HALFEN POWERCLICK INST_PC1 11/16

Ähnliche Dokumente
HALFEN HCP INST_HCP 10/17

HALFEN PSA INST_PSA 05/17

HALFEN HBB-O INST_HBB-O 08/16

HALFEN POWERCLICK MONTAGESYSTEM HALFEN POWERCLICK FRAMING SYSTEM POWERCLICK PC Z 17

HALFEN WDI INST_WDI 03/15

Halfenschienen Curved Solution

DKR INST_DKR 08/14. DEHA Conical Pipe Anchor DEHA Konus-Rohranker Assembly Instructions Montageanleitung

FR777 Differenzial-Kulissenauszug Bodenmontage, 200 kg Tragkraft, mit Gegenführung

HALFEN KKT-E INST_KKT-E 04/13

HALFEN POWERCLICK MONTAGESYSTEM HALFEN POWERCLICK FRAMING SYSTEM POWERCLICK PC Z 09

HALFEN POWERCLICK MONTAGESYSTEM HALFEN POWERCLICK FRAMING SYSTEM POWERCLICK PC

Montageanleitung / Mounting Instruction

Telefon: +49 (0) 5251 / Telefax: +49 (0) 5251 /

DEUTSCHE NORM September 2000

Montageanleitung Installation Manual

Hypex d.o.o. Alpska cesta 43, 4248 Lesce Slovenija Tel: +386 (0) Fax: +386 (0)

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL - USER GUIDE June 2016

VGM. VGM information. HAMBURG SÜD VGM WEB PORTAL USER GUIDE June 2016

M1.2 x 8 mm M1.4 x 10 mm M0.5 - M1.2 mm

drawbar eye series 2010

Postfach / P.O.Box 1430 D Markdorf Tel.: / Fax: / 6218 Internet: Mail:

HALFEN POWERCLICK MONTAGESYSTEM HALFEN POWERCLICK FRAMING SYSTEM POWERCLICK PC Z 06

Um die Originalschrauben an den Federbeinen zu demontieren, bedarf es eines Yamaha Spezialwerkzeugs: Torxnuss T40 mit Bohrung

InductWarm. astro s. Montageanleitung InductWarm -Tische. Assembly Instruction InductWarm Tables. Version de/eng

Montageanleitung Installation instructions

Sixpack with NTC. Features / Eigenschaften. power range up to 1,2 kv / 25 A (trench) 3 Phase IGBT FRED Inverter Bridge 6-Pack flow concept NTC

Montageanleitung Installation instructions

Ladeluftkühler / Intercooler Honda Civic Type R Kit-Nr.:

Kennzeichnung der Halfenschrauben Marking of HALFEN Bolts Kenndaten auf dem Schraubenkopf Markings on the bolt head

Montage YAMAHA MT / ABS. Art.-Nr.: schwarz

Classic. Performance. Premium

SMS MULTI DISPLAY WALL

PoE Kit Mounting Instructions SG/XG 210/230/310/330/430/450

Umschaltadapter/ Changeover / Trennadapter Disconnection Adapter für LSA-PLUS NT for LSA-PLUS NT. Montageanweisung Mounting Instructions

OCT 2002 Rev A1 EC: EGD

Vordachsysteme nach DIN 18008

max. Flügelgewicht: 140 kg max. Flügelgewicht: 200 kg max. Flügelbreite: mm max. Flügelbreite: mm

Montageanleitung Schwert Assembly instructions Sword

Drehmomentvervielfältiger torque multiplier

Registration of residence at Citizens Office (Bürgerbüro)

1 Stück 2 Schellenhälften 1) 1 part 2 clamp-halves 1) l 1 h 1 e 4 s 1 RBPR-106,4 RBPR-108 RBPR-109,5 RBPR-112 RBPR-215 AP-B M 8 16 RBPR-218

Applications. General technical specifications according to ISO Parallelism mm: 5/1x0,10 L3x0,008

Applications. General technical specifications according to ISO Parallelism mm: 5/1x0,10 L3x0,008

How-To-Do. OPC-Server with MPI and ISO over TCP/IP Communication. Content. How-To-Do OPC-Server with MPI- und ISO over TCP/IP Communication

