionslinien eingesetzt, um unterschiedliche
MehrAttention: Give your answers to problem 1 and problem 2 directly below the questions in the exam question sheet. ,and C = [ ].
Page 1 LAST NAME FIRST NAME MATRIKEL-NO. Attention: Give your answers to problem 1 and problem 2 directly below the questions in the exam question sheet. Problem 1 (15 points) a) (1 point) A system description
MehrTechnical integration of RES: First results from the E-Energy project RegModHarz. Berlin, 19. November 2010
Technical integration of RES: First results from the E-Energy project RegModHarz Berlin, 19. November 2010 Florian Schlögl IWES Berlin 15.12.2010 Introduction Manufacturing costs go down when electricity
MehrPELTIER-HOCHLEISTUNGSMODULE
Wolfgang Knap Gesellschaft m.b.h. & Co.KG A-113 Wien Lilienberggasse 13 Tel.: +43-1-43 8 12 Fax: +43-1-48 72 13 e-mail: info@knap.at http://www.knap.at PELTIER-HOCHLEISTUNGSMODULE Die Hochleistungsmodule
MehrISEA RWTH Aachen Electric Bus Simulation
ISEA RWTH Aachen Electric Bus Simulation Finding the Optimal Technical Configuration 05.04.2017 Fabian Meishner Lehrstuhl für Elektrochemische Energiewandlung und 1 Speichersystemtechnik Electric Bus Simulation
MehrUSBASIC SAFETY IN NUMBERS
USBASIC SAFETY IN NUMBERS #1.Current Normalisation Ropes Courses and Ropes Course Elements can conform to one or more of the following European Norms: -EN 362 Carabiner Norm -EN 795B Connector Norm -EN
MehrLVRT Low Voltage Ride-Through
LVRT Low Voltage Ride-Through J. Dirksen; DEWI GmbH, Wilhelmshaven English - Deutsch Introduction Grid stability and security of supply are two important aspects for energy supply. In order to avoid power
MehrDie Dokumentation kann auf einem angeschlossenen Sartorius Messwertdrucker erfolgen.
Q-App: USP V2 Bestimmung des Arbeitsbereiches von Waagen gem. USP Kapitel 41. Determination of the operating range of balances acc. USP Chapter 41. Beschreibung Diese Q-App ist zur Bestimmung des Arbeitsbereiches
MehrANALYSIS AND SIMULATION OF DISTRIBUTION GRIDS WITH PHOTOVOLTAICS
Diss. ETH No. 22001 ANALYSIS AND SIMULATION OF DISTRIBUTION GRIDS WITH PHOTOVOLTAICS A dissertation submitted to ETH ZURICH for the degree of Doctor of Sciences presented by CHRISTOF BUCHER ETH Zurich
MehrCABLE TESTER. Manual DN-14003
CABLE TESTER Manual DN-14003 Note: Please read and learn safety instructions before use or maintain the equipment This cable tester can t test any electrified product. 9V reduplicated battery is used in
MehrORION three-phase 2-250kVA
ORION three-phase 2-250kVA Orion stabilizers are available for different ranges of input voltage fluctuation. Standard models offer a double input connection so that with the same unit two different input
MehrRegelungen und Übergangsfristen für bestimmte Anforderungen in Ergänzung zur technischen Richtlinie:
BDEW Bundesverband der Energie- und Wasserwirtschaft e.v. Reinhardtstraße 32 10117 Berlin Regelungen und Übergangsfristen für bestimmte Anforderungen in Ergänzung zur technischen Richtlinie: Erzeugungsanlagen
MehrCleanroom Fog Generators Volcano VP 12 + VP 18
Cleanroom Fog Generators Volcano VP 12 + VP 18 Description & Functional Principle (Piezo Technology) Cleanrooms are dynamic systems. People and goods are constantly in motion. Further installations, production
MehrLevel 2 German, 2016
91126 911260 2SUPERVISOR S Level 2 German, 2016 91126 Demonstrate understanding of a variety of written and / or visual German texts on familiar matters 2.00 p.m. Tuesday 29 November 2016 Credits: Five
MehrWalter Buchmayr Ges.m.b.H.
