1 Status of Offshore Wind Power - An Up-to-date Overview Stand der Offshore-Windenergienutzung - Ein aktueller Überblick B. Neddermann; DEWI Wilhelmshaven English - Deutsch Offshore wind power is increasingly gaining in importance. The world-wide installed offshore capa city has grown to around 4,000 MW in the last twenty years. This value will be more than doubled already in the next two years, because never before so many projects have been in the realization phase as in This contribution gives an up-to-date overview of the offshore wind farms which are currently under construction or in preparation for construction. Besides the situation in Germany, the status in other European coastal states is also described. Offshore Wind Power in Germany Until the end of June 2012 the responsible Federal Maritime and Hydrographic Agency of Germany (BSH) approved a total of 24 offshore wind farms (OWF) in the Exclusive Economic Zone (EEZ) in the German North Sea and 3 OWF in the Baltic Sea. Furthermore, two projects each in the coastal waters (12-nautical mile zone) of the North Sea and the Baltic Sea have been approved (Fig. 1). Thus, the way is princi pally cleared for construction and operation of more than 2,000 wind turbines off the German coast. The lion s share of the approvals was granted already in the period However, only two OWF, the offshore test site Die Offshore-Windenergienutzung gewinnt zunehmend an Bedeutung. In den letzten zwanzig Jahren ist die weltweit installierte Offshore-Gesamtleistung auf gut MW angewachsen. Dieser Wert wird sich bereits in den nächsten zwei Jahren mehr als verdoppeln, denn nie zuvor waren so viele Projekte in der Realisierung wie in In diesem Beitrag wird ein Überblick zum aktuellen Stand der in Bau und Bauvorbereitung befindlichen Offshore-Windparks gegeben. Neben der Situation in Deutschland wird auch der Status in anderen europäischen Küstenländern dargestellt. Offshore-Windenergienutzung in Deutschland Bis Ende Juni 2012 hat das zuständige Bundesamt für Seeschifffahrt und Hydrographie in der Ausschließlichen Wirtschafts zone (AWZ) insgesamt 24 Offshore-Windparks (OWP) in der deutschen Nordsee und 3 OWP in der Ostsee genehmigt. Darüber hinaus verfügen je zwei Projekte in der 12 Seemeilen-Zone von Nord- und Ostsee über eine Geneh migung (Abb. 1). Grundsätzlich ist damit der Weg frei für den Bau und Betrieb von mehr als Windenergieanlagen (WEA) vor den deut schen Küsten. Ein Großteil der Geneh migungen wurde bereits erteilt. Dennoch sind mit dem Offshore-Testfeld Alpha Ventus in der AWZ der DEWI MAGAZIN NO. 41, AUGUST

2 Sandbank24 Nördlicher Grund DanTysk Butendiek GlobalTech I Albatros EnBW Hohe See EnBW He dreiht Bard Offshore 1 Veja Mate Deutsche Bucht FINO 3 Met Mast Amrumbank West Nordsee Ost Meerwind Süd / Ost BSH = Federal Maritime and Hydrographic Agency FINO 1 EEZ = Exclusive Economic Zone Fig. 1: Abb. 1: Planned and approved offshore wind farms in the German North Sea Geplante und genehmigte Offshore-Windparks in der deutschen Nordsee Borkum Riffgrund West Borkum West II MEG Offshore I Alpha Ventus (2010) Borkum Riffgrund 2 Borkum Riffgrund Source: BSH / DEWI - Status Riffgat Nordergründe Gode Wind II Gode Wind Delta Nordsee I / II Innogy Nordsee 1 Offshore-Wind Measurement Project approved in the EEZ Project approved in Coastal Waters Alpha Ventus in the EEZ of the North Sea (12 WTGS / 60 MW) and EnBW Baltic 1 (21 WTGS / 48.3 MW) in the 12 sm zone of the Baltic Sea, are completely operatio nal so far. Due to the great distance from the coast of the planned offshore wind farms, the realization of the grid con nection in the German North Sea is a special challenge. The responsible transmission system opera tor TenneT has already ordered grid connections for an offshore wind power capacity of 5,500 mega watts und therefore made investments of nearly six billion Euros. However, in view of the multitude of other planned projects, considerable additional investments are required. The realization of the high voltage direct current (HVDC) transmission technology means to break new ground to some extent, and there are only few companies on the market, which offer the required grid technology. Furthermore, some problems occurred in the construction of the converter platforms for the ordered grid connections. That is why deferments for the supply of the grid connection of the respective projects are to be expected. In view of the existing challenges, the Federal Ministry of Economics and the Federal Ministry for the Environment have developed a proposal for the regulation of the liability limitation in July 2012 in or der to establish reliable frame conditions. The proposal aims to regulate the compensation if the grid connection cannot be completed in time or if a long-term breakdown of the grid occurs. Furthermore it was decided to introduce a special offshore grid development schedule for the grid connection of the German offshore wind farms. The planned legal regulations aim to avoid deferments and blocka des respectively in terms of upcoming investment decisions of the involved offshore companies. Despite the current problems and the deferments that have already occurrred, the advancement of the German offshore wind power is unmistakable. Thus, in 2012 alone Nordsee (12 WEA / 60 MW) und EnBW Baltic 1 (21 WEA / 48,3 MW) in der 12 sm-zone der Ostsee bisher erst zwei OWP vollständig in Betrieb. Aufgrund der großen Küstenentfernung der geplanten Offshore-Windparks stellt die Realisierung der Netzanbindung in der deutschen Nordsee eine besondere Herausforderung dar. Der verantwortliche Übertragungsnetzbetreiber TenneT hat bereits für eine Offshore-Windenergie-Leistung von Megawatt Netz anbindungen in Auftrag gegeben und hierfür fast sechs Milliarden Euro investiert. Angesichts der Vielzahl an weiteren Planungen sind jedoch erhebliche zusätzliche Investitionen erfor derlich. Bei der Realisierung der Hochspannungs-Gleichstrom-Übertragung (HGÜ)-Techno logie wird teilweise Neuland betreten, und es gibt am Markt nur wenige Unternehmen, die die erforderliche Netztechnik anbieten. Zudem sind bei den beauf tragten Netzanbin dungen teilweise Probleme beim Bau der Kon verter-plattformen aufgetreten, sodass bei den betroffenen Vorhaben Verzögerungen für die Bereitstellung der Netz anbin dung zu befürchten sind. Um angesichts der bestehenden Herausforderungen verlässliche Rahmenbedingungen zu schaffen, haben das Bundes wirtschaftsministerium und das Bundesumweltministerium im Juli 2012 einen Vorschlag für eine Haftungsregelung entwickelt, die den Schadenersatz bei nicht rechtzeitiger Anbindung oder längerer Störung des Netzes regeln soll. Da rüber hinaus wurde beschlossen, einen gesonderten Offshore-Netzentwicklungsplan für die Netzanbindung der deutschen Offshore-Windparks einzuführen. Mit einer ge plan ten gesetzlichen Regelung sollen Verzögerungen bzw. Blockaden bei anstehenden Investitionsentscheidungen der beteiligten Offshore-Unternehmen vermieden werden. Trotz der bereits entstandenen Verzögerungen und der ak tuellen Probleme ist ein Fortschritt bei der deutschen Offshore-Windenergienutzung unverkennbar. So sollen in 2012 gleich sieben Offshore-Windparks in der Nordsee und 34 DEWI MAGAZIN NO. 41, AUGUST 2012

