Development of Offshore Wind Energy in Germany in the First Half Year of 2014

Ähnliche Dokumente
OFFSHORE-WINDENERGIELEISTUNG ERREICHT 2017 FAST 5,4 GIGAWATT

Offshore Wind Energy in Germany with a Record Installation of 1,437 MW in 2014

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

German Offshore Market Growing Despite Problems with Grid Connection

Offshore Wind Energy Boom in the First Half Year of 2013 An Overview of the Construction Progress of German Offshore Wind Farms

Aktuelle Situation der Offshore- Windenergie in Deutschland Andreas Wagner, Geschäftsführer Stiftung OFFSHORE-WINDENERGIE

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

Inhalt. Trends der Windkraft Entwicklung der Offshore-Windenergienutzung. Technische Entwicklung Zukünftige Aufgaben

Grade 12: Qualifikationsphase. My Abitur

999 Werbeagentur GmbH Die Kommunikationsgestalter

( World / Welt ) Year / Jahr

prorm Budget Planning promx GmbH Nordring Nuremberg

Magic Figures. We note that in the example magic square the numbers 1 9 are used. All three rows (columns) have equal sum, called the magic number.

There are 10 weeks this summer vacation the weeks beginning: June 23, June 30, July 7, July 14, July 21, Jul 28, Aug 4, Aug 11, Aug 18, Aug 25

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016

Offshore-Monitoring Stand der Offshore-Anbindungen nach dem dritten Quartal 2018

Where are we now? The administration building M 3. Voransicht

Jahr 2015 STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND. Im Auftrag von:

SAMPLE EXAMINATION BOOKLET

Energieübertragung Windparks

Level 1 German, 2014

Pilot area B: Zeeland (B + NL) Pilot area C: Terschelling and Northern Fryslan (NL) Pilot area D: Borkum (D)

Registration of residence at Citizens Office (Bürgerbüro)

The English Tenses Die englischen Zeitformen

p^db=`oj===pìééçêíáåñçêã~íáçå=

Bosch Rexroth - The Drive & Control Company

Status der Windenergienutzung in Deutschland - Stand B. Neddermann, DEWI GmbH

EXPOSÉ. Mercedes-Benz 220 Cabriolet A ID 1246

Perspektiven der Offshore-Windenergiebranche in Deutschland

Mitglied der Leibniz-Gemeinschaft

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

Deutschland - Stand J. P. Molly, DEWI GmbH

Completion of testing of up-scaled ECOiCE chiller 100 kw - Abschluss der Tests an der ECOiCE AKM-100 kw

OFFSHORE-PROJEKTE IN DEUTSCHLAND STAND UND PERSPEKTIVEN

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL - USER GUIDE June 2016

Hinweisblatt. Für den Einsatz des MAX! Heizungssteuerungssystems haben Sie zwei Alternativen: Die MAX! Einzelraumlösung und die MAX! Hauslösung.

Exercise (Part II) Anastasia Mochalova, Lehrstuhl für ABWL und Wirtschaftsinformatik, Kath. Universität Eichstätt-Ingolstadt 1

Can I use an older device with a new GSD file? It is always the best to use the latest GSD file since this is downward compatible to older versions.

Connecting the dots on Germany s Energiewende and its impact on European energy policy

Energieeffizienz und Erneuerbare Energien Programme der EZ -- ein Zwischenstand

Johannes Bachmann, Silvia Keilholz

Level 1 German, 2012

Präsentation Bau des Offshore-Windkraftwerks Gwynt y Môr

EXPOSÉ. Mercedes-Benz 220 Cabriolet A ID 1293

Chronologische Übersicht der Veröffentlichungen der Biofrontera AG zur Forschungskooperation mit Maruho (Stand: )

Taxation in Austria - Keypoints. CONFIDA Klagenfurt Steuerberatungsgesellschaft m.b.h

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

Level 2 German, 2015

Level 2 German, 2016

Notice: All mentioned inventors have to sign the Report of Invention (see page 3)!!!

WindEnergy Study 2008 Assessment of the wind energy market until 2017

H o c h s c h u l e D e g g e n d o r f H o c h s c h u l e f ü r a n g e w a n d t e W i s s e n s c h a f t e n

Kostensenkungspotentiale

Deutschland - Stand B. Neddermann, DEWI GmbH

Englisch-Grundwortschatz

25 teams will compete in the ECSG Ghent 2017 Senior Class Badminton.