Seite 1/10 Chapter Description Page 1 Advantages 3 2 Performance description 4 3 Settings 5 4 Options 6 5 Technical data 7 6 Pictures 8 http://members.aon.at/buchmayrgmbh e-mail: walter.buchmayr.gmbh@aon.at
MehrSupplementary material for Who never tells a lie? The following material is provided below, in the following order:
Supplementary material for Who never tells a lie? The following material is provided below, in the following order: Instructions and questionnaire used in the replication study (German, 2 pages) Instructions
MehrLevel 1 German, 2014
90886 908860 1SUPERVISOR S Level 1 German, 2014 90886 Demonstrate understanding of a variety of German texts on areas of most immediate relevance 9.30 am Wednesday 26 November 2014 Credits: Five Achievement
MehrMonitor VIS 3xx Kurzanleitung
Monitor VIS 3xx Kurzanleitung 19.08.08 Art. Nr. 22261 Inhalt: 1. Spezifikationen...2 2. Tastenfunktionen...2 3. Menüführung und Einstellungen...3 Technik nach Maß Wöhler Monitor VIS 3xx 1. Spezifikationen
MehrQuick Guide Home Network Mode
Quick Guide Home Network Mode English > 1 German > 3 About the Home Network Mode EN Tivizen Nano & iplug normally work on their own created networks (whose SSID starts with tivizentv or iplug ) in which
MehrCycling. and / or Trams
Cycling and / or Trams Experiences from Bern, Switzerland Roland Pfeiffer, Departement for cycling traffic, City of Bern Seite 1 A few words about Bern Seite 2 A few words about Bern Capital of Switzerland
MehrExercise (Part V) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1
Exercise (Part V) Notes: The exercise is based on Microsoft Dynamics CRM Online. For all screenshots: Copyright Microsoft Corporation. The sign ## is you personal number to be used in all exercises. All
MehrTobias Keller, ATPE / ABB Automation & Power World 2013 Netzstabilität in Kraftwerken Die heutigen Herausforderungen
Tobias Keller, ATPE / ABB Automation & Power World 2013 Netzstabilität in Kraftwerken Die heutigen Herausforderungen Netzstabilität Agenda Netzstabilität Die Herausforderung heute Netzfehlererkennung Fault-Ride-Through
Mehrasled3000 Dimmbarer High Power LED-Treiber
asled3000 Dimmbarer High Power LED-Treiber A1.20 01/07 Leistungsmerkmale asled3000 ist ein dimmbares Treibermodul zur Versorgung von Hochleistungs-LEDs beliebiger Lichtfarbe. Es kann bis zu 6 LEDs mit
MehrBosch Rexroth - The Drive & Control Company
Bosch Rexroth - The Drive & Control Company Alle Rechte bei Bosch Rexroth AG, auch für den Fall von Schutzrechtsanmeldungen. Jede Verfügungsbefugnis, wie Kopier- und Weitergaberecht, bei uns. 1 Case study
MehrCan I use an older device with a new GSD file? It is always the best to use the latest GSD file since this is downward compatible to older versions.
EUCHNER GmbH + Co. KG Postfach 10 01 52 D-70745 Leinfelden-Echterdingen MGB PROFINET You will require the corresponding GSD file in GSDML format in order to integrate the MGB system: GSDML-Vx.x-EUCHNER-MGB_xxxxxx-YYYYMMDD.xml
Mehr16.7 Hz - The Missing Link?
16.7 Hz - The Missing Link? Prof. István Erlich University of Duisburg-Essen Bremen, January 2014 Current Concept 2 Current Concept Offshore Onshore WP1 33 kv AC, 50 Hz WP-Plattform WP-Plattform 150 kv
Mehr[[ [ [ [[ Natur, Technik, Systeme. Test, Dezember Erstes Semester WI10. PV Panel und Kondensator
Natur, Technik, Systeme Test, Dezember 00 Erstes Semester WI0 Erlaubte Hilfsmittel: Bücher und persönlich verfasste Zusammenfassung. Rechen- und Schreibzeugs. Antworten müssen begründet und nachvollziehbar
Mehriid software tools QuickStartGuide iid USB base driver installation
iid software tools QuickStartGuide iid software tools USB base driver installation microsensys Nov 2016 Introduction / Einleitung This document describes in short form installation of the microsensys USB
MehrLukas Hydraulik GmbH Weinstraße 39 D Erlangen. Mr. Sauerbier. Lukas Hydraulik GmbH Weinstraße 39 D Erlangen. edraulic rescue equipment
Technical Report No. 028-7130 95685-050 of 22.02.2017 Client: Lukas Hydraulik GmbH Weinstraße 39 D-91058 Erlangen Mr. Sauerbier Manufacturing location: Lukas Hydraulik GmbH Weinstraße 39 D-91058 Erlangen