3 seven offshore wind farms in the North Sea and another project in the Baltic Sea shall be realized at once. Three projects are already under construction and for five projects the start of offshore construction is scheduled in the next months. After completion in 2013/14, 438 additional wind turbines with 1,979.2 MW in the North Sea and further 80 WTGS with 288 MW in the Baltic Sea will be installed. Tab. 1 gives an overview of the offshore wind farms which are currently under construction and in preparation of construction in the North Sea and the Baltic Sea. Fig. 2 shows the grid connection projects in the German North Sea. In the following, the current status of the respective offshore wind farms is described in brief. NORTH SEA Coastal waters Riffgat The OWF Riffgat has been under construction since June 2012 und is situated around 15 km northwest of Borkum within the coastal waters of Lower Saxony. Until the end of July, half of the used monopiles were already installed. The project comprises 30 wind turbines of the type Siemens SWT with a total rated power of 108 MW. Completion of the offshore wind farm is scheduled for summer The grid connection for OWF Riffgat is realized by a 155 kv alternation current (AC)- single connec tion that feeds into the 220 kv-grid at the transformer station in Emden- Borssum. The submarine power cable line from the offshore substation to the coastal access point near Greetsiel has a length of around 50 km, the onshore cable line to the transformer station in Emden-Borssum spans another 30 km. The grid connection is under construction since July 2011 and is scheduled to be ready by spring Cluster DolWin Borkum West II Start of construction of the first phase of extension of the Trianel wind farm Borkum West II, with at first 40 of 80 planned WTGS of the type Areva Wind M5000, was on September 1 st, Within six months a total of 120 piles for the mounting of the tripod foundations could be driven into the sea ground. The project Borkum West II will be realised 45 km north of Borkum. In June 2012, Trianel reported that the commissioning of the first extension phase with a capacity of 200 MW will be deferred to the second quarter of 2013due to delays in the grid connection and the production of substation and foundations. However, tripods as well as substation of the OWF shall be installed still within 2012, as the respective installation time slots have been contractually secured, according to Trianel. The grid connection DolWin 1 for the OWF Borkum West II is under construction since March 2011 und is carried out by a high voltage direct current (HVDC) transmission. The cable line compri ses 75 km submarine cable and 90 km onshore cable to the feed-in into the 380 kv-transmission grid at the transformer station Dörpen/West. Completion of the grid connection was originally scheduled for spring 2013, but will probably be delayed (see above). ein weiteres Vorhaben in der Ostsee realisiert wer den. Drei Projekte sind bereits im Bau, bei fünf weiteren Vorhaben ist der Baubeginn auf See in den nächsten Monaten geplant. Nach der Fertigstellung 2013/14 werden in der Nordsee 438 zusätzliche WEA mit 1.979,2 MW und in der Ostsee weitere 80 WEA mit 288 MW installiert sein. Tab. 1 gibt einen Überblick zu den aktuell in Nord- und Ostsee im Bau bzw. in der Bauvorbereitung befindlichen Offshore-Windparks. Abb. 2 veranschaulicht die Vorhaben zur Netzanbindung in der deutschen Nordsee. Im Folgenden wird der aktuelle Status für die einzelnen Offshore-Windpark projekte kurz dargestellt. NORDSEE 12 Seemeilen-Zone Riffgat Der OWP Riffgat ist seit Juni 2012 im Bau und entsteht rund 15 km nordwestlich von Borkum in der 12 Seemeilen- Zone vor der niedersächsischen Nordseeküste. Bis Ende Juli konnte bereits die Hälfte der eingesetzten Monopiles installiert werden, das Projekt umfasst insgesamt 30 Wind energieanla gen des Typs Siemens SWT mit einer Gesamtleis tung von 108 MW. Die Fertigstellung des Off shore-windparks soll bis Sommer 2013 erfolgen. Der Netzanschluss für den OWP Riffgat wird als 155 kv Drehstrom-Einzelanbindung realisiert, die im Umspannwerk (UW) Emden-Borssum in das 220 kv-netz einspeist. Die Seekabeltrasse von der UW-Plattform auf See bis zum An lan depunkt bei Greetsiel hat eine Länge von rund 50 km, die Land kabeltrasse bis zum UW Emden-Borssum erstreckt sich über weitere 30 km. Die Netzanbindung ist seit Juli 2011 im Bau und soll bis Frühjahr 2013 fertiggestellt werden. Cluster DolWin Borkum West II Baubeginn für die erste Ausbauphase des Trianel Windparks Borkum West II mit zunächst 40 von insgesamt 80 geplanten WEA vom Typ Areva Wind M5000 war am 1. September Innerhalb von sechs Monaten konnten insgesamt 120 Pfähle zur Befestigung der Tripod-Fundamente in den Meeresboden gerammt werden. Das Projekt Borkum West II wird 45 km nördlich von Borkum realisiert. Im Juni 2012 berichtete Trianel, dass sich die Inbetriebnahme der ersten Ausbauphase mit einer Leis tung von 200 MW aufgrund von Verzögerungen beim Netzanschluss sowie bei der Fertigung von UW-Plattform und Fundamenten bis zum 2. Quartal 2013 verschieben werde. Sowohl die Tripods als auch das OWP-Umspannwerk sollen dennoch in 2012 installiert werden, die entsprechenden Errichtungs zeitfenster mit den Installationsunternehmen sind nach Angaben von Trianel vertraglich gesichert. Die Netzanbindung DolWin 1 für den OWP Borkum West II ist seit März 2011 im Bau und erfolgt als Hochspannungs- Gleichstromübertragung. Die Kabeltrasse umfasst 75 km Seekabel und 90 km Landkabel bis zur Einspeisung in das 380 kv-übertragungsnetz im UW Dörpen/West. Die Fertigstellung der Netzanbindung war ursprünglich bis zum Frühjahr 2013 geplant, wird sich aber voraus sichtlich verzögern (s.o.). DEWI MAGAZIN NO. 41, AUGUST

4 Area Cluster Project Capacity Wind turbine type Foundation type 12 sm-zone Riffgat 108 MW 30 Siemens SWT Monopile DolWin Borkum West II 200 MW 40 Areva Wind M5000 Tripod NORTH SEA BorWin Bard Offshore 1* 400 MW 80 Bard 5.0 Tripile Global Tech I 400 MW 80 Areva Wind M5000 Tripod Tab. 1: Tab. 1: Overview of the German offshore wind farms under construction and with start of construction in 2012 respectively Übersicht zu den deutschen Offshore-Windparks, die bereits im Bau sind bzw. mit geplantem Baubeginn in 2012 Nordsee Ost MW 48 Repower 6M Jacket HelWin Meerwind 288 MW 80 Siemens SWT Monopile SylWin DanTysk 288 MW 80 Siemens SWT Monopile BALTIC SEA EnBW Baltic MW 80 Siemens SWT Monopile / Jacket 2,267.2 MW *partially operational 518 Wind turbines Fig. 2: Abb. 2: Offshore grid connection projects in the North Sea (Source: TenneT Offshore, 04/2012) Projekte zur Offshore-Netzanbindung in der Nordsee (Quelle: TenneT Offshore, 04/2012) Cluster BorWin Bard Offshore 1 In the project Bard Offshore 1, 80 Bard 5.0 with a total capacity of 400 MW are already under construction since March 2010, around 100 km northwest of Borkum. Deferments have occurred again and again within the construction works. Until the middle of 2012, 62 tripile foundations were completed and 16 wind turbines were operational. Furthermore, another eight machines were installed completely and 23 WTGS were installed without rotor. Commissioning of Bard Offshore 1 is scheduled to be completed by the turn of the year 2013/14. The grid connection BorWin 1 was carried out by a HVDC connection for the transmission of 400 MW from OWF Bard Offshore 1 and is available since autumn The cable line from the offshore converter platform to the onshore converter station at the transformer station in Diele consists of 125 km submarine cable and 75 km onshore cable. Cluster BorWin Bard Offshore 1 Im Projekt Bard Offshore 1 sind rund 100 km nordwestlich von Borkum bereits seit März 2010 ins gesamt 80 Bard 5.0 mit einer Gesamtleistung von 400 MW im Bau. Bei der Errichtung ist es seit dem Baubeginn immer wieder zu Verzö ge rungen gekommen. Zur Jahresmitte 2012 waren 62 Tri pile-fundamente fertiggestellt und 16 Windener gie an lagen am Netz. Darüber hinaus konnten bis Ende Juni acht wei tere Anlagen vollständig sowie 23 WEA ohne Rotor er richtet werden. Die vollständige Inbetriebnahme von Bard Offshore 1 ist zum Jahreswechsel 2013/14 geplant. Die Netzanbindung BorWin 1 wurde als HGÜ-Verbindung zur Übertragung von 400 MW aus dem OWP Bard Offshore 1 realisiert und steht seit Herbst 2009 zur Verfügung. Die Kabelverbindung von der Offshore-Konverter-Plattform bis zur Konverterstation an Land im UW Diele ist unterteilt in 125 km Seekabel und 75 km Landkabel. 36 DEWI MAGAZIN NO. 41, AUGUST 2012