BAYNES HYDROPOWER SCHEME ON THE LOWER CUNENE. June 2009

EXPOSÉ. Mercedes-Benz 220 Cabriolet A ID 1189

A Classification of Partial Boolean Clones

Internationale Energiewirtschaftstagung TU Wien 2015

NTP Synchronisierung NTP Synchronizer

Ich habe eine Nachricht für Sie

STATUS DES OFFSHORE- WINDENERGIEAUSBAUS IN DEUTSCHLAND

Cycling. and / or Trams

TRAVEL AND HOTEL INFORMATION

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

Extension of the cross-border tram-train network in the Saar-Moselle metropolitan area Sintropher Workshop in Saarbrücken

Level 1 German, 2016

Algorithms for graph visualization

Rev. Proc Information

Application Note. Import Jinx! Scenes into the DMX-Configurator

Schachaufgabe 05: Ma-Übung Chess Problem 05: Mate training

Wissenschaftliche Dienste. Sachstand. Payment of value added tax (VAT) (EZPWD-Anfrage ) 2016 Deutscher Bundestag WD /16

Offshore Windenergie in Deutschland Aktuelle Situation

Mock Exam Behavioral Finance

The Solar Revolution New Ways for Climate Protection with Solar Electricity

WP2. Communication and Dissemination. Wirtschafts- und Wissenschaftsförderung im Freistaat Thüringen

rot red braun brown rot red RS-8 rot red braun brown R S V~

Status der Windenergienutzung in Deutschland - Stand J. P. Molly, DEWI GmbH

Status of Offshore Wind Power - An Up-to-date Overview

Ein Stern in dunkler Nacht Die schoensten Weihnachtsgeschichten. Click here if your download doesn"t start automatically

1. General information Login Home Current applications... 3

Level 2 German, 2013

PONS DIE DREI??? FRAGEZEICHEN, ARCTIC ADVENTURE: ENGLISCH LERNEN MIT JUSTUS, PETER UND BOB

Deutschland - Stand B. Neddermann, DEWI GmbH

Franke & Bornberg award AachenMünchener private annuity insurance schemes top grades

Electrical tests on Bosch unit injectors

Big Data Analytics. Fifth Munich Data Protection Day, March 23, Dr. Stefan Krätschmer, Data Privacy Officer, Europe, IBM

Der Ausbau der Windenergie auf See - Die neue Gesetzgebung nach dem WindSeeG

Illustrierende Aufgaben zum LehrplanPLUS. Working at the zoo

Raziol REACH Statement V Kandidatenliste (SVHC) Candidate List (SVHC)

INFORMATION ABOUT COLLECTIVE TRANSFERS

Newest Generation of the BS2 Corrosion/Warning and Measurement System

EINSPEISEMANAGEMENT: GRUNDLAGEN, ANALYSE- UND PROGNOSEMÖGLICHKEITEN

CUSTOMER INFORMATION

iid software tools QuickStartGuide iid USB base driver installation

Transkript:

Development of Offshore Wind Energy in Germany in the First Half Year of 2014 Entwicklung der Offshore-Windenergie in Deutschland im 1. Halbjahr 2014 B. Neddermann; DEWI GmbH, Wilhelmshaven English - Deutsch Introduction In February 2014 the offshore wind farm (OWF) Riffgat with a total installed capacity of 108 MW finally could be connected to the grid and since then more than half a year after completion of installation has been producing electricity from wind energy in an environmentally friendly way. The total installed wind power capacity in the German North Sea and Baltic Sea with grid connection has risen to 628.3 MW in the first half year of 2014. The following article takes a closer look at the current offshore construction activities off the German coast and shows that from January 1 to June 30, 2014, much more has happened than one would think considering the modest increase in new offshore wind power capacity connected to grid. Nine German offshore wind farms are currently under construction, one of them in the Baltic Sea. During the first six months two OWFs could be completed, and for three projects construction work at sea has begun with the installation of the first foundations. Fig. 1 gives an overview on the construction progress of the offshore wind farms off the German coast in the period between January 1 and June 30, 2014. Einführung Im Februar 2014 konnte der Offshore-Windpark (OWP) Riffgat ans Netz angeschlossen werden und speist seitdem mehr als ein halbes Jahr nach seiner Fertigstellung endlich auch mit der Gesamtleistung von 108 MW um weltfreund lich erzeugten Strom aus Windenergie ins Netz. Damit ist die in der deutschen Nord- und Ostsee installierte Windenergieleistung auf See mit Netzanschluss im ersten Halbjahr 2014 auf insgesamt 628,3 MW angestiegen. Der folgende Beitrag richtet einen genaueren Blick auf die aktuellen Offshore-Bauaktivitäten vor der deutschen Küste und zeigt, dass sich vom 1.1.-30.6.2014 sehr viel mehr getan hat als der überschau bare Anstieg der neu ans Netz angeschlossenen Offshore-Windenergieleistung vermuten lässt. Insgesamt neun deutsche Offshore-Windparks sind derzeit im Bau, davon ein Projekt in der Ostsee. In der ersten Jahres hälfte konnten zwei OWP fertiggestellt werden und bei drei Vorhaben haben mit der Installation der ersten Fun damente die Bauarbeiten auf See begonnen. Abb. 1 gibt einen Gesamtüberblick zum Baufortschritt bei den Offshore-Windparks vor der deutschen Küste im Zeitraum 1.1.-30.06.2014. DEWI MAGAZIN NO. 45, AUGUST 2014 45