SW-MOTECH GmbH & Co. KG Ernteweg 8/ Rauschenberg Germany. Tel. +49 (0) 64 25/ Fax +49 (0) 64 25/

Montageanleitung Variable Ablegewanne (VAW Alu) Assembly instruction variable guide channel (VAW Alu)

Electrical testing of Bosch common rail solenoid valve (MV) injectors

Set T-Verbinder D28, Nut 10 Set T-Connector D28, Slot 10

Ladeluftkühler / Intercooler Renault Megane RS Kit-Nr.:

Montageanleitung DORMA MANET Concept Schiebetür an Wand / an Glas Installation DORMA MANET Concept Sliding door onto wall / onto glass

SWC SPANNLAGER UND GEHÄUSE SWC RADIAL INSERT BALL BEARINGS AND HOUSING

ArcelorMittal Distribution. Structural hollow sections Square and rectangular hollow sections

Kuhnke Technical Data. Contact Details

ERHARD is a company of. Datasheet ERHARD ECR check valve

Interconnection Technology

Deceleration Technology. Rotary Dampers with high-torque range WRD-H 0607 WRD-H 0805 WRD-H 1208 WRD-H 1610 WRD-H

FLY Klemmverbindungen FLY Clamp pipe connections

Electrical testing of Bosch common rail piezo injectors

Retraktionssystem Frankfurt Frankfurt Retraction System

19 Network Cabinet Standard with Rear Door in Full Cabinet Height. depth-adjustable 19 profiles with numbering of rack units

p^db=`oj===pìééçêíáåñçêã~íáçå=

Kennzeichnung der Halfenschrauben Marking of HALFEN Bolts Kenndaten auf dem Schraubenkopf Markings on the bolt head

Phase Connecting Elements. Earth. M16: 150 Nm Angled fixed ball point

fastpim 1 H fast switching H bridge module Features: - 1 Phase Input Rectifier Bridge - 1 Phase fast switching IGBT + FRED full H bridge - NTC

ROHRSCHELLEN SERIE C

Beipackzettel Instruction leaflet

Distanzmontageteilen. Distance rolls

Deceleration Technology. Rotary Dampers mit hohem Drehmoment WRD-H 2515 WRD-H 3015 WRD-H 4025 WRD-H

Technische Mitteilung / Service Bulletin. PRIORITY 1 Safety

Photovoltaic Mounting Material Catalogue

CERTIFICATE. The Notified Body of TÜV SÜD Industrie Service GmbH. certifies that

Monteringsanvisning. Assembly instructions. Aufbauanleitung

Montageanleitung DORMA MANET Schiebetür an Wand/an Glas Installation DORMA MANET Sliding door onto wall/onto glass

How-To-Do. Hardware Configuration of the CC03 via SIMATIC Manager from Siemens

FOX EXHAUST SYSTEMS//

CABLE TESTER. Manual DN-14003

ASSEMBLY INSTRUCTIONS MONTAGEANLEITUNG. 3 Circuit ( 230V ) Tracks and Adaptors. 3 Phasen ( 230V ) Stromschienen und Adaptoren.

TriASS Schreibtische. TriASS Schreibtischsystem Montageanleitung. TriASS Desking System Assembly Instructions. Das Assmann Prinzip. Gute Arbeit.

S PTa ankerschienen-system PTa anchor Channel system S PTU TraPezbleChbefesTigUngssChienen PTU CasT-in Channels S.

Kuhnke Technical Data. Contact Details

HPS /B Revision: 01. Hauptständer KTM 990 SM-T / SM-R '09 Center Stand KTM 990 SM-T / SM-R '09

Quadt Kunststoffapparatebau GmbH

CERTIFICATE. with the organizational units/sites as listed in the annex has implemented and maintains a Quality Management System.

Montageanleitung DORMA PT 30. Oberlichtbeschlag. Installation instruction DORMA PT 30. Overpanel patch fitting

Bedienungsanleitung Operation Manual

Montageanleitung Assembly Instruction Artikel: Werkstattschrank mit 2 Türen

Katalog / Catalogue. - Seite / Page 1/9 - Weyhe, Autoline Nr. Bezeichnung / Description. A RS repair kit

Deceleration Technology. Rotary Dampers with high-torque range WRD-H 7550 WRD-H 9565 WRD-H

D-Sub Connectors with Metal Brackets F and Accessories D-Sub Steckverbinder mit Metallwinkel F und Anbauteilen

ROHRSCHELLEN SERIE B

Zehnder CLD. Housing for walls, floors and ceilings

Montageanleitung / Mounting Instruction

Honeywell AG Hardhofweg. D Mosbach MU1H-1220GE23 R1001

rear view server cabinet perforated steel door, divided

General. Caution! Range of use. Assembly. Design. Materials. Type code. Achtung!

