HALFEN WDI INST_WDI 03/15

Ähnliche Dokumente
HALFEN MBT INST_MBT 05/17

HALFEN HCP INST_HCP 10/17

HALFEN PSA INST_PSA 05/17

HALFEN HBB-O INST_HBB-O 08/16

HALFEN HBJ-S INST_HBJ-S 01/17

HALFEN HTF INST_HTF 09/13

DKR INST_DKR 08/14. DEHA Conical Pipe Anchor DEHA Konus-Rohranker Assembly Instructions Montageanleitung

HALFEN POWERCLICK INST_PC1 11/16

HALFEN WDK INST_WDK 11/15

HALFEN POWERCLICK MONTAGESYSTEM HALFEN POWERCLICK FRAMING SYSTEM POWERCLICK PC Z 17

HALFEN KON 41/V INST_KON 41-V 01/18

HALFEN UMA/UHA INST_UMA-UHA 07/17

HALFEN KKT-E INST_KKT-E 04/13

Halfenschienen Curved Solution

HALFIX INST_HFX-WD 11/17

hanit Assembly Instruction - Sandbox System Thar -

OPERATING INSTRUCTIONS Test pump ZG 5.1. and ZG 5.2.

Ladeluftkühler / Intercooler Honda Civic Type R Kit-Nr.:

Wandarm inkl. Montagebox und Netzteil Wall bracket incl. installation box and power supply

Montageanleitung Assembly Instruction Artikel: Werkstattschrank mit 2 Türen

Telefon: +49 (0) 5251 / Telefax: +49 (0) 5251 /

Installation guide for Cloud and Square

TriASS Schreibtische. TriASS Schreibtischsystem Montageanleitung. TriASS Desking System Assembly Instructions. Das Assmann Prinzip. Gute Arbeit.

Standard Power Integrated Module

Sixpack with NTC. Features / Eigenschaften. power range up to 1,2 kv / 25 A (trench) 3 Phase IGBT FRED Inverter Bridge 6-Pack flow concept NTC

The luminaire must be installed and main - tained by a suitably qualified person in compliance with latest installation and safety regulations.

InductWarm. astro s. Montageanleitung InductWarm -Tische. Assembly Instruction InductWarm Tables. Version de/eng

V Montageanleitung für Aufbewahrungssystem-Module. Organized Storage Modules Assembly Manual. Gebrauchsanweisung. Operating Instructions

Outdoor-Tasche. Operating Instructions Bedienungsanleitung GB D

Aufbaudose mit Schalter Spacing box with switch. Montageanleitung mounting instructions

DEHA KKT-R INST_KKT-R 05/17

WE-EF LEUCHTEN. Montage- und Wartungshinweise für Linear-Wandleuchten Serie VLR100 LED

Service Manual Service Anleitung U 58/7 KIT

Montageanleitung DORMA MANET Concept Schiebetür an Wand / an Glas Installation DORMA MANET Concept Sliding door onto wall / onto glass

FRIAFIT Ergänzung zur Montageanleitung FRIAFIT -Abwassersystem für Frei spiegel- leitungen und PE-Druckrohrleitungen

DEMU-COUP INST_DEMU-COUP 08/18

HALFEN POWERCLICK MONTAGESYSTEM HALFEN POWERCLICK FRAMING SYSTEM POWERCLICK PC41 17

Downpipe Ford Focus ST MK3 Kit-Nr.:

Bedienungsanleitung SUNNYHEAT Standfuß (Art. Nr )

- M o n t a g e a n l e i t u n g - D e s i g n e l e m e n t e S e i t e n s c h w e l l e r

Montageanleitung Schwert Assembly instructions Sword

PoE Kit Mounting Instructions SG/XG 210/230/310/330/430/450

GRUNDFOS INSTRUCTIONS

Registration of residence at Citizens Office (Bürgerbüro)

Bosch Rexroth - The Drive & Control Company

CELSIUS M / R / V Rack Kit. Mounting Instructions

Montageanleitung DORMA MANET Schiebetür an Wand/an Glas Installation DORMA MANET Sliding door onto wall/onto glass

EINBAUHINWEISE SPURVERBREITERUNG INSTRUCTIONS WHEEL SPACER SYSTEM D3

Bremszugaustauch für Rollator Nitro

Westfalia Bedienungsanleitung. Nr

Container. Pedestal. Bedienungsanleitung Operating instructions

FR777 Differenzial-Kulissenauszug Bodenmontage, 200 kg Tragkraft, mit Gegenführung