80 24 40 20 23 40 37 Wind turbines planned / WEA geplant 0 20 40 2 7 2 41 Piles inst. 30 80 Trianel WP Borkum (1) Meerwind Foundations installed / Fundamente installiert (01.01.-30.06.2014) Dan Tysk Global Tech I* Foundations installed / Fundamente installiert (Status 31.12.2013) Status 30.06.2014 2014 DEWI GmbH Nordsee Ost* EnBW Baltic 2 Wind turbines installed / WEA installiert (Status 31.12.2013) Borkum Riffgrund 1 Foundations planned / Fundamente geplant Amrumbank West Butendiek Wind turbines installed / WEA installiert (01.01.-30.06.2014) *Additional installations (01.01-30.06.2014) of wind turbines without rotor at Global Tech I (32) and Nordsee Ost (8). Fig. 1: Progress of the construction work for OWFs during the first half year 2014 Abb. 1: Übersicht zum Baufortschritt bei der Realisierung der OWP im 1. Halbjahr 2014 The first six months of 2014 have shown once more that the grid connection of the wind farms installed at sea and ready for operation remains the real bottleneck in the further development of offshore wind energy. The present offshore situation is a particularly drastic example: in only six months 126 wind turbines with a total capacity of 542.7 MW were installed at sea however, not one of these turbines so far has been able to feed electricity into the grid due to a lack of connection to shore! In the following the progress in the realization of the projects under construction will be examined more closely and it will also be demonstrated that meanwhile more than half of the wind energy capacity installed at sea is still without an operational grid connection. Meerwind Süd/Ost and Trianel Wind Farms are Completed The installation work for two further offshore wind farms in the German North Sea could be completed in spring 2014. The OWF Meerwind Süd/Ost (288 MW) and the first section of Trianel Windpark Borkum (200 MW) are still without grid connection because the converter stations DolWin alpha and HelWin alpha have been installed at sea, but are not yet ready for operation. Meerwind Süd/Ost At Meerwind Süd/Ost the last 24 wind turbines and the offshore substation were installed until the beginning of April. Thus the installation of 80 Siemens SWT 3.6-120 on monopile foundations could be completed within only 18 months, as scheduled. The project was realized by MW Wind GmbH, a joint venture of the private equity fonds Blackstone Energy Partners from the USA and Windland Energieerzeugungs GmbH from Berlin. According to Wind MW, Meerwind Süd/Ost is the largest project-financed Die Netzanbindung der betriebsbereiten Windenergieanla gen (WEA) auf See blieb auch im ersten Halbjahr 2014 der maßgebliche Engpass für die Ausbauentwicklung. Beson ders drastisch zeigt dies die aktuelle Situation: In nur sechs Monaten wurden 126 WEA mit einer Gesamtleistung von 542,7 MW auf See errichtet mangels Netzanschluss konnte bisher allerdings keine einzige dieser Anlagen Strom ins Netz einspeisen! Nachfolgend wird der Fortschritt bei der Realisierung der in Bau befindlichen Projekte näher betrachtet und auch aufge zeigt, dass mittlerweile für mehr als die Hälfte der auf See installierten Windenergieleistung eine betriebsbereite Netzanbindung fehlt. Meerwind Süd/Ost und Trianel Windpark sind fertiggestellt Die Errichtungsarbeiten für zwei weitere Offshore-Windparks in der deutschen Nordsee konnten im Frühjahr 2014 abgeschlossen werden. Die OWP Meerwind Süd/Ost (288 MW) und der erste Bauab schnitt des Trianel Windpark Borkum (200 MW) sind bisher ohne Netzanbindung, weil die Konverterstationen DolWin alpha und HelWin alpha zwar auf See installiert, aber noch nicht betriebsbereit sind. Meerwind Süd/Ost Bei Meerwind Süd/Ost wurden bis Anfang April die letzten 24 Windturbinen sowie die Offshore-Umspannstation errich tet. Damit konnte die Installation von 80 Siemens SWT 3.6-120 auf Monopile-Fundamenten wie geplant in nur 18 Monaten abgeschlossen werden. Das Projekt wurde von der MW Wind GmbH realisiert, einem Joint Venture des Private-Equity-Fonds Blackstone Energy Part ners aus den USA und der Windland Energieerzeugungs GmbH aus 46 DEWI MAGAZIN NO. 45, AUGUST 2014