MehrLevel 1 German, 2016
90886 908860 1SUPERVISOR S Level 1 German, 2016 90886 Demonstrate understanding of a variety of German texts on areas of most immediate relevance 2.00 p.m. Wednesday 23 November 2016 Credits: Five Achievement
MehrWissenschaftliche Dienste. Sachstand. Payment of value added tax (VAT) (EZPWD-Anfrage ) 2016 Deutscher Bundestag WD /16
Payment of value added tax (VAT) (EZPWD-Anfrage ) 2016 Deutscher Bundestag Seite 2 Payment of value added tax (VAT) (EZPWD-Anfrage ) Aktenzeichen: Abschluss der Arbeit: 07.04.2016 Fachbereich: WD 4: Haushalt
Mehrauf differentiellen Leitungen
Eingebettete Taktübertragung auf differentiellen Leitungen Johannes Reichart Kleinheubacher Tagung Miltenberg, 28.09.2009 Institut für Prof. Elektrische Dr.-Ing. und Optische Manfred Nachrichtentechnik
MehrFundamentals of Electrical Engineering 1 Grundlagen der Elektrotechnik 1
Fundamentals of Electrical Engineering 1 Grundlagen der Elektrotechnik 1 Chapter: Operational Amplifiers / Operationsverstärker Michael E. Auer Source of figures: Alexander/Sadiku: Fundamentals of Electric
MehrNOREA Sprachführer Norwegisch: Ein lustbetonter Sprachkurs zum Selbstlernen (German Edition)
NOREA Sprachführer Norwegisch: Ein lustbetonter Sprachkurs zum Selbstlernen (German Edition) Click here if your download doesn"t start automatically NOREA Sprachführer Norwegisch: Ein lustbetonter Sprachkurs
MehrConnecting the dots on Germany s Energiewende and its impact on European energy policy
Connecting the dots on Germany s Energiewende and its impact on European energy policy Rebecca Bertram Heinrich Böll Foundation Heinrich-Böll-Stiftung Schumannstraße 8 Telefon 030.285 34-0 Die grüne politische
MehrEx-Barriere für Diagnoseeinheit SITRANS DA400 / Ex-barrier for diagnostics unit SITRANS DA400 7MJ2010-1AA 0032
Ex-Barriere für Diagnoseeinheit SITRANS DA400 / Ex-barrier for diagnostics unit SITRANS DA400 7MJ2010-1AA 0032 Warnung Elektrischer Anschluss in explosionsgefährdeten Bereichen Anschluss und Inbetriebnahme
MehrDie Bedeutung neurowissenschaftlicher Erkenntnisse für die Werbung (German Edition)
Die Bedeutung neurowissenschaftlicher Erkenntnisse für die Werbung (German Edition) Lisa Johann Click here if your download doesn"t start automatically Download and Read Free Online Die Bedeutung neurowissenschaftlicher
MehrTaxation in Austria - Keypoints. CONFIDA Klagenfurt Steuerberatungsgesellschaft m.b.h
Taxation in Austria - Keypoints 1 CONFIDA TAX AUDIT CONSULTING Our history: Founded in 1977 Currently about 200 employees Member of International Association of independent accounting firms since1994 Our
MehrExercise (Part XI) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1
Exercise (Part XI) Notes: The exercise is based on Microsoft Dynamics CRM Online. For all screenshots: Copyright Microsoft Corporation. The sign ## is you personal number to be used in all exercises. All
MehrProduktinformation Access-Gateway. Product information Access gateway AGW 670-0
Produktinformation Access-Gateway Product information Access gateway AGW 670-0 1 2 3 4 2 Deutsch Anwendung Access-Gateway zur physikalischen Trennung von 2 Netzwerken an einem Access-Server. Durch den
MehrABB i-bus EIB. EIB Power Supply Units
ABB i-bus EIB EIB Power Supply Units Product Range Overview EIB Power Supplies ABB STOTZ-KONTAKT GmbH, 2002 - SK 029 F 02 E Product Range Overview EIB Power Supplies! EIB Power Supply, 320 ma SV/S 30.320.5!
MehrEin Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten. Click here if your download doesn"t start automatically
Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten Click here if your download doesn"t start automatically Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten Ein Stern in dunkler
MehrProduktdifferenzierung und Markteintritte?
6.2.1 (3) Produktdifferenzierung und Markteintritte? Um die Auswirkungen von Produktdifferenzierung im hier verfolgten Modell analysieren zu können, sei die Nachfragefunktion wie von Dixit 66 vorgeschlagen,
Mehr