Cloud Square. Montageanleitung Installation guide. OWAconsult collection

Word-CRM-Upload-Button. User manual

Montageanleitung / Mounting Instruction

Umschaltadapter/ Changeover / Trennadapter Disconnection Adapter für LSA-PLUS NT for LSA-PLUS NT. Montageanweisung Mounting Instructions

Montageanleitung Racing Lenkerstummelsatz

Cleaning & Disinfection of Eickview Videoendoscopes

Merkblatt zur Montage von Wägezellen Load Cell Installation Instruction Leaflet AZK01X730 Wägezelle / Load Cell

Deceleration Technology. Rotary Dampers mit hohem Drehmoment WRD-H 2515 WRD-H 3015 WRD-H 4025 WRD-H

GB/DE/AT. Fitting instructions/montageanleitung

USB-A ANSCHLUSSKABEL CONNECTION CABLE

Snap-in switch for switches PSE, MSM and MCS 30

Montageanleitung Installation manual

FOX-150/E... FOX-350/E Solar Laderegler

Deceleration Technology. Rotary Dampers with high-torque range WRD-H 0607 WRD-H 0805 WRD-H 1208 WRD-H 1610 WRD-H

Ladeluftkühler/ Intercooler BMW E90 335i EVO 2 Performance Kit-Nr.:

AESCULAP Challenger Ti

IP65 INOX-Tastaturen und Tastaturablagen für PRO-Geräte Produktinformation

Montageanleitung Assembly Instruction Werkbank mit 6 Schubladen/ 2 Türen

roll-up SONJA powerdisplays Aufbauanleitung Assemble instructions

FIS VS 150 C FIS VS 360 S FIS VS 950 S

Tilt Wall. Montage- und Gebrauchsanleitung. Assembly instructions and manual.

Anleitung für einen Perlen-Metallring in abgewandeltem Cubic-RAW Tutorial for a beaded metal ring in modified Cubic-RAW

Ladeluftkühler / Intercooler BMW E82 135I EVO I Competition Kit-Nr.:

Deceleration Technology. Rotary Dampers with high-torque range WRD-H 7550 WRD-H 9565 WRD-H

DEUTSCH: Montageanleitung Händler

Spheros Service-Koffer Spheros service case

STX RJ45 Steckereinsatz Montageanleitung 1 Lieferumfang: STX V1 RJ45-Steckerset Cat.6

p^db=`oj===pìééçêíáåñçêã~íáçå=

I. Benötigtes Werkzeug: I. Required tools: Installation manual / Montageanleitung ODU2 MTP plug n play version. Content of Assembly Instruction

Einbau- und Montageanleitung Tankabdeckung TopCover Seite 2-4 Assembly and installation instructions Tank Cover - TopCover Page 5-7

Ladeluftkühler / Intercooler Mercedes Benz (CL)A 250 Kit-Nr.:

Ausf. Type 1 Ausf. Type 2 Ausf. Type 3 Ausf. Type 4 Ausf. Type 5 Ausf. Type 6. Ausf. Type 7 Ausf. Type 8 Ausf. Type 9 Ausf. Type 10 Ausf.

Montageanleitung / Mounting Instructions. CELSIUS M / R / V / W Rack Kit

Hypex d.o.o. Alpska cesta 43, 4248 Lesce Slovenija Tel: +386 (0) Fax: +386 (0)

Modularer Klemmrollenfreilauf GL...F2-D2(D3) Modular freewheel, roller type GL...F2-D2(D3)

combinable with C-Bow leather bag holder Sissybar - nicht topcasetauglich Kombinierbar mit C-Bow Satteltaschenhalter

Ladeluftkühler/ Intercooler Kit Mini Cooper S R56 Facelift Kit-Nr.:

Halteset für Stützstrebe Holder for support strut

ART 396. Handbuch für SAM Artikulatoren Manual for SAM Articulators SPLITCAST- ARTIKULATOR PRÜFSOCKEL SPLITCAST ARTICULATOR VERIFICATION DEVICE

CERTIFICATE. with the organizational units/sites as listed in the annex has implemented and maintains a Quality Management System.