Sponsoring / Advertising Media Data Available at www.dewek.de Abstract Deadline: 8 October 2014 Werbung organised by: Kunde 1/1 s/w oder 4c 19 / 20 May 2015 Bremen, Germany 12 th GERMAN WIND ENERGY CONFERENCE Two days of concentrated wind energy technology and research with focus on multimegawatt wind turbines and the German far-offshore wind energy application. Up to 105 oral presentations 0 participants (expected) Technical excursion 50 exhibitors (expected) www.dewek.de

MW 1400 1300 1200 1100 1000 900 800 700 0 500 Status Offshore Wind - MW installed / errichtet - MW in operation / in Betrieb (cumulated / kumuliert) 2014 DEWI GmbH 1,457.6 MW install. 400 320.3 300 215.3 280.3 200 185.3 200.3 MW 100 in operation / 4,5 4,5 7 7 12 72 92 in Betrieb 42 0 30.06. 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 520.3 1,457.6 628.3 628.3 Fig. 2: Abb. 2: Development of offshore wind energy use in Germany Ausbauentwicklung der Offshore-Windenergienutzung in Deutschland offshore wind farm in Germany and the first German project financed exclusively by private investors. This wind farm also has been the first project supported by loans provided under the KfW Offshore Wind Energy Financing Programme. Trianel Windpark Borkum The first phase of the Trianel Windpark Borkum (formerly called Borkum West 2 ) with 40 out of 80 offshore wind turbines planned in total was completed at the beginning of June. This is the first offshore wind farm now operational, which was realized exclusively by municipal utilities and regional energy supply companies. The last 23 wind turbines were erected in 2014. The project has been delayed more and more because the scheduled date for the grid connection was postponed several times. The 40 Tripod foundations had already been installed in the period between September 2011 and April 2012. Despite adjustments made in the time schedule it was not possible to connect the 40 Areva Wind M5000-116 turbines to the grid via the converter station DolWin alpha during the first half of 2014. In a second phase of construction, another 40 wind turbines with a capacity totalling 200 MW are planned to be installed. Wind Turbines Erected in Three Other Projects in the North Sea During the first six months of 2014 the first wind turbines were erected in the offshore wind farms DanTysk, Global Tech I and Nordsee Ost. These projects, however, are also still without an operational grid connection. Berlin. Meerwind Süd/Ost ist nach Angaben von Wind MW der größte projektfinanzierte Offshore-Windpark in Deutschland und das erste deutsche Vorhaben, das komplett durch private Investoren finanziert wurde. Der Windpark wurde zudem als erstes Projekt mit Hilfe des KfW- Finanzierungsprogramms Offshore unterstützt. Trianel Windpark Borkum Der erste Bauabschnitt des Trianel Windparks Borkum (ehem. Borkum West 2 ) mit 40 von insge samt 80 geplan ten Offshore-WEA wurde Anfang Juni fertiggestellt. Damit ist der erste Offshore-Windpark betriebsbereit, der ausschließlich mit Beteiligung von Stadtwerken und re gionalen Energieversorgern realisiert wurde. In 2014 erfolgte die Errichtung der noch fehlenden 23 WEA. Die Reali sierung des Vorhabens hat sich zeitlich durch den mehrfach verschobenen Termin für den Netz anschluss immer weiter verzögert. Die 40 Tripod-Fundamente waren be reits im Zeitraum 09/2011-04/2012 installiert worden. Trotz des angepassten Zeitplans gelang es jedoch nicht, die 40 WEA des Typs Areva Wind M5000-116 noch im ersten Halbjahr 2014 über die Konverterstation DolWin alpha ans Netz anzuschließen. In einem zweiten Bauabschnitt sollen nochmals 40 WEA mit weiteren 200 MW errichtet werden. WEA-Installation auf See bei drei weiteren Projekten in der Nordsee Im ersten Halbjahr 2014 wurden die ersten Wind ener gie anla gen in den Offshore-Windparks DanTysk, Global Tech I und Nordsee Ost auf See errichtet. Auch bei diesen Vorhaben fehlt bisher jedoch noch eine betriebsbereite Netzanbindung. 48 DEWI MAGAZIN NO. 45, AUGUST 2014