5 Global Tech I Der Bau des OWP Global Tech I soll im Sommer 2012 mit der Verschiffung der Fundamente starten. Bei dem Vor haben ist die Errichtung von 80 Anlagen des Typs Areva Wind M5000 ca. 93 km nord westlich von Juist geplant. Als Gründungsstruktur kommen Tripod-Fundamente zum Einsatz. Das 400 MW-Projekt Global Tech I soll im Rahmen des Netz anbindungsprojektes BorWin 2 ange schlossen werden. Das Vorhaben ist seit Mai 2011 im Bau und umfasst eine HGÜ-Verbindung zur Übertragung von insgesamt 800 MW. Die Kabeltrasse verläuft wie beim Projekt BorWin 1 über ein 125 km langes Seekabel und ein Landkabel mit 75 km Länge bis zur Konverterstation an Land im UW Diele. Im Juni 2012 bestätigte der zuständige Über tragungs netz be treiber TenneT, dass es bei der Installation der Konverter-Plattform BorWin beta Verzögerungen geben wird. Die ursprünglich für das Frühjahr 2013 geplante Fertigstellung der Netzanbindung wird nun für 2014 erwartet. Cluster HelWin Nordsee Ost Der Bau des OWP Nordsee Ost ist ab Sommer 2012 etwa 35 km nördlich von Helgoland vorgese hen. 48 Repower 6M-Anlagen mit einer Gesamtleistung von 295,2 MW sollen errichtet werden, als Gründungsstruktur werden Jacket- Fundamente eingesetzt. Meerwind Der Baubeginn für das Projekt Meerwind soll im September 2012 erfolgen. Das Vorhaben umfasst die Errichtung von jeweils 40 WEA vom Typ Siemens SWT in den Teilbereichen Meerwind Ost und Meerwind Süd mit einer Gesamtleistung von 288 MW. Die Windenergieanlagen werden auf Monopile-Fundamenten installiert. Der Off shore- Standort liegt ca. 23 km nördlich von Helgoland. Die Offshore-Windparks Nordsee Ost und Meerwind sol len im Rahmen des Netzanbindungs projektes HelWin1 an geschlossen werden. Das Vorhaben ist seit Juli 2011 im Bau und umfasst eine HGÜ-Verbindung zur Übertragung von 576 MW. Die Kabeltrasse führt über ein 85 km langes See kabel und 45 km Landkabel bis zur Konverterstation an Land im UW Büttel in Schleswig-Holstein. Im Juni 2012 meldete der zuständige Übertragungsnetzbetreiber TenneT, dass es auch bei der Installa tion der Konverter-Plattform HelWin alpha Verzögerungen geben wird. Die Fer tigstellung wird nun für 2014 erwartet. Ursprünglich sollte die Netzanbindung bis zum Frühjahr 2013 realisiert werden. Cluster SylWin DanTysk Der Baubeginn für den Offshore-Windpark DanTysk ist im Dezember 2012 vorgesehen. 80 Siemens SWT mit einer Gesamtleistung von 288 MW sollen 70 km westlich von Sylt auf Monopile-Fundamenten errichtet werden. DanTysk wird über die HGÜ-Netzanbindung SylWin1 angeschlossen, die seit Juli 2011 im Bau ist und eine Ge samt leistung von 864 MW übertragen kann. Die Trasse führt über eine 160 km Seekabel- und 45 km Landkabel-Verbindung zum UW Büttel. SylWin 1 soll bis zum Früh jahr 2014 fertiggestellt werden. Condition Monitoring Einfach Intelligent DEHNrecord SCM XT Monitoring von Blitz- und Überspannungsschutz - Optimale Lösung für maximal 10 Schutzgeräte - Drahtlose Zustandserkennung ohne zusätzliche Verdrahtung und Spannungsversorgung der Schutzgeräte - Einfachste Integration selbst in bestehenden Anlagen - Auch einsetzbar für Schutzgeräte in Ex(i)- oder SIL-Kreisen Für mehr Informationen: Besuchen Sie DEHN auf der HUSUM WindEnergy Halle 3 / Stand 3F06 DEHN schützt. Überspannungsschutz, Blitzschutz / Erdung, Arbeitsschutz DEHN + SÖHNE GmbH + Co.KG. Postfach 1640, Neumarkt, Germany Tel , info@dehn.de Anz C.Monit.SCM_DEWI Mag_Wind_Ende Aug._85x258.indd :05 DEWI MAGAZIN NO. 41, AUGUST

6 Global Tech I The construction of OWF Global Tech I is scheduled to start in summer 2012 with the shipment of the foundations. For this project, situated at approx. 93 km northwest of Juist, 80 WTGS of the type Areva Wind M5000 are planned to be erected. The type of foundation used will be tripods. The 400 MW project Global Tech I is going to be connected to the supply grid within the grid connection project BorWin 2. This project has been under construction since May 2011 and includes a HVDC connection for the transmission of 800 MW. As in the project BorWin 1 the cable line consists of a 125 km long submarine cable and a 75 km onshore cable to the Diele transformer station. In June 2012 the responsible transmission system operator TenneT confirmed that the installation of the converter platform BorWin beta will be delayed. The completion of the grid connection originally scheduled for spring 2013 is now expected for Cluster HelWin Nordsee Ost The construction of OWF Nordsee Ost is scheduled to start in summer 2012 approx. 35 km north of Heligoland. 48 Repower 6M wind turbines with a total installed capacity of MW are to be erected, the support structures used will be jacket foundations. Meerwind The start of construction for the Meerwind project is expected for September The OWF will comprise 40 WTGS of the type Siemens SWT in the sections Meerwind Ost and Meerwind Süd with a total installed capacity of 288 MW. The WTGS will be installed on monopole foundations. The site of the OWF is approx. 23 km north of Heligoland. The offshore wind farms Nordsee Ost and Meerwind will be connected via the grid connection project HelWin1. The project has been under construction since July 2011 and includes a HVDC connection for the transmission of 576 MW. The cable line consists of a submarine cable of 85 km length and an onshore cable leading to the Büttel transformer station in Schleswig-Holstein. In June 2012 the responsible transmission system operator TenneT confirmed that the installation of the converter platform HelWin alpha will also be delayed. Completion of the grid connection is now expected for Initially, the grid connection was scheduled to be realized by spring Cluster SylWin DanTysk Construction work for the offshore wind farm DanTysk is expected to start in December Siemens SWT with a total installed power of 288 MW are to be erected on monopile foundations 70 km west of Sylt. DanTysk will be connected to the German power grid via the connection SylWin1, under construction since July 2011 and capable of transmitting 864 MW. The cable line includes 160 km of submarine cable and a 45 km onshore cable to the Büttel transformer station. SylWin 1 is expected to be completed by spring OSTSEE EnBW Baltic 2 In der Ostsee soll im Sommer 2012 der Baubeginn für den OWP EnBW Baltic 2 erfolgen. Das ursprünglich als Kriegers Flak bezeichnete Projekt wird 32 km nördlich von Rügen realisiert. 80 Siemens SWT mit einer Ge samtleistung von 288 MW kommen zum Einsatz. Die Grün dung er folgt mit Monopiles und an den Anlagenstandorten mit einer Wassertiefe ab ca. 33 m mit Jacket-Fundamenten. Die Netzanbindung erfolgt auf 150 kv-ebene über ein 120 km langes Seekabel und ein 16 km langes Landkabel, das bis zum Verknüpfungspunkt im UW Bentwisch in Meck len burg- Vorpommern reicht. Fertigstellung und Inbetrieb nah me von EnBW Baltic 2 sind in 2013 geplant. Stand der internationalen Offshore-Windenergienutzung Auch in anderen europäischen Ländern sind in diesem Jahr zahlreiche Offshore-Windparks im Bau. Ein Großteil der Aktivitäten erfolgt in Großbritannien, wo derzeit bereits rund die Hälfte der weltweit installierten Offshore-Windener gieleistung in Betrieb ist. Wie der nachfolgende Überblick zeigt, sind aktuell aber auch in Belgien und in Dänemark Offshore-Windparks im Bau. Großbritannien In Großbritannien sind in 2012 bereits die OWP Ormonde (150 MW, 30 Repower 5M) und Walney 2 (183,6 MW, 51 Siemens SWT ) in Betrieb gegangen. Sechs weitere Offshore-Windparks sind derzeit im Bau, die in Summe eine Leis tung von mehr als MW erreichen. Sämtliche Stand orte befinden sich im küsten nahen Bereich innerhalb oder knapp außerhalb der 12 Seemeilen-Zone mit vergleichsweise geringen Wassertiefen, die den Einsatz von Monopile-Fundamenten und eine Dreh strom-netzanbindung ermöglichen. Es ist bemerkens wert, dass alle 665 Windenergieanlagen, die momentan in Großbritannien im Bau sind, von Siemens gelie fert werden. Dabei kommen Anlagen mit einer Nennleistung von 3,6 MW zum Einsatz, überwiegend mit 120 m Rotordurchmesser. Eine Ausnahme bildet der OWP Teesside, der mit 2,3 MW-Anlagen realisiert wird. Im OWP Greater Gabbard wurden die 140 WEA des Typs Siemens SWT komplett errichtet und sind zu großen Teilen auch bereits am Netz. Mit einer Gesamtleistung von 504 MW wird Grea ter Gabbard damit voraussichtlich noch 2012 als weltweit größter Offshore-Windpark vollständig in Betrieb gehen. Beim OWP Sheringham Shoal sind ebenfalls bereits alle 88 Siemens SWT installiert. Folg lich ist auch bei diesem Großprojekt noch in 2012 die vollständige Inbetriebnah me von insgesamt 316,8 MW zu erwarten. Beim Projekt Lincs waren zur Jahresmitte 2012 alle Monopiles errichtet, sodass die Installation der 75 Siemens SWT erfolgen kann. Die Leistung des Offshore-Windparks beträgt 270 MW. Der OWP Teesside ist mit 27 Anlagen des Typs Siemens SWT und einer Gesamtleistung von 62,1 MW relativ klein. Auch bei diesem Projekt waren zur Jahresmitte 2012 bereits sämtliche Mono piles installiert, sodass die Fertig 38 DEWI MAGAZIN NO. 41, AUGUST 2012