Montageanweisung Nachträglicher Bewehrungsanschluss mit MKT Injektionssystem VMU plus ETA-11/0514 und Z

Transkript:

INST_WDI 03/15 GB D Wind Anchors Windanker Assembly Instructions Montageanleitung

Assembly Instructions HALFEN WDI Wind anchors for precast concrete façade panels; push-through installation At the precast plant Installation of the WDI-E insert component in the façade panel WDI-E Component f WDI-Z2 Fastener for insert WDI-E Component facing panel f 80 mm support element drilled formwork threaded plate glued to formwork a Install the insert component WDI-E at the specified position and attach it to the formwork using the WDI-Z2 fastener. The bottom threaded plate of the fastener must be glued to the formwork if drilling the formwork is not desired. The façade panel is then concreted. On the construction site Align the façade panel and drilling the hole Drilling Cleaning with compressed air Drill-bit diam. 14 mm b 110 h 140 Align the façade panel and fix the position securely. Drill a 14 mm diam. hole through the hole in the cast-in steel plate into the support concrete element. Observe the minimum edge distances values in the table. Minimum edge distances [mm] Facing panel 100 Support element 55 The specified load capacity of the anchorage is only met if the drill hole is properly cleaned. with wire brush with compressed air Clean the drill hole: blow out from the bottom twice, brush 2 twice and blow out again twice. Cleaning brush and blow-out pump are ordered separately. 2 2015 HALFEN INST_WDI 03/15 www.halfen.com

Assembly Instructions Installing the threaded rod WDI Mortar set injection cartridge static mixer extension tube 1m WDI-M Assembly component threaded rod fixing plate Assemble the mortar set and place the injection cartridge into the applicator gun. Expel a 10 cm length of mortar or two full presses of the gun until the mortar has an even grey colour. This material must be discarded. Insert the extension tube to the bottom of the drill-hole. Draw the applicator gun slowly back out of the drill hole during the filling process allowing the pressure of the mortar to determine the exiting speed. Inject about 11 ml mortar in each drill hole. Observe the processing and curing periods in the table below. By slowly turning the threaded rod, press the rod into the drill-hole until it reaches the bottom. injecting the mortar The threaded rod must not be moved or subjected to load before the curing period is over. Processing and curing periods temperature [C ] in the drill hole maximum processing time minimal curing period (*) + 40 C 85 seconds 15 minutes + 35 C up to + 39 C 85 seconds 20 minutes + 30 C up to + 34 C 2 minutes 25 minutes + 20 C up to + 29 C 4 minutes 45 minutes + 10 C up to + 19 C 6 minutes 1:20 hours + 5 C up to + 9 C 12 minutes 2:00 hours + 0 C up to + 4 C 20 minutes 3:00 hours - 4 C up to - 1 C 45 minutes 5:30 hours - 5 C 1:30 hours 5:30 hours (*) values apply for dry concrete in the support element. installing the threaded rod Observe the curing period 2015 HALFEN INST_WDI 03/15 www.halfen.com 3

Assembly Instructions Final assembly WDI-M Assembly component fixing plate threaded rod Accessories WDI-Z4 Assembly tool WDI-Z5 Hex key Screw the fixing plate on the threaded rod using the WDI-Z4 assembly tool. Check the position of the threaded holes before turning the fixing plate to align the holes. Use the WDI-Z5 Hex. key to screw in and tighten the 2 fixing bolts. Sealing the recess Remove the external recess tube (optional) Insert an elastic layer before applying the mortar. Fill the recess with a suitable mortar. 4 2015 HALFEN INST_WDI 03/15 www.halfen.com