Aufbaudose mit Schalter Spacing box with switch. Montageanleitung mounting instructions

Network premium POP UP Display

1 Stück 2 Schellenhälften 1 part 2 clamp-halves

Art.Nr.: Rahmen544mm

Transkript:

HALFEN POWERCLICK INST_PC1 11/16 GB Systems 63, 41 and 22 D Systeme 63, 41 und 22 Assembly Instructions Montageanleitung

HALFEN POWERCLICK Assembly Instructions Channel overview HZL 63/63 toothed slotted length: 3000, 6000 mm HZL 63/63 250 14 28 HZL 41/41 50 14 28 HZL 41/22 HZL 41/41 toothed slotted length: 6000 mm 50 14 28 HZL 41/22 toothed slotted length: 6000 mm HZM 41/22D HZM 41/22 D toothed back-to-back profile length: 6070 mm Fittings HALFEN POWERCLICK System 63 (for POWERCLICK Framing channel HZL 63/63) HCS-VT 63-21/4 HCS-VT 63-23/6 HCS-VT 63-22/3 HCS-VT 63-11/2-12/2-13/2 HCS-VT 63-23/6 HCS-VT 63-14/0-15/0-16/0 HCS-VT 63-41/2 HCS-VT 63-42/2 HCS-VT 63-31/2 Fittings HCS-VT 41-... for all HALFEN POWERCLICK Framing channels All fittings are pre-assembled with bolts and can be bolted to all channels in the POWERCLICK System. 22/3 26/1 26/3 27/1 27/3 46/4s 46/4v 47/3 58/2 68/2 84/4 57/2 57/6 77/4 Explanation of numbers and see next page! 2 2016 HALFEN INST_PC1 11/16 www.halfen.com

HALFEN POWERCLICK Assembly Instructions Do not use fittings marked with for cantilever connections! Fittings marked with only suitable for loads in longitudinal direction N! 47/3 77/4 kg i Holes for bolting or fixing beam clamps. HCS-VT Fittings Torques for all HCS-VT Fittings: Hexagonal head bolts: POWERCLICK bolts: POWERCLICK bolts in stainless steel A4: 70 Nm 60 Nm 55 Nm POWERCLICK bolt Inspection hole Hexagonal head bolt 2016 HALFEN INST_PC1 11/16 www.halfen.com 3

X HALFEN POWERCLICK Assembly Instructions Assembly steps 30 mm 1 1 2 When dimensioning measuring please consider the following: channel ends have to protrude at least 30 mm out of the fittings! A) C) Insert channels as far as possible into the fitting. B) Push corner connector over the channel. Channel slot is 90 turnable by repositioning the POWERCLICK bolts. 3 Cut channels to length. Apply zinc paint to the cut edges of hot-dip galvanised channels to ensure corrosion protection. A 30 mm 4 Push on channel end cap, and apply channel closer strip as necessary. B 5 Recommendation for transport: After pre-assembly, tighten 1 horizontal and 1 vertical bolt per fitting. C 2 At assembly location: Adjust the construction by pressing the POWERCLICK bolts (A). Then tighten the bolts with the required torque (B). 3 6 The correct position of the POWERCLICK bolts ( ) can be verified through the inspection hole (diameter Ø 20 mm). 6 4 A A kg B A A 5 4 2016 HALFEN INST_PC1 11/16 www.halfen.com