DanTysk At mid-year Vattenfall announced that from mid-april to the end of June already more than half of the 80 wind turbines which the company is planning to install together with the Stadtwerke München (Munich municipal utilities) could be erected at sea. The 80 turbines used in the project are Siemens SWT-3.6-120 with a total capacity of 288 MW. The monopile foundations and the offshore substation has already been installed in 2013. Considering the present construction time of only 19 hours per wind turbine, Vattenfall expects that the construction work for Dan Tysk, including the wind farm internal cabling will be completed by autumn 2014. Global Tech I In the OWF Global Tech I installation work for erecting the wind turbines is also in full swing. 37 turbines were fully installed between January 1 and June 30, 2014, and at another 32 turbine sites tower and nacelle have been installed, the rotor blades, however, are still missing. In total, 80 Areva Wind M5000-116 with a capacity totalling 400 MW will be erected. During the first six months of 2014 another two foundations were erected, and now only two more tripods are still missing. The offshore substation for Global Tech I has already been installed. Nordsee Ost In the offshore wind farm Nordsee Ost the last seven of in total 48 jacket foundations are installed during the first six months of 2014. Moreover the first two Senvion 6.2M126 wind turbines could be erected in this project off the German coast. At another eight turbine sites tower and nacelle have been installed, only the rotor blades are still missing. The internal wind farm cabling was completed in June 2014. Installation of Foundations in Four Other Projects in the North and Baltic Seas In the three offshore wind farms in the North Sea OWFs Borkum Riffgrund 1, Amrumbank West and Butendiek installation work for erecting the monopile foundations has begun in the first half of 2014. In the Baltic Sea, in the OWF EnBW Baltic 2 already all of the piles were installed which are necessary for the subsequent erection of the 41 jacket foundations. Fig. 1 shows how many foundations were completed during the first six months of the year. In all of these projects the wind turbine type used for all of the 80 sites is Siemens SWT-3.6-120 with a total capacity of 288 M, except for the OWF Borkum Riffgrund 1, where 78 Siemens wind turbines with 4 MW each (totalling 312 MW) are scheduled to be erected. Furthermore, im May 2014 the substation for the OWF Butendiek could be installed at sea. The substations for the OWFs Nordsee Ost and EnBW Baltic 2 are to be installed during the summer, so that by then all of the offshore wind farms currently under construction will be provided with an offshore substation. DanTysk Pünktlich zur Jahresmitte verkündete Vattenfall, dass von Mitte April bis Ende Juni bereits die Hälfte der 80 WEA auf See installiert werden konnten, die das Unternehmen gemeinsam mit den Stadt werken München errichtet. Bei dem Vorhaben kommen 80 Siemens SWT-3.6-120 mit einer Gesamt leistung von 288 MW zum Einsatz. Die Monopile- Fundamente und das Offshore-Umspannwerk sind bereits 2013 errichtet worden. Angesichts einer bisherigen Aufbauzeit von lediglich rund 19 Stunden pro WEA geht Vattenfall davon aus, dass die Baurealisierung von Dan Tysk, inkl. der laufenden Arbeiten zur parkinternen Verkabelung, bis zum Herbst 2014 abgeschlossen werden können. Global Tech I Auch beim OWP Global Tech I laufen die Arbeiten zum Aufbau der WEA auf Hochtouren. 37 Anla gen wurden zwischen 1.1. und 30.06.2014 vollständig errichtet, an weiteren 32 WEA-Standorten sind bereits Turm und Gondel installiert, allerdings fehlen noch die Rotorblätter. Insgesamt werden 80 Areva Wind M5000-116 mit einer Gesamtleistung von 400 MW errichtet. Im ersten Halbjahr 2014 erfolgte auch die Installa tion von zwei weiteren Fundamenten, so dass nun nur noch zwei Tripods errichtet werden müssen. Das Offshore-Umspannwerk für Global Tech I wurde bereits installiert. Nordsee Ost Im Offshore-Windpark Nordsee Ost wurden im ersten Halbjahr 2014 die sieben letzten von insgesamt 48 Jacket- Fundamenten installiert. Darüber hinaus konnten bei dem Projekt auch die beiden ersten Offshore-WEA des Typs Senvion 6.2M126 vor der deutschen Küste errichtet werden. An acht weiteren WEA-Standorten sind Turm und Gondel bereits montiert, zur Jahresmitte fehlten jedoch noch die Rotorblätter der Anlagen. Die Innerparkverkabelung wurde im Juni 2014 fertiggestellt. Installation der Fundamente bei vier weiteren Projekten in der Nord- und Ostsee Bei den drei Offshore-Windparks in der Nordsee OWP Borkum Riffgrund 1, Amrumbank West und Bu tendiek haben im ersten Halbjahr 2014 die Arbeiten zur Installation der Monopile-Fundamente begonnen. In der Ostsee wurden beim OWP EnBW Baltic 2 bereits sämtliche Pfähle installiert, die für die nachfolgende Errichtung der 41 Jacket-Fundamente erforderlich sind. In Abb. 1 ist dargestellt, wie viele Fundamente in der ersten Jahreshälfte bei den Vorhaben fertiggestellt wurden. Bei allen Projekten sollen jeweils 80 Siemens SWT-3.6-120 mit 288 MW Ge samtleistung zum Einsatz kommen. Eine Ausnahme bildet der OWP Borkum Riffgrund 1, bei dem nun die Errichtung von 78 Siemens-WEA mit je 4 MW (312 MW Gesamtleistung) geplant ist. Ergänzend ist anzumerken, dass im Mai 2014 das Umspannwerk beim OWP Butendiek auf See installiert werden konnte. Bei den OWP Nordsee Ost und EnBW Baltic 2 soll das Umspannwerk im Sommer auf See errichtet werden, so dass dann alle derzeit in Bau befindlichen Offshore- Windparks über ein Offshore-Umspannwerk verfügen. DEWI MAGAZIN NO. 45, AUGUST 2014 49