7 Fig. 3: Abb. 3: Overview of the locations of offshore wind farms under construction in other European countries Übersicht zur Lage der in anderen europäischen Ländern in Bau befindlichen Offshore-Windparks Baltic Sea EnBW Baltic 2 In the Baltic Sea the start of construction for the offshore wind farm EnBW Baltic 2 is scheduled for summer The project, initially called Kriegers Flak will be realized 32 km north of Rügen, with 80 WTGS of the type Siemens SWT and a total installed capacity of 288 MW. The support structures used are monopile and jacket foundations, anemometer first class advanced World wide the only class 0.5 Anemometer accredited according IEC ( ), ISO , Measnet high quality anemometer class 0.5 Class A,B and S accredited acc. IEC for site assessment and power performance of WTG. Optimised dynamic behaviour minimum over speeding high accuracy excellent linearity r >0,99999 high survival speed low power excellent price performance ratio patented design adolf ThIeS GMBh & Co. KG Hauptstraße 76 D Göttingen (Germany) Telefon Fax info@thiesclima.com stellung und Inbetriebnahme noch in 2012 zu erwarten ist. Mit dem OWP London Array ist das nächste Rekord-Projekt im Bereich Offshore-Windener gie im Bau. Das Vorhaben umfasst 175 Siemens SWT mit einer Gesamtleistung von 630 MW. Ein Großteil der Monopiles und etwa ein Drittel der Windturbinen waren Mitte 2012 installiert. Die Bauarbeiten für den OWP Gwynt y Môr sollen im Sommer 2012 mit den Rammarbeiten für die Monopiles beginnen. Bei dem Vorhaben kommen 160 Siemens-An lagen der 3,6 MW-Klasse mit einer Gesamtleistung von 576 MW zum Einsatz. Noch in 2012 sollen auch zwei Prototypen der 6 MW-WEA Siemens SWT im Projekt Gun fleet Sands 3 errichtet werden. Darüber hinaus ist der Baubeginn für den OWP West of Dudden Sands in 2012 geplant. Auch bei diesem Projekt sollen 108 Siemens SWT errichtet werden, die Gesamtleistung beträgt 388,8 MW. Belgien In Belgien geht noch in 2012 der OWP Thornton Bank Phase II mit einer Gesamtleistung von 184,5 MW in Be trieb. Bis Ende Juli 2012 konnten bei dem Projekt die ersten 30 Repower 6M-Anlagen an einem Offshore-Standort installiert werden. Für 2013 ist die Errichtung weiterer 18 Repower 6M geplant. Im Zuge der Gründungsarbeiten für Thornton Bank II wurden auch bereits die Jacket-Fun damente für das Nach folgeprojekt Thornton Bank Phase III errichtet. Dänemark In Dänemark ist der OWP Anholt im Bau, der 111 Siemens SWT mit einer Gesamtleistung von 399,6 MW umfasst. Bei dem Projekt wurde bis Mitte 2012 ein Großteil der Monopile-Fundamen te errichtet. Die Abb. 3 gibt abschließend einen Überblick zur Lage der in den europäischen Nachbarländern in Bau befindlichen Offshore-Windparks. The World of W eat her d a T a DEWI MAGAZIN NO. 41, AUGUST

8 the latter of which will be used at the wind turbine sites with a water depth of at least approx. 33 m. Grid connection will be at 150 kv level via a 120 km submarine cable and a 16 km onshore cable extending up to the point of common coupling in the Bentwisch transformer station in Mecklenburg-Vorpommern. Completion and commissioning of EnBW Baltic 2 are scheduled for Status of Offshore Wind Power - International There are also other European countries in which a large number of offshore wind farms are under construction. A major part of these activities takes place in Great Britain, where currently already about half the offshore wind capacity worldwide is installed. As shown in the following overview, offshore wind farms are under construction at present also in Belgium and Denmark. Great Britain In 2012, the British OWFs Ormonde (150 MW, 30 Repower 5M) and Walney 2 (183.6 MW, 51 Siemens SWT ) have started operation. Another six OWFs are under construction at present, which together will have a total installed capacity of more than 2,350 MW. All the sites of these wind farms are located near the coast within or just outside the 12-nautical mile zone in comparatively shallow waters, which allows the use of monopile foundations and three-phase AC grid connection. It is an interesting fact that all 665 WTGS currently under construction in Great Britain are supplied by Siemens. The turbine types used have a rated power of 3.6 MW, most of them with 120 m rotor diameter. An exception is the OWF Teesside, which will be equipped with 2.3 MW WTGS. The 140 WTGS of the type Siemens SWT of the OWF Greater Gabbard have already been erected completely, with a major part of them already connected to the grid. With a total installed power of 504 MW, Grea ter Gabbard is therefore expected to become fully operational in 2012 as the world s largest offshore wind farm. In the OWF Sheringham Shoal all of the 88 Siemens SWT wind turbines have also already been installed. Consequently, this major project with a total installed power of MW is also expected to become fully operational in In the offshore project Lincs all of the monopile foundations were erected by mid-2012, so that the 75 Siemens SWT can now be installed. The total installed capacity of the OWF is 270 MW. The OWF Teesside with 27 turbines of the type Siemens SWT and a total installed power of 62.1 MW is small in comparison with the other UK projects. Here too, all of the monopile foundations were installed by mid-2012, so that completion and commissioning of the wind farm is expected to be realized before the end of The OWF London Array is the next record project under construction in the UK offshore area. The project comprises 175 Siemens SWT wind turbines with a total installed power of 630 MW. A large part of the monopiles and about one third of the wind turbines was already installed by mid The construction phase of the OWF Gwynt y Môr is going to start in summer 2012 with the pile-driving work for the monopiles. The OWF will be equipped with 160 Siemens wind turbines of the 3.6 MW class with a total installed power of 576 MW. Also in 2012 two prototypes of 6 MW wind turbines, type Siemens SWT , are to be installed within the project Gun fleet Sands 3. Another project for which construction work is scheduled to start in 2012 is West of Dudden Sands, also to be equipped with Siemens wind turbines, 108 turbines of the type SWT , total installed capacity MW. Belgium In Belgium the OWF Thornton Bank Phase II with a total installed capacity of MW will be connected to the grid before the end of By the end of July 2012, the first 30 Repower 6M wind turbines ever to be installed at an offshore site were erected within this project. For 2013 another 18 Repower 6M WTGS are scheduled to be installed. In the course of the foundation work for Thornton Bank II the jacket foundations for the follow-up project Thornton Bank Phase III have also already been installed. Denmark In Denmark the OWF Anholt is under construction comprising 111 Siemens SWT wind turbines with a total installed power of MW. With this project, a large part of the monopile foundations had been erected by mid The Fig. 3 gives an overview of the locations of the offshore wind farms under construction in the European neighboring countries. List of Advertisers Adolf Thies, Göttingen 39 Bremer Landesbank, Bremen U2 Dehn und Söhne, Neumarkt 37 DEWI, Wilhelmshaven 9, 17, 49, 53 energynautics GmbH, Langen 57 GWU-Umwelttechnik, Erftstadt 31 Hamburg Messe und Congress GmbH, Hamburg 13 Husumer Wirtschaftsgesellschaft mbh & Co. KG 25 Mitsubishi Electric Europe B.V., Ratingen U4 Overspeed GmbH & Co. KG, Oldenburg 23 SINOI GmbH, Nordhausen 43 SunMedia Verlag, Hannover U3 Windspeed Ltd., Rhyl, UK DEWI MAGAZIN NO. 41, AUGUST 2012

OFFSHORE-WINDENERGIELEISTUNG ERREICHT 2017 FAST 5,4 GIGAWATT

OFFSHORE-WINDENERGIELEISTUNG ERREICHT 2017 FAST 5,4 GIGAWATT STATUS UND PERSPEKTIVEN FÜR DIE OFFSHORE-WINDENERGIE IN DEUTSCHLAND Status 30.6.2018 Der Beitrag gibt einen Überblick zum aktuellen Stand der Offshore-Windenergienutzung in Deutschland mit Stand 30. Juni

Mehr

Inhalt. Trends der Windkraft Entwicklung der Offshore-Windenergienutzung. Technische Entwicklung Zukünftige Aufgaben

Inhalt. Trends der Windkraft Entwicklung der Offshore-Windenergienutzung. Technische Entwicklung Zukünftige Aufgaben Trends der Windkraft Entwicklung der Offshore-Windenergienutzung G.Gerdes Deutsche WindGuard GmbH Dr. Knud Rehfeldt Stiftung OFFSHORE-WINDENERGIE 1 Inhalt Stiftung OFFSHORE-WINDENERGIE Marktentwicklung

Mehr

German Offshore Market Growing Despite Problems with Grid Connection

German Offshore Market Growing Despite Problems with Grid Connection German Offshore Market Growing Despite Problems with Grid Connection Deutscher Offshore-Markt wächst trotz Problemen bei der Netzanbindung B. Neddermann; DEWI GmbH, Wilhelmshaven English - Deutsch Introduction

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND Jahr STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de Leistungszubau