H HALFEN POWERCLICK Assembly Instructions Beam clamp HCS TK-63-FV Only for use with HALFEN Channel HZL 63/63. Suitable for H = 5 up to 40 mm flange thickness L 2 x 90 mm + flange width Beam clamps used in pairs. Torque M = 45 Nm ca. 8 After tightening the nuts, check the beam clamp is securely fixed! Channel slot up or down 90 90 L Beam clamp HCS TK-L-FV For connections to steel beams with parallel or bevelled flanges. Recommandation: Use four beam clamps for connections of HCS VT 63 to steel beam. Use at least 4 beam clamps for one fitting HCS-VT 63-11 to -16. Torque M = 90 Nm Not for stainless steel connections! After tightening the nuts, check the beam clamp is securely fixed! Ensure the curved adapter plate ( ) is correctly orientated! Important note! Permissible loads and more information Catalogue PC63. Note: The general safety rules (safety regulations) and the specific regulations of the plant operator must be observed. 2016 HALFEN INST_PC1 11/16 www.halfen.com 5

HALFEN POWERCLICK Assembly Instructions Beam clamp HCS TK-FV For bolt Suitable for flange width 75 up to 300 mm flange thickness 5 up to 40 mm Torque M = 90 Nm Not for connections to stainless steel! Example: Connection of HALFEN POWERCLICK System 41 to a steel beam Additionally required articles for the illustrated application: T-head bolt HZS 41/41-gv-x100 Hexagonal head nut HALFEN Channel HZM 41/22D e.g. Fitting HCS-VT41-57/6 HALFEN Channel HZL 41/41 After tightening the nuts, check the beam clamp is securely fixed! Ensure the curved adapter plate ( ) is correctly orientated! Beam clamp HVT-41-85 6 22 75 85 65 Suitable for channels 41/41 41/22 D Suitable for H = 10 bis 220 mm flange thickness L 2 x 70 mm + flange width Beam clamps used in pairs. 70 mm 70 mm h= 10-22 mm 140 After tightening the nuts, check the beam clamp is securely fixed! L 6 2016 HALFEN INST_PC1 11/16 www.halfen.com

HALFEN POWERCLICK Montageanleitung Schienenübersicht HZL 63/63 gezahnt gelocht Länge: 3000, 6000 mm HZL 63/63 250 14 28 HZL 41/41 50 14 28 HZL 41/22 HZL 41/41 gezahnt gelocht Länge: 6000 mm 50 14 28 HZL 41/22 gezahnt gelocht Länge: 6000 mm HZM 41/22D HZM 41/22 D gezahnt Doppelprofil Länge: 6070 mm Verbindungsteile HALFEN Powerclick System 63 (für POWERCLICK Montageschiene HZL 63/63) HCS-VT 63-21/4 HCS-VT 63-23/6 HCS-VT 63-22/3 HCS-VT 63-11/2-12/2-13/2 HCS-VT 63-23/6 HCS-VT 63-14/0-15/0-16/0 HCS-VT 63-41/2 HCS-VT 63-42/2 HCS-VT 63-31/2 Verbindungsteile HCS-VT 41-... für alle HALFEN POWERCLICK Montageschienen Alle Verbindungsteile sind mit Schrauben vormontiert und an alle Schienen des HALFEN POWERCLICK-Systems anschraubbar. 22/3 26/1 26/3 27/1 27/3 46/4s 46/4v 47/3 58/2 68/2 84/4 57/2 57/6 77/4 Erläuterung der Nummern und siehe folgende Seite! 2016 HALFEN INST_PC1 11/16 www.halfen.com 7

HALFEN POWERCLICK Montageanleitung Die mit markierten Verbindungsteile nicht als Kragarmanschluss verwenden! Bei mit markierten Verbindungsteilen Kraftaufnahme nur in Längsrichtung N! 47/3 77/4 kg i Löcher für Dübelbefestigung oder Trägerklemme. Die HCS-VT Verbindungsteile Anzugsdrehmomente aller HCS-VT Verbindungsteile: Sechskantschrauben: POWERCLICK- Schrauben: POWERCLICK-Schraube in Edelstahl A4: 70 Nm 60 Nm 55 Nm Sechskantschraube POWERCLICK- Schrauben Inspektionsöffnung 8 2016 HALFEN INST_PC1 11/16 www.halfen.com