Grid Connection Still a Bottleneck Fig. 2 shows the wind energy capacity installed and the capacity connected to the grid by June 30, 2014 in the German North and Baltic Seas. The diagram demonstrates that meanwhile 199 wind turbines with a total capacity of 829.3 MW, which is 57% (!) of the offshore wind capacity installed is waiting for a grid connection. The test operation of the converter stations DolWin alpha scheduled for the first quarter of 2014 has been postponed once more. It is hoped that DolWin alpha as well as the second converter station HelWin alpha will now start operation during the second half of the year, and the OWFs Trianel Windpark Borkum and Meerwind Süd/Ost will finally be able to feed electricity into the public supply grid. The already completed wind turbines in the OWFs Borkum Riffgrund 1 and Nordsee Ost also could produce electricity then. In April, with BorWin beta (grid connection BorWin 2 for the OWF Global Tech I ), the third offshore converter station was installed in the German North Sea, followed in July by HelWin beta (grid connection HelWin 2 for the OWF Amrumbank West ) installed directly next to Hel- Win alpha. Already in June the transmission grid operator responsible for the German North Sea, TenneT, announced that the converter station DolWin beta was on its way from Dubai to its destination in the German North Sea. In April 2014 transmission system operator TenneT has awarded the construction of the BorWin 3 offshore grid link in the German North Sea to Siemens, in a consortium with Petrofac, and part of the work to Prysmian. Finally it should be mentioned that BorWin1 (grid connection for the OWF Bard Offshore 1 ) faced several technical faults during the first six months of the year, as a result of which so-called protective trippings occurred which led to unscheduled shutdowns of the grid connection. In March a smoldering fire in an electrical component of the converter platform took place which also led to the shutdown of the network connection. A task force of the companies involved in the grid connection was formed, in order to carry out investigations and measurements at the wind turbines, the wind farm substation and the converter platform. The result of these investigations will determine the time schedule for repairing the technical faults and the complete restoration of the grid connection. The companies involved expect that the technical problems will be resolved and the wind farm be re-connected to the grid by August 2014. The bottom line is that the grid connection of the German offshore wind farms remains a difficult issue although there is reason to hope that the situation will improve by 2015 at the latest. Finally an odd incident should be mentioned which demonstrates that the whole process seems somewhat ill-fated. As if there were not enough problems already, on July 3rd 2014, a barge chartered for the transportation of power cables for German offshore wind farms capsized in the Mediterranean. As a consequence, its cargo, destined for the OWFs Butendiek and Deutsche Bucht and others was lost. Netzanbindung bleibt weiterhin der Engpass Abb. 2 zeigt die bis 