Mehr

Offshore Wind Energy in Germany with a Record Installation of 1,437 MW in 2014

Offshore Wind Energy in Germany with a Record Installation of 1,437 MW in 2014 Offshore Wind Energy in Germany with a Record Installation of 1,437 MW in 2014 Offshore-Windenergie in Deutschland mit Rekord- Installation von 1.437 MW in 2014 B. Neddermann; DEWI, Wilhelmshaven ENGLISH

Mehr

Development of Offshore Wind Energy in Germany in the First Half Year of 2014

Development of Offshore Wind Energy in Germany in the First Half Year of 2014 Development of Offshore Wind Energy in Germany in the First Half Year of 2014 Entwicklung der Offshore-Windenergie in Deutschland im 1. Halbjahr 2014 B. Neddermann; DEWI GmbH, Wilhelmshaven English - Deutsch

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND Zusätzliche Auswertungen und Daten für das Jahr Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de

Mehr

Energieübertragung Windparks

Energieübertragung Windparks Kurt Detroy, ABB Mannheim, Grid Systems, Marketing & Sales Sächsische Energieagentur SAENA GmbH, Dresden, 21. November 2011 HVDC Technologie Energieübertragung Windparks December 21, 2011 Slide 1 Anbindung

Mehr

Offshore-Monitoring Stand der Offshore-Anbindungen nach dem dritten Quartal 2018

Offshore-Monitoring Stand der Offshore-Anbindungen nach dem dritten Quartal 2018 Offshore-Monitoring Stand der Offshore-Anbindungen nach dem dritten Quartal 2018 Q3 2018 209 Einleitung Zusätzlich zu den Vorhaben des Bundesbedarfsplans und des Energieleitungsausbaugesetzes werden auch

Mehr

Aktuelle Situation der Offshore- Windenergie in Deutschland Andreas Wagner, Geschäftsführer Stiftung OFFSHORE-WINDENERGIE

Aktuelle Situation der Offshore- Windenergie in Deutschland Andreas Wagner, Geschäftsführer Stiftung OFFSHORE-WINDENERGIE Offshore Wind meets Sail Sassnitz: 14. August 2015 Aktuelle Situation der Offshore- Windenergie in Deutschland Andreas Wagner, Geschäftsführer Stiftung OFFSHORE-WINDENERGIE 2 Offshore Wind meets Sail Sassnitz:

Mehr

Offshore Wind Energy Boom in the First Half Year of 2013 An Overview of the Construction Progress of German Offshore Wind Farms

Offshore Wind Energy Boom in the First Half Year of 2013 An Overview of the Construction Progress of German Offshore Wind Farms Offshore Wind Energy Boom in the First Half Year of 2013 An Overview of the Construction Progress of German Offshore Wind Farms Boom der Offshore-Windenergie im ersten Halbjahr 2013 Ein Überblick zum Baufortschritt

Mehr

Meteorological measurements at the Offshore Platform FINO 2 - new insights -

Meteorological measurements at the Offshore Platform FINO 2 - new insights - FINO 2011 Conference May 11 th 2011, Hamburg, Germany Meteorological measurements at the Offshore Platform FINO 2 - new insights - Dipl.-Geoök. Stefan Müller, Dipl.-Ing Joachim Schwabe Content 1. FINO

Mehr

OFFSHORE-PROJEKTE IN DEUTSCHLAND STAND UND PERSPEKTIVEN

OFFSHORE-PROJEKTE IN DEUTSCHLAND STAND UND PERSPEKTIVEN OFFSHORE-PROJEKTE IN DEUTSCHLAND STAND UND PERSPEKTIVEN Parlamentarischer Abend der Offshore-Windindustrie Berlin, den 19.03.2014 Landesvertretung Mecklenburg-Vorpommern Dr. Jörg Buddenberg Geschäftsführer

Mehr

Netzentwicklungsplan 2013. erster Entwurf der übertragungsnetzbetreiber

Netzentwicklungsplan 2013. erster Entwurf der übertragungsnetzbetreiber Anhang Offshore- Netzentwicklungsplan 2013 erster Entwurf der übertragungsnetzbetreiber Offshore-NETZENTWICKLUNGSPLAN 2013 101 Inhaltsverzeichnis Inhaltsverzeichnis Anhang 9 Anhang...............................................................

Mehr

Ocean s Challenges and Opportunities, Workshop Mai 2013, Porto, Portugal

Ocean s Challenges and Opportunities, Workshop Mai 2013, Porto, Portugal Quality by Know-how Offshore Wind Research 10 years of met-ocean measurements for offshore wind farms at the research platform FINO1 Thomas Neumann Beatriz Canadillas SITE ASSESSMENT. WIND TURBINE ASSESSMENT.

Mehr

999 Werbeagentur GmbH Die Kommunikationsgestalter

999 Werbeagentur GmbH Die Kommunikationsgestalter Die RWE Innogy GmbH beauftragt die Kommunikationsgestalter mit der Bildbandreihe zu den Bauphasen des Offshore-Windkraftwerks Nordsee Ost. 999 Werbeagentur GmbH Die Kommunikationsgestalter Ausgangspunkt

Mehr

Anbindung der Offshore-Windenergieanlagen an das Energienetz an Land

Anbindung der Offshore-Windenergieanlagen an das Energienetz an Land Anbindung der Offshore-Windenergieanlagen an das Energienetz an Land DLR-Fachtagung: Anforderungen an den Aus- und Umbau der Energienetze ökologische und technische Aspekte Tim Meyerjürgens 28. September

Mehr

ANHANG ZUM OFFSHORE- NETZENTWICKLUNGSPLAN 2014, ERSTER ENTWURF

ANHANG ZUM OFFSHORE- NETZENTWICKLUNGSPLAN 2014, ERSTER ENTWURF ANHANG ZUM OFFSHORE- NETZENTWICKLUNGSPLAN 2014, ERSTER ENTWURF OFFSHORE-NETZENTWICKLUNGSPLAN 2014 73 INHALTSVERZEICHNIS Einführende Bemerkungen. 74 Legende Steckbriefe Start-Offshorenetz. 75 Steckbriefe

Mehr

OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES

OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES OFFSHORE MANAGEMENT RESOURCES

Mehr

Perspektiven der Offshore-Windenergiebranche in Deutschland

Perspektiven der Offshore-Windenergiebranche in Deutschland Deutscher Bundestag Drucksache 17/11982 17. Wahlperiode 28. 12. 2012 Antwort der Bundesregierung auf die Kleine Anfrage der Abgeordneten Uwe Beckmeyer, Rolf Hempelmann, Dr. Hans-Peter Bartels, weiterer

Mehr

Präsentation Bau des Offshore-Windkraftwerks Gwynt y Môr

Präsentation Bau des Offshore-Windkraftwerks Gwynt y Môr Präsentation Bau des Offshore-Windkraftwerks Gwynt y Môr Essen, 04. Juni 2010 RWE Innogy GmbH Karolingersstraße 94 45141 Essen T +49 201/12-14499 F +49 201/12-14498 I www.rweinnogy.com Überblick worum

Mehr

60 Jahre HVDC Weltweiter Rückblick der Entwicklung und Ausblick für Deutschland

60 Jahre HVDC Weltweiter Rückblick der Entwicklung und Ausblick für Deutschland Stefan Habild, ABB AG, Geschäftsbereichsleiter Grid Systems 09.04.2014 60 Jahre HVDC Weltweiter Rückblick der Entwicklung und Ausblick für Deutschland Uno Lamm - The Father of HVDC With ABB: 1927 1969

Mehr

Jahr 2015 STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND. Im Auftrag von:

Jahr 2015 STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND. Im Auftrag von: STATUS DES OFFSHORE- WINDENERGIEAUSBAUS Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de Jährlicher szubau Kumulierte Kumuliert

Mehr

Where are we now? The administration building M 3. Voransicht

Where are we now? The administration building M 3. Voransicht Let me show you around 9 von 26 Where are we now? The administration building M 3 12 von 26 Let me show you around Presenting your company 2 I M 5 Prepositions of place and movement There are many prepositions

Mehr

Offshore Windstromerzeugung Energiewende in XXL

Offshore Windstromerzeugung Energiewende in XXL Offshore Windstromerzeugung Energiewende in XXL Dr. Jörg Buddenberg 12.04.2016 1 Gliederung Vorstellung Eine kurze Geschichte der Offshore Windenergie Womit alles begann - alpha ventus Phase 2 Erfolge

Mehr

Fundamente für Offshore-Windparks in Nord- und Ostsee Eine Herausforderung für die deutsche Bauindustrie

Fundamente für Offshore-Windparks in Nord- und Ostsee Eine Herausforderung für die deutsche Bauindustrie Fundamente für Offshore-Windparks in Nord- und Ostsee Eine Herausforderung für die deutsche Bauindustrie Inhaltsverzeichnis 1. Einleitung 2. Forschungstätigkeit 3. Ausführungen 4. Zukunft Seite 2 Einleitung

Mehr

Entwicklung der Offshore--Windenergie Chancen und Risiken

Entwicklung der Offshore--Windenergie Chancen und Risiken Entwicklung der Offshore--Windenergie Chancen und Risiken - 1 - Nautischer Verein Bremerhaven Quelle: BWE - 2 - Nautischer Verein Bremerhaven Warum Offshore? www.windenergie-agentur.de Verfügbare Fläche

Mehr

There are 10 weeks this summer vacation the weeks beginning: June 23, June 30, July 7, July 14, July 21, Jul 28, Aug 4, Aug 11, Aug 18, Aug 25

There are 10 weeks this summer vacation the weeks beginning: June 23, June 30, July 7, July 14, July 21, Jul 28, Aug 4, Aug 11, Aug 18, Aug 25 Name: AP Deutsch Sommerpaket 2014 The AP German exam is designed to test your language proficiency your ability to use the German language to speak, listen, read and write. All the grammar concepts and

Mehr

Magic Figures. We note that in the example magic square the numbers 1 9 are used. All three rows (columns) have equal sum, called the magic number.