X HALFEN POWERCLICK Montageanleitung Montageschritte 30 mm 1 1 2 Beim Aufmaß berücksichtigen: Schiene muss mind. 30 mm aus dem Verbindungsteil ragen! A) C) Schienen bis zum Anschlag in die Verbindungsteile einschieben. B) Eckverbinder über die Schiene schieben. Schienenschlitz um 90 durch Umsetzen der POWERCLICK- Verschraubung drehbar. 3 Schienen ablängen und Schnittkanten von feuerverzinkten Schienen nach dem Sägen zum Korrosionsschutz mit Zinkstaubfarbe behandeln. A 30 mm 4 Profilendstopfen aufstecken, ggf. Profilabdeckung aufschieben. B C 2 5 Empfehlung für den Transport: nach erfolgter Vormontage je 1 horizontale und 1 vertikale Schraube je Verbindungsteil anziehen. Am Installationsort: die Konstruktion durch Eindrücken der POWERCLICK- Schrauben justieren (A). Dann Schrauben mit entsprechendem Drehmoment festziehen (B). 3 6 Der korrekte Sitz der POWERCLICK- Verschraubung ( ) kann durch die Inspektionsöffnung (Loch Ø 20 mm) kontrolliert werden. 6 4 A A kg B A A 5 2016 HALFEN INST_PC1 11/16 www.halfen.com 9

H HALFEN POWERCLICK Montageanleitung Trägerklemme HCS TK-63-FV Nur zur Verwendung mit dem HALFEN Schienenprofil HZL 63/63. Passend für H = 5 bis 40 mm Flanschdicke L 2 x 90 mm + Trägerflanschbreite Der Einsatz muss immer paarweise erfolgen. Anzugsdrehmoment M = 45 Nm ca. 8 Nach dem Anziehen der Muttern die Klemme auf festen Sitz prüfen! Schienenschlitz oben oder unten 90 90 L Trägerklemme HCS TK-L-FV Zum Anschluss an Stahlträger mit parallelen oder schrägen Flanschen. Empfehlung: Verwendung von jeweils vier Trägerklemmen für die Befestigung der HCS VT 63 an den Stahlträger. Mindestens 4 Klemmen pro Verbindungsteil HCS-VT 63-11 bis -16 verwenden. Anzugsdrehmoment M = 90 Nm Nicht für Edelstahl-Anschlüsse! Nach dem Anziehen der Muttern die Klemme auf festen Sitz prüfen! Auf richtigen, passgenauen Sitz der Kalottenplatte ( ) achten! Wichtiger Hinweis! Zulässige Betriebslasten sowie Angaben zur Statik siehe aktueller Katalog PC63. Hinweis: Die Allgemeinen Arbeitsschutzmaßnahmen (Betriebssicherheitsverordnung und Arbeitssicherheitsgesetz) und die besonderen Vorschriften des Betreibers sind einzuhalten. 10 2016 HALFEN INST_PC1 11/16 www.halfen.com

HALFEN POWERCLICK Montageanleitung Trägerklemme HCS TK-FV Für Schraube Passend für Flanschbreite 75 bis 300 mm Flanschhöhe 5 bis 40 mm Anzugsdrehmoment M = 90 Nm Nicht für Edelstahl-Anschlüsse! Beispiel: Anschluss HALFEN Powerclick-System 41 an einen Stahlträger Zusätzlich erforderliche Bauteile für dargestellte Anwendung: Schraube HZS 41/41-gv-x100 Sechskantmutter Halfenschiene HZM 41/22D z.b. Verbindungsteil HCS-VT41-57/6 Halfenschiene HZL 41/41 Nach dem Anziehen der Muttern die Klemme auf festen Sitz prüfen! Auf richtigen, passgenauen Sitz der Kalottenplatte ( ) achten! Trägerklemme HVT-41-85 6 22 75 85 65 Passend zu Profilen 41/41 41/22 D Passend für H = 10 bis 220 mm Flanschdicke L 2 x 70 mm + Trägerflanschbreite Der Einsatz muss immer paarweise erfolgen. 70 mm 70 mm h= 10-22 mm 140 Nach dem Anziehen der Muttern die Klemme auf festen Sitz prüfen! L 2016 HALFEN INST_PC1 11/16 www.halfen.com 11