30.06.2014 installierte sowie die ans Netz angeschlossene Leistung der Windenergieanlagen in der deutschen Nord- und Ostsee. Die Darstellung ver deutlicht, dass mittlerweile 199 WEA mit einer Ge samt leistung von 829,3 MW bzw. 57% (!) der errichteten Off shore- Windenergieleistung auf einen betriebsbereiten Netzanschluss warten. Der ursprünglich für das erste Quartal 2014 geplante Pro bebetrieb der Konverterstation DolWin alpha hat sich nochmals verzögert. Es bleibt zu hoffen, dass DolWin alpha wie auch die zweite Konverterstation HelWin alpha nun in der zweiten Jahreshälfte den Betrieb aufnehmen, damit die OWP Trianel Windpark Borkum und Meerwind Süd/ Ost endlich Strom ins Netz einspeisen können. Auch die betriebsbereiten WEA in den OWP Borkum Riffgrund 1 und Nordsee Ost könnten dann Strom erzeugen. Im April konnte mit BorWin beta (Netzanschluss BorWin 2 für den OWP Global Tech I ) die dritte Offshore- Konverterstation in der deutschen Nordsee installiert werden und im Juli folgte HelWin beta (Netzanschluss HelWin 2 für den OWP Amrumbank West ), die direkt neben HelWin alpha errichtet wurde. Bereits im Juni meldete der für die deutsche Nordsee zuständige Übertragungsnetzbe treiber Tennet, dass sich auch die Konverterstation DolWin beta auf dem Weg von Dubai zum geplanten Standort in der deutschen Nordsee befindet. Zu ergänzen ist noch, dass im April 2014 die Beauftragung der Netzanbindung BorWin 3 durch Tennet an Siemens im Konsortium mit Petrofac sowie an Prysmian erfolgte. Abschließend ist darauf hinzuweisen, dass nach Angaben des Netzbetreibers Tennet bei der Offshore-Netzanbindung BorWin1 (Anschluss des OWP Bard Offshore 1 ) im ersten Halbjahr 2014 mehrere technische Störungen aufgetreten sind, in deren Folge es zu so genannten Schutzauslösungen und damit zu ungeplanten Abschaltungen der Netzanbindung kam. Im März kam es zudem zu einem Schwelbrand eines elektrischen Bauteils der Konverterplattorm, der zur Ab schal tung der Netzanbindung führte. Es wurde eine Task Force der für den Netzanschluss beteiligten Unternehmen gebildet, um Untersuchungen und Messungen an den Windener gieanlagen sowie der Umspannstation des Windparks und an der Konverterplattorm durchzuführen. Vom Ergebnis dieser Untersuchungen hängt der Zeitplan für die Behe bung der technischen Störungen und der vollständigen Wiederherstellung der Netzanbindung ab. Die beteiligten Unter neh men gehen von einer Behebung der Störung und Zuschaltung des Windparks bis August 2014 aus. Als Fazit ist festzuhalten, dass sich die Realisierung der Netzanbindung für die deutschen Offshore-Windparks weiterhin schwierig gestaltet auch wenn die Hoffnung besteht, dass sich die Situation spätestens 2015 bessern wird. Dass der gesamte Prozess bisher unter keinem guten Stern steht, zeigt ein kurioser Zwischenfall, über den abschließend zu berichten ist. Als gäbe es nicht bereits genug Probleme, kenterte am 3. Juli 2014 auch noch eine Transportbarge im Mittelmeer, die Anschlusskabel für deutsche Offshore- Windparks an Bord hatte. Die Ladung, die infolge der Havarie versunken ist, war u.a. für die OWP Butendiek und Deutsche Bucht bestimmt. 50 DEWI MAGAZIN NO. 45, AUGUST 2014