Magic Figures. We note that in the example magic square the numbers 1 9 are used. All three rows (columns) have equal sum, called the magic number. Magic Figures Introduction: This lesson builds on ideas from Magic Squares. Students are introduced to a wider collection of Magic Figures and consider constraints on the Magic Number associated with such

Mehr

16.7 Hz - The Missing Link?

16.7 Hz - The Missing Link? 16.7 Hz - The Missing Link? Prof. István Erlich University of Duisburg-Essen Bremen, January 2014 Current Concept 2 Current Concept Offshore Onshore WP1 33 kv AC, 50 Hz WP-Plattform WP-Plattform 150 kv

Mehr

Franke & Bornberg award AachenMünchener private annuity insurance schemes top grades

Franke & Bornberg award AachenMünchener private annuity insurance schemes top grades Franke & Bornberg award private annuity insurance schemes top grades Press Release, December 22, 2009 WUNSCHPOLICE STRATEGIE No. 1 gets best possible grade FFF ( Excellent ) WUNSCHPOLICE conventional annuity

Mehr

Kostensenkungspotentiale

Kostensenkungspotentiale Kostensenkungspotentiale bei der Anbindung von Offshore-Windparks 23. April 2018 Tim Meyerjürgens TenneT Netzbetreiber auf See 3,040 Internal employees EBIT 834 (EUR million) Assets 20,251 (EUR million)

Mehr

Status der Windenergienutzung in Deutschland - Stand 31.12.2011. J. P. Molly, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand 31.12.2011. J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2011 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand 31.12.2011

Mehr

Funktion der Mindestreserve im Bezug auf die Schlüsselzinssätze der EZB (German Edition)

Funktion der Mindestreserve im Bezug auf die Schlüsselzinssätze der EZB (German Edition) Funktion der Mindestreserve im Bezug auf die Schlüsselzinssätze der EZB (German Edition) Philipp Heckele Click here if your download doesn"t start automatically Download and Read Free Online Funktion

Mehr

( World / Welt ) Year / Jahr

( World / Welt ) Year / Jahr 250.000 Accumulated Capacity / Kumulierte Leistung ( World / Welt ) Accumulated Capacity / Kumulierte Leistung MW 200.000 150.000 100.000 50.000 0 1990 1991 World without Europe Europe without Germany

Mehr

Englisch-Grundwortschatz

Englisch-Grundwortschatz Englisch-Grundwortschatz Die 100 am häufigsten verwendeten Wörter also auch so so in in even sogar on an / bei / in like wie / mögen their with but first only and time find you get more its those because

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND STATUS DES OFFSHORE- WINDENERGIEAUSBAUS Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de Jährlicher Leistungszubau und -rückbau

Mehr

Grade 12: Qualifikationsphase. My Abitur

Grade 12: Qualifikationsphase. My Abitur Grade 12: Qualifikationsphase My Abitur Qualifikationsphase Note 1 Punkte Prozente Note 1 15 14 13 85 % 100 % Note 2 12 11 10 70 % 84 % Note 3 9 8 7 55 % 69 % Note 4 6 5 4 40 % 54 % Note 5 3 2 1 20 % 39

Mehr

Der Ausbau der Windenergie auf See - Die neue Gesetzgebung nach dem WindSeeG

Der Ausbau der Windenergie auf See - Die neue Gesetzgebung nach dem WindSeeG Der Ausbau der Windenergie auf See - Die neue Gesetzgebung nach dem WindSeeG Sven Utermöhlen, Director Offshore Wind, E.ON Energierechtlicher Workshop Neuerungen im EEG 2017 Hannover, 5 Dezember 2016 1

Mehr

Newest Generation of the BS2 Corrosion/Warning and Measurement System

Newest Generation of the BS2 Corrosion/Warning and Measurement System Newest Generation of the BS2 Corrosion/Warning and Measurement System BS2 System Description: BS2 CorroDec 2G is a cable and energyless system module range for detecting corrosion, humidity and prevailing

Mehr

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB Read Online and Download Ebook PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB DOWNLOAD EBOOK : PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: Click link bellow

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND 27 STATUS DES OFFSHORE- WINDENERGIEAUSBAUS Im Auftrag von: Deutsche WindGuard - Oldenburger Straße 65-2636 Varel 445/955 - info@windguard.de - www.windguard.de Jährlicher Leistungszubau und -rückbau [MW]

Mehr

Stand der Netzanbindung der Offshore- Windparks in der deutschen Nordsee

Stand der Netzanbindung der Offshore- Windparks in der deutschen Nordsee August 2009 Stand der Netzanbindung der Offshore- Windparks in der deutschen Nordsee "offshore talks by windcomm" Büsum, 11. August 2009 Inhalt Rahmenbedingungen Unsere Aufgabe - von der Theorie in die

Mehr

TRAVEL AND HOTEL INFORMATION

TRAVEL AND HOTEL INFORMATION 15th Annual Meeting of the Biofeedback Foundation of Europe February 22-26, 2011, Munich, Germany TRAVEL AND HOTEL INFORMATION Conference location Hochschule München: Fakultät Elektrotechnik und Informationstechnik

Mehr

Planung von Offshore - Netzanbindungen

Planung von Offshore - Netzanbindungen Planung von Offshore - Netzanbindungen Herausforderungen aus Sicht des Übertragungsnetzbetreibers Angelika Grohmann-Wörle, TenneT Offshore GmbH 21.11.2013 Übertragungsnetzbetreiber TenneT Allgemeine Informationen

Mehr

Aktuelle Entwicklungen am Offshore-Windenergie Markt

Aktuelle Entwicklungen am Offshore-Windenergie Markt Aktuelle Entwicklungen am Offshore-Windenergie Markt Vattenfall / DanTysk Gesellschaft für Maritime Technik e.v. Die GMT - Gesellschaft für Maritime Technik e.v. wurde 1983 gegründet und zählt heute über

Mehr

Cycling. and / or Trams

Cycling. and / or Trams Cycling and / or Trams Experiences from Bern, Switzerland Roland Pfeiffer, Departement for cycling traffic, City of Bern Seite 1 A few words about Bern Seite 2 A few words about Bern Capital of Switzerland

Mehr

Cycling and (or?) Trams

Cycling and (or?) Trams Cycling and (or?) Trams Can we support both? Experiences from Berne, Switzerland Roland Pfeiffer, Departement for cycling traffic, City of Bern Seite 1 A few words about Bern Seite 2 A few words about

Mehr

Pilot Project Biogas-powered Micro-gas-turbine

Pilot Project Biogas-powered Micro-gas-turbine 1/18 Pilot Project Biogas-powered Micro-gas-turbine Supported by the Hessischen Ministerium für Wirtschaft, Verkehr und Landesentwicklung Speaker Details 2/18 Jan Müller Works at Institute of Solar Energy

Mehr

Call Centers and Low Wage Employment in International Comparison

Call Centers and Low Wage Employment in International Comparison Wissenschaftszentrum Nordrhein-Westfalen Kulturwissenschaftliches Institut Wuppertal Institut für Klima, Umwelt, Energie Institut Arbeit und Technik Call Centers and Low Wage Employment in International

Mehr

Bosch Rexroth - The Drive & Control Company

Bosch Rexroth - The Drive & Control Company Bosch Rexroth - The Drive & Control Company Alle Rechte bei Bosch Rexroth AG, auch für den Fall von Schutzrechtsanmeldungen. Jede Verfügungsbefugnis, wie Kopier- und Weitergaberecht, bei uns. 1 Case study

Mehr

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB Read Online and Download Ebook PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB DOWNLOAD EBOOK : PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: Click link bellow

Mehr

1. General information... 2 2. Login... 2 3. Home... 3 4. Current applications... 3

1. General information... 2 2. Login... 2 3. Home... 3 4. Current applications... 3 User Manual for Marketing Authorisation and Lifecycle Management of Medicines Inhalt: User Manual for Marketing Authorisation and Lifecycle Management of Medicines... 1 1. General information... 2 2. Login...