CONTACT HALFEN WORLDWIDE HALFEN is represented by subsidiaries in the following 14 countries, please contact us: Austria Belgium / Luxembourg China Czech Republic France Germany Italy Netherlands Norway Poland Sweden Switzerland United Kingdom / Ireland United States of America HALFEN Gesellschaft m.b.h. Leonard-Bernstein-Str. 10 1220 Wien HALFEN N.V. Borkelstraat 131 2900 Schoten HALFEN Construction Accessories Distribution Co.Ltd. Room 601 Tower D, Vantone Centre No.A6 Chao Yang Men Wai Street Chaoyang District Beijing P.R. China 100020 HALFEN s.r.o. Business Center Šafránkova Šafránkova 1238/1 155 00 Praha 5 HALFEN S.A.S. 18, rue Goubet 75019 Paris HALFEN Vertriebsgesellschaft mbh Liebigstr. 14 40764 Langenfeld HALFEN S.r.l. Soc. Unipersonale Via F.lli Bronzetti N 28 24124 Bergamo HALFEN b.v. Oostermaat 3 7623 CS Borne HALFEN AS Postboks 2080 4095 Stavanger HALFEN Sp. z o.o. Ul. Obornicka 287 60-691 Poznan Halfen AB Vädursgatan 5 412 50 Göteborg HALFEN Swiss AG Hertistrasse 25 8304 Wallisellen HALFEN Ltd. A1/A2 Portland Close Houghton Regis LU5 5AW HALFEN USA Inc. PO Box 18687 San Antonio TX 78218 Phone: +43-1 - 2596770 E-Mail: office@halfen.at Internet: www.halfen.at Phone: +32-3 - 6580720 E-Mail: info@halfen.be Internet: www.halfen.be Phone: +86-10 5907 3200 E-Mail: info@halfen.cn Internet: www.halfen.cn Phone: +420-311 - 690 060 E-Mail: info@halfen-deha.cz Internet: www.halfen-deha.cz Phone: +33-1 - 44523100 E-Mail: halfen@halfen.fr Internet: www.halfen.fr Phone: +49-2173 - 9700 E-Mail: info@halfen.de Internet: www.halfen.de Phone: +39-035 - 0760711 E-Mail: tecnico@halfen.it Internet: www.halfen.it Phone: +31-74-267 1449 E-Mail: info@halfen.nl Internet: www.halfen.nl Phone: +47-51823400 E-Mail: post@halfen.no Internet: www.halfen.no Phone: +48-61 - 6221414 E-Mail: info@halfen.pl Internet: www.halfen.pl Phone: +46-31 - 985800 E-Mail: info@halfen.se Internet: www.halfen.se Phone: +41-44 - 8497878 E-Mail: info@halfen.ch Internet: www.halfen.ch Phone: +44-1582 - 470300 E-Mail: info@halfen.co.uk Internet: www.halfen.co.uk Phone: +1 800.423.91 40 E-Mail: info@halfenusa.com Internet: www.halfenusa.com Fax: +43-1 - 259-677099 Fax: +32-3 - 6581533 Fax: +86-1059073218 Fax: +420-235 - 314308 Fax: +33-1 - 44523152 Fax: +49-2173 - 970225 Fax: +39-035 - 0760799 Fax: +31-74-267 2659 Fax: +47-51823401 Fax: +48-61 - 6221415 Fax: +46-31 - 985801 Fax: +41-44 - 8497879 Fax: +44-1582 - 470304 Fax: +1 877. 683.4910 2016 HALFEN GmbH, Germany applies also to copying in extracts. For countries not HALFEN International GmbH listed Liebigstr. 14 HALFEN International 40764 Langenfeld / Germany Phone: +49-2173 - 970-0 E-Mail: info@halfen.com Internet: www.halfen.com Fax: +49-2173 - 970-849 Furthermore HALFEN is represented with sales offices and distributors worldwide. Please contact us: www.halfen.com NOTES REGARDING THIS DOCUMENT Technical and design changes reserved. The information in this publication is based on state-of-the-art technology at the time of publication. We reserve the right to make technical and design changes at any time. HALFEN GmbH shall not accept liability for the accuracy of the information in this publication or for any printing errors. The Quality Management System of HALFEN GmbH is certified for the locations in Germany, France, the Netherlands, Austria, Poland, Switzerland and the Czech Republic acc. to DIN EN ISO 9001:2015, Certificate No. 202384-2016-AQ-GER-DAkkS. www.dnvgl.com U - 543-11/16