Montageanleitung HALFEN Windanker WDI für Stahlbeton-Fassadenplatten zur Durchsteckmontage Im Fertigteilwerk Montage des Einbauteils WDI-E in der Fassadenplatte Einbauteil WDI-E Halterung WDI-Z2 für Einbauteil f 80 mm Tragendes Bauteil f Geklebte Gewindeplatte Schalungsdurchdringung der Halterung Beton- Fassadenplatte a Einbauteil WDI-E exakt positionieren und mit Halterung WDI-Z2 an der Schalung befestigen. Bei Ausführung ohne Schalungsdurchdringung wird die untere Gewindeplatte a an die Schalung geklebt. Fassadenplatte betonieren. Auf der Baustelle Fassadenplatte ausrichten und Bohrloch herstellen Bohren Säubern mit Ausblaspumpe mit der Reinigungsbürste mit Ausblaspumpe Bohrer Ø 14 mm b 110 h 140 Fassadenplatte ausrichten und unbeweglich fixieren. Bohrlochdurchmesser Ø 14 durch die Öffnung der einbetonierten Stahlplatte in den Ortbeton bohren. Die in der Tabelle angegebenen Mindestrandabstände sind einzuhalten. Mindestrandabstände [mm] Fassadenplatte 100 Tragelement 55 Die angegebene Belastbarkeit der Verankerung wird nur bei ordnungsgemäßer Reinigung des Bohrloches erreicht! Das Bohrloch reinigen durch Ausblasen mit der Ausblaspumpe vom Bohrgrund, Ausbürsten mit der Reinigungsbürste und erneut ausblasen mit der Ausblaspumpe. Ausblaspumpe und Reinigungsbürste bitte separat bestellen. 2015 HALFEN INST_WDI 03/15 www.halfen.com 5

Montageanleitung Montage der Gewindestange WDI Mörtelset Injektionskartusche Statikmischer Montageteil WDI-M Verlängerungsrohr 1m Gewindestab Fixierplatte WDI Mörtelset zusammensetzen, Mörtelkartusche in die Auspresspistole einlegen. Ca. 2 volle Hübe oder einen 10 cm langen Mörtelstrang auspressen, bis der austretende Injektionsmörtel eine gleichmäßige graue Farbe aufweist. Dieser Vorlauf darf nicht verwendet werden. Auspresspistole während des Verfüllens vom Bohrlochgrund beginnend langsam dem Druck folgend zurückziehen. Pro Bohrloch ca. 11 ml injizieren. Die in der Tabelle angegebenen Verarbeitungsund Aushärtezeiten sind zu beachten. Gewindestab unter leichtem Drehen bis zum Bohrlochgrund einbringen. Die Ankerstange ist richtig eingesetzt, wenn an der Ankerstange, um die Bohrlochöffnung herum Mörtel austritt. Injektion des Mörtels Vor Ablauf der Aushärtezeit darf die Gewindestange weder bewegt noch belastet werden. Verarbeitungs und Aushärtezeiten Temperatur [C ] im Bohrloch Maximale Verarbeitungszeit Minimale Aushärtezeit (*) + 40 C 85 Sekunden 15 Minuten + 35 C bis + 39 C 85 Sekunden 20 Minuten + 30 C bis + 34 C 2 Minuten 25 Minuten + 20 C bis + 29 C 4 Minuten 45 Minuten + 10 C bis + 19 C 6 Minuten 1:20 Stunden + 5 C bis + 9 C 12 Minuten 2:00 Stunden + 0 C bis + 4 C 20 Minuten 3:00 Stunden - 4 C bis - 1 C 45 Minuten 5:30 Stunden - 5 C 1:30 Stunden 5:30 Stunden (*) Werte gelten für trockenen Beton. Eindrehen des Gewindestabes Aushärtezeit beachten 6 2015 HALFEN INST_WDI 03/15 www.halfen.com

Montageanleitung Abschließende Montage Montageteil WDI-M Fixierplatte Gewindestab Montagezubehör Montagewerkzeug WDI-Z4 Inbusschraubendreher WDI-Z5 Aufschrauben der Fixierplatte mit dem Montagewerkzeug WDI-Z4. Vorher die Lage der Gewindebohrungen mittels Blick in die Öffnung feststellen. Fixierplatte aufdrehen, bis die Löcher aufeinander passen. Mit dem Inbusschraubendreher WDI-Z5 die beiden Fixierschrauben eindrehen und festziehen. Aussparung verschließen Äußeres Aussparungsrohr entfernen (optional) Vor dem Verfüllen der Aussparung eine elastische Zwischenlage einbringen! Aussparung mit geeignetem Mörtel verfüllen. 2015 HALFEN INST_WDI 03/15 www.halfen.com 7