Mehr

SAMPLE EXAMINATION BOOKLET

SAMPLE EXAMINATION BOOKLET S SAMPLE EXAMINATION BOOKLET New Zealand Scholarship German Time allowed: Three hours Total marks: 24 EXAMINATION BOOKLET Question ONE TWO Mark There are three questions. You should answer Question One

Mehr

Deutschland - Stand 30.06.2011. J. P. Molly, DEWI GmbH

Deutschland - Stand 30.06.2011. J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 30.06.2011 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand 30.06.2011

Mehr

Mobility trends in the Baltic Sea Region

Mobility trends in the Baltic Sea Region Mobility trends in the Baltic Sea Region Conference on promoting strategic and innovative mobility for students and researchers 23 November 2010 in Copenhagen by Dr. Birger Hendriks Outline Forms of mobility

Mehr

Wissenschaftliche Dienste. Sachstand. Payment of value added tax (VAT) (EZPWD-Anfrage ) 2016 Deutscher Bundestag WD /16

Wissenschaftliche Dienste. Sachstand. Payment of value added tax (VAT) (EZPWD-Anfrage ) 2016 Deutscher Bundestag WD /16 Payment of value added tax (VAT) (EZPWD-Anfrage ) 2016 Deutscher Bundestag Seite 2 Payment of value added tax (VAT) (EZPWD-Anfrage ) Aktenzeichen: Abschluss der Arbeit: 07.04.2016 Fachbereich: WD 4: Haushalt

Mehr

EXPOSÉ. Mercedes-Benz 220 Cabriolet A ID 1246

EXPOSÉ. Mercedes-Benz 220 Cabriolet A ID 1246 EXPOSÉ Mercedes-Benz 220 Cabriolet A ID 1246 BECHTEL MOTORCOMPANY GMBH GESCHÄFTSFÜHRER / MANAGING DIRECTOR TIM BECHTEL CONTENT PICTURES TECHNICAL DATA HISTORY RESTORATION DOCUMENTATION BECHTEL MOTORCOMPANY

Mehr

VIDEO CALL CAMERA G-VCAM-01

VIDEO CALL CAMERA G-VCAM-01 VIDEO CALL CAMERA G-VCAM-01 EN AUS GUTEM GRUND ENGLISH 07-10 2 SAFETY AND INFORMATION Safety 7 This camera is designed to transmit video and audio signals. All other uses are expressly prohibited. 7 Protect

Mehr

Status der Windenergienutzung in Deutschland - Stand B. Neddermann, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand B. Neddermann, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 30.06.2010 B. Neddermann, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND STATUS DES OFFSHORE- WINDENERGIEAUSBAUS Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de szubau Kumulierte Kumuliert (31.12.)

Mehr

Offshore Windenergie in Deutschland Aktuelle Situation

Offshore Windenergie in Deutschland Aktuelle Situation Offshore Windenergie in Deutschland Aktuelle Situation Andreas Wagner, Geschäftsführer Stiftung OFFSHORE WINDENERGIE Stiftung OFFSHORE WINDENERGIE 2005 gegründet als überparteiliche und unabhängige Einrichtung

Mehr

Umweltauswirkungen des Netzausbaus in Nord- und Ostsee

Umweltauswirkungen des Netzausbaus in Nord- und Ostsee Umweltauswirkungen des Netzausbaus in Nord- und Ostsee Stand der Genehmigungen, Planung und Bau von Anlagen Vorstellung der laufenden Offshore-Projekte Thomas Ehrhardt-Unglaub 18. Juni 2013 Anbindungsverpflichtung

Mehr

Connecting the dots on Germany s Energiewende and its impact on European energy policy

Connecting the dots on Germany s Energiewende and its impact on European energy policy Connecting the dots on Germany s Energiewende and its impact on European energy policy Rebecca Bertram Heinrich Böll Foundation Heinrich-Böll-Stiftung Schumannstraße 8 Telefon 030.285 34-0 Die grüne politische

Mehr

USBASIC SAFETY IN NUMBERS

USBASIC SAFETY IN NUMBERS USBASIC SAFETY IN NUMBERS #1.Current Normalisation Ropes Courses and Ropes Course Elements can conform to one or more of the following European Norms: -EN 362 Carabiner Norm -EN 795B Connector Norm -EN

Mehr

Windkraftanlagen im Wattenmeer Aktueller Stand und Perspektiven einer noch jungen Technologie

Windkraftanlagen im Wattenmeer Aktueller Stand und Perspektiven einer noch jungen Technologie 13. April 2016 Bremen Windkraftanlagen im Wattenmeer Aktueller Stand und Perspektiven einer noch jungen Technologie Dr. Ing. Dennis Kruse Stiftung OFFSHORE WINDENERGIE 13. April 2016 Bremen Gliederung

Mehr

Description of the PHOTOSONICS 4B - 35mm Highspeed Camera

Description of the PHOTOSONICS 4B - 35mm Highspeed Camera Description of the PHOTOSONICS 4B - 35mm Highspeed Camera Page 1/3 Framing Rates: Operating Voltage: Current Draw: Film: Magazines: Exposure Time: Movement: Image Steadyness: From 420 to 2.100 fps at five

Mehr

Level 2 German, 2015

Level 2 German, 2015 91126 911260 2SUPERVISOR S Level 2 German, 2015 91126 Demonstrate understanding of a variety of written and / or visual German text(s) on familiar matters 2.00 p.m. Friday 4 December 2015 Credits: Five

Mehr

Taxation in Austria - Keypoints. CONFIDA Klagenfurt Steuerberatungsgesellschaft m.b.h

Taxation in Austria - Keypoints. CONFIDA Klagenfurt Steuerberatungsgesellschaft m.b.h Taxation in Austria - Keypoints 1 CONFIDA TAX AUDIT CONSULTING Our history: Founded in 1977 Currently about 200 employees Member of International Association of independent accounting firms since1994 Our

Mehr

Offshore-Windkraft als Pfeiler der Energiewende

Offshore-Windkraft als Pfeiler der Energiewende Jan Mrosik, CEO Power Transmission & Smart Grid Divisions Siemens AG Offshore-Windkraft als Pfeiler der Energiewende Erlangen, Answers for energy. Siemens - sauberer Strom für die Welt Komplettanbieter

Mehr

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016 Overview The Hamburg Süd VGM Web portal is an application that enables you to submit VGM information directly to Hamburg Süd via our e-portal Web page. You can choose to enter VGM information directly,

Mehr

Umschaltadapter/ Changeover / Trennadapter Disconnection Adapter für LSA-PLUS NT for LSA-PLUS NT. Montageanweisung Mounting Instructions

Umschaltadapter/ Changeover / Trennadapter Disconnection Adapter für LSA-PLUS NT for LSA-PLUS NT. Montageanweisung Mounting Instructions Umschaltadapter/ Changeover / Trennadapter Disconnection Adapter für LSA-PLUS NT for LSA-PLUS NT Montageanweisung Mounting Instructions Der Umschalter dient zum unterbrechungsfreien Umschalten von Installations-drähten

Mehr

Rev. Proc Information

Rev. Proc Information Rev. Proc. 2006-32 Information 2006, CPAs 1 Table 1-Total loss of the home Table 2- Near total loss is water to the roofline. Completely gut the home from floor to rafters - wiring, plumbing, electrical

Mehr

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB Read Online and Download Ebook PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB DOWNLOAD EBOOK : PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: Click link bellow

Mehr

Die JADE Werke als Teil der International Supply Chain für den Offshore Windenergiemarkt. 28. Sept. 2012 - Wirtschaftskongress Wilhelmshaven

Die JADE Werke als Teil der International Supply Chain für den Offshore Windenergiemarkt. 28. Sept. 2012 - Wirtschaftskongress Wilhelmshaven Die JADE Werke als Teil der International Supply Chain für den Offshore Windenergiemarkt 28. Sept. 2012 - Wirtschaftskongress Wilhelmshaven Gliederung 1. Die Energiewende und deren Zielvorgaben 2. Die

Mehr

Registration of residence at Citizens Office (Bürgerbüro)

Registration of residence at Citizens Office (Bürgerbüro) Registration of residence at Citizens Office (Bürgerbüro) Opening times in the Citizens Office (Bürgerbüro): Monday to Friday 08.30 am 12.30 pm Thursday 14.00 pm 17.00 pm or by appointment via the Citizens

Mehr

E.ON Netz sticht in See

E.ON Netz sticht in See E.ON Netz sticht in See Netzanbindung der Offshore- Windparks in Deutschland Paris, 28. Oktober 2008 2 Warum das Ganze: Neue gesetzliche Aufgabe für E.ON Netz Grundlage 17 Abs. 2a EnWG (17.12.2006), Infrastrukturplanungsbeschleunigungsgesetz

Mehr

ATEX-Check list. Compiled by: Date: Signature: Acceptable practice at the determination of flash point: Closed cup according to ISO 2719

ATEX-Check list. Compiled by: Date: Signature: Acceptable practice at the determination of flash point: Closed cup according to ISO 2719 Fire and explosion hazard ATEX 137 1999/92/EG und ATEX 95 2014/34/EU Danger assessment and determination of explosion protection zone for the test space as well as the installation site ATEX-Check list

Mehr

Electrical tests on Bosch unit injectors

Electrical tests on Bosch unit injectors Valid for Bosch unit injectors with order numbers 0 414 700 / 0 414 701 / 0 414 702 Parts Kit Magnet*: - F00H.N37.925 - F00H.N37.933 - F00H.N37.934 * For allocation to the 10-place Bosch order number,

Mehr

Eine Herkulesaufgabe. Offshore-Netzanschlüsse in der Nordsee. Wilfried Breuer, Geschäftsführer, TenneT Offshore GmbH

Eine Herkulesaufgabe. Offshore-Netzanschlüsse in der Nordsee. Wilfried Breuer, Geschäftsführer, TenneT Offshore GmbH Eine Herkulesaufgabe Offshore-Netzanschlüsse in der Nordsee Wilfried Breuer, Geschäftsführer, TenneT Offshore GmbH 18.04.2013 TenneT Zwei Netzbetreiber, ein Unternehmen Europas erster transnationaler Netzbetreiber

Mehr

Deutschland - Stand B. Neddermann, DEWI GmbH

Deutschland - Stand B. Neddermann, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2009 B. Neddermann, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Seite 1 Stand

Mehr

WindEnergy Study 2008 Assessment of the wind energy market until 2017

WindEnergy Study 2008 Assessment of the wind energy market until 2017 WindEnergy-Study 2004 - Assessment of the Wind Energy Market until 2012 WindEnergy-Studie 2004 - Markteinschätzung der Windindustrie bis zum Jahr 2012 WindEnergy Study 2008 Assessment of the wind energy

Mehr

Energiewende im Emsland: TenneT Projekte

Energiewende im Emsland: TenneT Projekte Energiewende im Emsland: TenneT Projekte Regionalplanertagung Meppen 30.09.2015 Dr. Arno Gramatte Agenda Herausforderung Energiewende Energiewende im Emsland Fragen? Onshore: Dörpen West Niederrhein Offshore:

Mehr

Level 1 German, 2016

Level 1 German, 2016 90886 908860 1SUPERVISOR S Level 1 German, 2016 90886 Demonstrate understanding of a variety of German texts on areas of most immediate relevance 2.00 p.m. Wednesday 23 November 2016 Credits: Five Achievement

Mehr

prorm Budget Planning promx GmbH Nordring Nuremberg

prorm Budget Planning promx GmbH Nordring Nuremberg prorm Budget Planning Budget Planning Business promx GmbH Nordring 100 909 Nuremberg E-Mail: support@promx.net Content WHAT IS THE prorm BUDGET PLANNING? prorm Budget Planning Overview THE ADVANTAGES OF

Mehr

Meiner bisherigen Einschätzung nach handelt es sich um eine uralte Lebensform, die diese Erde bereits lange vor dem Menschen bevölkerte.

Meiner bisherigen Einschätzung nach handelt es sich um eine uralte Lebensform, die diese Erde bereits lange vor dem Menschen bevölkerte. Meiner bisherigen Einschätzung nach handelt es sich um eine uralte Lebensform, die diese Erde bereits lange vor dem Menschen bevölkerte. - Das bedeutet auch, die gesamte menschliche Entwicklungsgeschichte

Mehr

WEMAG AG. Dipl.-Ing. (FH) Tobias Struck. The WEMAG Battery For Primary Control Reserve A Review Of 8 Months Of Operation

WEMAG AG. Dipl.-Ing. (FH) Tobias Struck. The WEMAG Battery For Primary Control Reserve A Review Of 8 Months Of Operation WEMAG AG Dipl.-Ing. (FH) Tobias Struck The WEMAG Battery For Primary Control Reserve A Review Of 8 Months Of Operation Characteristic Of Grid Area WEMAG-Group area covered approx. 8,685 sq. km WEMAG 2013

Mehr

Status des Offshore-Windenergieausbaus in Deutschland. Jahr Im Auftrag von

Status des Offshore-Windenergieausbaus in Deutschland. Jahr Im Auftrag von Status des Offshore-Windenergieausbaus in Deutschland Jahr 2018 Im Auftrag von Inhalt Offshore-Windenergiezubau... 3 Anlagenkonfiguration und Fundamenttypen... 4 Wassertiefe und Küstenentfernung... 5 Verteilung

Mehr

Status der Netzanbindungen in der Nordsee

Status der Netzanbindungen in der Nordsee in der Nordsee Kieler Branchenfokus Windenergie Tim Meyerjürgens 4. Februar 2014 TenneT ÜNB in der deutschen Nordsee 12,7 GW Offshore Wind bis 2023 davon 11,0 GW in der Nordsee insgesamt über 40 GW in

Mehr

Level 1 German, 2014

Level 1 German, 2014 90886 908860 1SUPERVISOR S Level 1 German, 2014 90886 Demonstrate understanding of a variety of German texts on areas of most immediate relevance 9.30 am Wednesday 26 November 2014 Credits: Five Achievement

Mehr

Level 2 German, 2013

Level 2 German, 2013 91126 911260 2SUPERVISOR S Level 2 German, 2013 91126 Demonstrate understanding of a variety of written and / or visual German text(s) on familiar matters 9.30 am Monday 11 November 2013 Credits: Five

Mehr

Gewährleistung einer effektiven Bauüberwachung und Koordinierung auf See Praxiserfahrungen und Lösungswege

Gewährleistung einer effektiven Bauüberwachung und Koordinierung auf See Praxiserfahrungen und Lösungswege Gewährleistung einer effektiven Bauüberwachung und Koordinierung auf See Praxiserfahrungen und Lösungswege 2. Schallschutztagung, Deutsche Umwelthilfe, Berlin am 07.05.2014 Monika Breuch-Moritz - BSH Nordsee:

Mehr

Power supply Interference suppressed acc. to DIN EN /- 4, EN 55011, EN CI. B, power factor corrected Power factor BöSha LED driver

Power supply Interference suppressed acc. to DIN EN /- 4, EN 55011, EN CI. B, power factor corrected Power factor BöSha LED driver Operating Instructions LED Mast Double Luminaire Callisto SC DB, incl. Inclination Adjustment, Single-Chip Technology (Please, read carefully before starting operation) Version: 16.01.2017 Model 369-M

Mehr

Mock Exam Behavioral Finance

Mock Exam Behavioral Finance Mock Exam Behavioral Finance For the following 4 questions you have 60 minutes. You may receive up to 60 points, i.e. on average you should spend about 1 minute per point. Please note: You may use a pocket

Mehr

ANHANG ZUM OFFSHORE- NETZENTWICKLUNGS- PLAN 2025, VERSION 2015, 2. ENTWURF

ANHANG ZUM OFFSHORE- NETZENTWICKLUNGS- PLAN 2025, VERSION 2015, 2. ENTWURF ANHANG ZUM OFFSHORE- NETZENTWICKLUNGS- PLAN 2025, VERSION 2015, 2. ENTWURF 85 INHALTSVERZEICHNIS Einführende Bemerkungen. 86 Legende Steckbriefe Start-Offshorenetz und Zubau-Offshorenetz. 87 Steckbriefe

Mehr

Presse. Siemens übergibt weltweit größte Offshore- Netzanbindung an TenneT

Presse. Siemens übergibt weltweit größte Offshore- Netzanbindung an TenneT Presse Büttel, 25. April 2015 Siemens übergibt weltweit größte Offshore- Netzanbindung an TenneT Nordsee-Netzanbindung SylWin1 hat Rekordkapazität von 864 Megawatt Übertragungsleistung reicht zur Versorgung

Mehr

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND STATUS DES OFFSHORE- WINDENERGIEAUSBAUS Im Auftrag von: Deutsche WindGuard GmbH - Oldenburger Straße 65-26316 Varel 04451/95150 - info@windguard.de - www.windguard.de Das Factsheet beschreibt den Status

Mehr

Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten. Click here if your download doesn"t start automatically

Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten. Click here if your download doesnt start automatically Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten Click here if your download doesn"t start automatically Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten Ein Stern in dunkler

Mehr

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH Status der Windenergienutzung in Deutschland - Stand 31.12.2008 J. P. Molly, DEWI GmbH SITE ASSESSMENT. WIND TURBINE ASSESSMENT. GRID INTEGRATION. DUE DILIGENCE. KNOWLEDGE. CONSULTANCY Page 1 Stand 31.12.2008

Mehr

Cooperation Project Sao Paulo - Bavaria. Licensing of Waste to Energy Plants (WEP/URE)

Cooperation Project Sao Paulo - Bavaria. Licensing of Waste to Energy Plants (WEP/URE) Cooperation Project Sao Paulo - Bavaria Licensing of Waste to Energy Plants (WEP/URE) SMA 15.10.2007 W. Scholz Legal framework Bayerisches Staatsministerium für European Directive on Waste incineration

Mehr