CONTACT HALFEN WORLDWIDE HALFEN is represented by subsidiaries in the following 14 countries, please contact us: Austria Belgium / Luxembourg China Czech Republic France Germany Italy Netherlands Norway Poland Sweden Switzerland United Kingdom / Ireland United States of America HALFEN Gesellschaft m.b.h. Leonard-Bernstein-Str. 10 1220 Wien HALFEN N.V. Borkelstraat 131 2900 Schoten HALFEN Construction Accessories Distribution Co.Ltd. Room 601 Tower D, Vantone Centre No.A6 Chao Yang Men Wai Street Chaoyang District Beijing P.R. China 100020 HALFEN s.r.o. Business Center Šafránkova Šafránkova 1238/1 155 00 Praha 5 HALFEN S.A.S. 18, rue Goubet 75019 Paris HALFEN Vertriebsgesellschaft mbh Liebigstr. 14 40764 Langenfeld HALFEN S.r.l. Soc. Unipersonale Via F.lli Bronzetti N 28 24124 Bergamo HALFEN b.v. Oostermaat 3 7623 CS Borne HALFEN AS Postboks 2080 4095 Stavanger HALFEN Sp. z o.o. Ul. Obornicka 287 60-691 Poznan Halfen AB Vädursgatan 5 412 50 Göteborg HALFEN Swiss AG Hertistrasse 25 8304 Wallisellen HALFEN Ltd. A1/A2 Portland Close Houghton Regis LU5 5AW HALFEN USA Inc. 8521 FM 1976 P.O. Box 547 Converse, TX 78109 For countries not HALFEN International GmbH listed Liebigstr. 14 HALFEN International 40764 Langenfeld / Germany Furthermore HALFEN is represented with sales offices and distributors worldwide. Please contact us: www.halfen.com Phone: +43-1 - 2596770 E-Mail: office@halfen.at Internet: www.halfen.at Phone: +32-3 - 6580720 E-Mail: info@halfen.be Internet: www.halfen.be Phone: +86-10 5907 3200 E-Mail: info@halfen.cn Internet: www.halfen.cn Phone: +420-311 - 690 060 E-Mail: info@halfen-deha.cz Internet: www.halfen-deha.cz Phone: +33-1 - 44523100 E-Mail: halfen@halfen.fr Internet: www.halfen.fr Phone: +49-2173 - 9700 E-Mail: info@halfen.de Internet: www.halfen.de Phone: +39-035 - 0760711 E-Mail: info@halfen.it Internet: www.halfen.it Phone: +31-74-267 1449 E-Mail: info@halfen.nl Internet: www.halfen.nl Phone: +47-51823400 E-Mail: post@halfen.no Internet: www.halfen.no Phone: +48-61 - 6221414 E-Mail: info@halfen.pl Internet: www.halfen.pl Phone: +46-31 - 985800 E-Mail: info@halfen.se Internet: www.halfen.se Phone: +41-44 - 8497878 E-Mail: mail@halfen.ch Internet: www.halfen.ch Phone: +44-1582 - 470300 E-Mail: info@halfen.co.uk Internet: www.halfen.co.uk Phone: +1 800.423.91 40 E-Mail: info@halfenusa.com Internet: www.halfenusa.com Phone: +49-2173 - 970-0 E-Mail: info@halfen.com Internet: www.halfen.com Fax: +43-1 - 259-6770 99 Fax: +32-3 - 658 15 33 Fax: +86-10 5907 3218 Fax: +420-235 - 314308 Fax: +33-1 - 445231 52 Fax: +49-2173 - 970 225 Fax: +39-035 - 0760799 Fax: +31-74-2 67 26 59 Fax: +47-51 82 34 01 Fax: +48-61 - 622 14 15 Fax: +46-31 - 98 58 01 Fax: +41-44 - 849 78 79 Fax: +44-1582 - 47 03 04 Fax: +1 877. 683.4910 Fax: +49-2173 - 970-849 NOTES REGARDING THIS DOCUMENT Technical and design changes reserved. The information in this publication is based on state-of-the-art technology at the time of publication. We reserve the right to make technical and design changes at any time. Halfen GmbH shall not accept liability for the accuracy of the information in this publication or for any printing errors. The Quality Management System of Halfen GmbH is certified for the locations in Germany, France, the Netherlands, Austria, Poland, Switzerland and the Czech Republic acc. to DIN EN ISO 9001:2008, Certificate No. QS-281 HH. 2015 HALFEN GmbH, Germany applies also to copying in extracts. U - 238-03/15 3.000 03/15 559